K0911 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

The electrical wiring identified will be fixed before POC completion date. All other electrical wiring in boiler room were inspected and confirmed to be functioning. NHA or designee will…

View Full Plan Text
K0911 Correction Date: 09/16/2026 The electrical wiring identified will be fixed before POC completion date. All other electrical wiring in boiler room were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on electrical wiring requirements and routine inspections. Maintenance director or designee will boiler room electrical panel and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0911 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1) Electrical panels have been secured throughout the facility. 2) Maintenance director will be educated on securing electrical panels from unauthorized entry, in four smoke zones of the…

View Full Plan Text
K0911 Correction Date: 09/15/2026 1) Electrical panels have been secured throughout the facility. 2) Maintenance director will be educated on securing electrical panels from unauthorized entry, in four smoke zones of the component 3) NHA/designee will conduct random audits monthly and following any electrical work is completed to ensure electric panels are secure. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
K0911 · Germantown Home (PA)
Surveyed 07/01/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

During survey electrical panel was blocked by salon equipment and chair in the second-floor beauty salon. Items were immediately removed during survey. A large sign will be placed in this area…

View Full Plan Text
K0911 Correction Date: 08/25/2026 During survey electrical panel was blocked by salon equipment and chair in the second-floor beauty salon. Items were immediately removed during survey. A large sign will be placed in this area and hairdresser and housekeeping will be educated to not block this area and discuss the NFPA rule. Maintenance Director/Designee will check weekly for three months. Maintenance Director will report findings in QAPI meeting for three months.
K0911 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

Approved protective cover plates were installed on the two open ceiling junction boxes in the second-floor Dining Room. - The Maintenance Director was re-educated on National Electric Code…

View Full Plan Text
K0911 Correction Date: 07/20/2026 - Approved protective cover plates were installed on the two open ceiling junction boxes in the second-floor Dining Room. - The Maintenance Director was re-educated on National Electric Code requirements regarding enclosing open electrical wiring. - The Director of Maintenance or designee will inspect dining area ceilings weekly x 4. Monthly audits times 3 will continue with results reported to the QA Committee.
K0911 · The Village at Penn State (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. A full cover plate will be installed over the old nurse call system wiring in the beauty shop by date of compliance. 2. Maintenance staff will complete a facility walk through to inspect…

View Full Plan Text
K0911 Correction Date: 06/30/2026 1. A full cover plate will be installed over the old nurse call system wiring in the beauty shop by date of compliance. 2. Maintenance staff will complete a facility walk through to inspect areas where call bells were replaced to ensure cover plates are present. Cover plates will be installed for exposed old system wiring discovered during audit. Date of compliance June 30, 2026
K0911 · Holy Family Home (PA)
Surveyed 04/06/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. All abandoned temporary lighting and wiring above ceiling spaces were removed. 2. The Maintenance Director will review electrical systems quarterly and document compliance with NFPA 70.

View Full Plan Text
K0911 Correction Date: 05/13/2026 1. All abandoned temporary lighting and wiring above ceiling spaces were removed. 2. The Maintenance Director will review electrical systems quarterly and document compliance with NFPA 70.
K0911 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

The facility has corrected the deficiency. On March 10, 2026, all items blocking access to the electrical panels in the transfer switch room were removed to ensure proper clearance. A…

View Full Plan Text
K0911 Correction Date: 04/27/2026 The facility has corrected the deficiency. On March 10, 2026, all items blocking access to the electrical panels in the transfer switch room were removed to ensure proper clearance. A facility-wide inspection was conducted to ensure all electrical panels are accessible and compliant. The Maintenance Director or designee will monitor compliance during routine environmental rounds to ensure electrical panels remain unobstructed. Completion date: March 10, 2026.
K0911 · Accela Rehab and Care Center at Somerton (PA)
Surveyed 02/24/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies.…

View Full Plan Text
K0911 Correction Date: 04/21/2026 Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed with federal and state law requirements. Identification of other residents or areas having the potential to be affected due to the nature of the deficiency: The deficient practice has the potential to affect all residents. Corrective action 1.Missing light switch and cover replaced in laundry resident room.Maintenance director or designee to re-educate maintenance staff on the importance of maintaining light witches and covers 3.Maintenance director or designee to audit laundry rooms for missing light switches and covers. Weekly X4 monthly X2 4.Results will be reviewed at the quarterly QAPI meeting.
K0911 · Liberty Pointe Rehabilitation and Healthcare Center (PA)
Surveyed 01/20/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

A cover plate was placed on the junction box in the basement tank room. Open wires near the basement tank room were placed in a junction box. Junction box was placed above the exit sign on the…

View Full Plan Text
K0911 Correction Date: 02/23/2026 A cover plate was placed on the junction box in the basement tank room. Open wires near the basement tank room were placed in a junction box. Junction box was placed above the exit sign on the employee entrance ramp. First floor electric panel cover was repaired. Junction box plate cover repaired above the ceiling tiles at the first-floor nurse station. Maintenance to be educated on the NFPA 101 electrical system requirements. Maintenance to monitor monthly or until compliance is met. Findings will be brought to the QAPI committee.
K0911 · Fairview Rehab and Care Center (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

Maintenance team repaired the cover plates for the elevator room. Wiring to be placed in junction box that was on the second floor elevator. Emergency duplex outlet to be attached to the wall…

View Full Plan Text
K0911 Correction Date: 03/03/2026 K0911 Maintenance team repaired the cover plates for the elevator room. Wiring to be placed in junction box that was on the second floor elevator. Emergency duplex outlet to be attached to the wall near the supply room on 2nd floor corridor. Missing junction box cover plate near the laundry room above the ceiling tiles near the water heaters to be placed and repaired. Duplex outlet to get secured to the wall in the boiler room near the entrance of room. MC cable to have a juncture box added near the pipes of water in the third floor boiler room. The junction box to get a cover plate in the third floor boiler room. Maintenance to audit and replace any other Loose or broken wool mounts and wiring. Maintenance team educated on securing outlets to the walls by Regional Maintenance Director. Maintenance director to provide update at QAPI.
K0911 · Care Pavilion Nursing and Rehabilitation Center (PA)
Surveyed 12/15/2025 · Spot-checks: daily for 4 weeks
✓ Passed Re-Inspection Use K0911 →

Correction: Obstructions were removed to ensure clear access. Systemic Changes: Clearance signage was installed. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks…

View Full Plan Text
K0911 Correction Date: 01/30/2026 Correction: Obstructions were removed to ensure clear access. Systemic Changes: Clearance signage was installed. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks and monthly x 2 months. Completion Date: 1/30/26. UPDATE: Correction: Obstructions were removed to ensure clear access to community wide electrical access panels. Systemic Changes: Clearance signage was installed. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks and monthly x 2 months. The Audits will be brought to QAPI for review. Completion Date: 1/30/26.
K0911 · Sarah Reed Senior Living (PA)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. Laundry carts were immediately removed to provide clear access to the electrical panels, restoring compliance and ensuring safe access in case of emergency. 2. Maintenance to conduct a full…

View Full Plan Text
K0911 Correction Date: 01/23/2026 1. Laundry carts were immediately removed to provide clear access to the electrical panels, restoring compliance and ensuring safe access in case of emergency. 2. Maintenance to conduct a full audit of all electrical panels in the facility to ensure none are blocked. 3. Staff will be educated to keep electrical panels clear at all times by putting caution tape on floors to show staff the area's that need be remain unobstructed. 4. This will be monitored and reported at next quarterly QAPI meeting by the maintenance supervisor.
K0911 · Chapel Manor (PA)
Surveyed 12/01/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

Electrical deficiencies cited inside IT room, (corridor) at A115, 2nd Fl. at 217, 2nd Fl. Soiled Utility room and basement elevator have been repaired to ensure electrical systems are…

View Full Plan Text
K0911 Correction Date: 01/07/2026 Electrical deficiencies cited inside IT room, (corridor) at A115, 2nd Fl. at 217, 2nd Fl. Soiled Utility room and basement elevator have been repaired to ensure electrical systems are maintained. NHA will educate the Maintenance department to ensure that the electrical system is inspected and maintained per regulations. NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that the electrical system is inspected and maintained per regulations Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0911 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. On 9/22/2025 the Maintenance Supervisor installed the protective cover plates on the two electrical panels in the elevator room. On 9/22/2025 the Maintenance Director mounted the quad box…

View Full Plan Text
K0911 Correction Date: 12/29/2025 1. On 9/22/2025 the Maintenance Supervisor installed the protective cover plates on the two electrical panels in the elevator room. On 9/22/2025 the Maintenance Director mounted the quad box receptacle in the laundry folding room. 2. On 9/22/2025 the maintenance team inspected all electrical panels and quad box receptacles to verify proper mounting. 3. On 9/22/2025 the Administrator educated the Maintenance Department on K-tag 911 regarding maintaining the protection of electrical wiring. 4. The Maintenance Director/Designee will conduct audits weekly for 4 weeks to ensure no exposed wiring or cover plates for electrical panels are missing. Audits will be reviewed at the QAPI meeting held monthly.
K0911 · West Chester Rehabilitation and Healthcare Center (PA)
Surveyed 10/28/2025 · Spot-checks: monthly for 2 months
✓ Passed Re-Inspection Use K0911 →

1. The outlet in basement level employee breakroom was replaced and tested on GFCI outlet providing ground fault protection. 2. Maintenance staff were educated on GFCI regulations. 3. An Audit…

View Full Plan Text
K0911 Correction Date: 12/04/2025 1. The outlet in basement level employee breakroom was replaced and tested on GFCI outlet providing ground fault protection. 2. Maintenance staff were educated on GFCI regulations. 3. An Audit was conducted to all outlets within 18 inches of a water source to ensure proper ground fault protection was in place. Additional audits will be conducted monthly for 2 months to ensure proper ground fault protection is in place within 18 inches of a water source. Audit results will be submitted to Quality Assurance Performance Improvement Committee for additional review and recommendations as needed. Further audit frequency will be determined based on audit findings.
K0911 · Harborview Rehabilitation and Care Center at Doylestown (PA)
Surveyed 10/20/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. Maintenance staff replaced missing circuit breaker blanks in basement panel #3 and 3rd-floor panel HVAC3-B. 2. Maintenance staff re-educated on monthly panel inspection and documentation…

View Full Plan Text
K0911 Correction Date: 11/26/2025 1. Maintenance staff replaced missing circuit breaker blanks in basement panel #3 and 3rd-floor panel HVAC3-B. 2.Maintenance staff re-educated on monthly panel inspection and documentation requirements. 3. Maintenance Director /designee will conduct electrical panel audits monthly x 3. 4. Results will be reported to the QAPI Committee.
K0911 · Aventura at Pembrooke (PA)
Surveyed 08/05/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

The facility failed to maintain components of the electrical system, on one of four floors. No residents were affected. All residents have the potential to be affected. The 2nd floor resident…

View Full Plan Text
K0911 Correction Date: 09/12/2025 0911 The facility failed to maintain components of the electrical system, on one of four floors. No residents were affected. All residents have the potential to be affected. The 2nd floor resident room, a receptacle near the A-bed was repaired and a cover was installed as required. 2nd floor resident room, the reading light over the A-bed had non-terminated, exposed wiring hanging from the underside of the cover. An audit was completed by the Maintenance Director to ensure that all receptacles are installed as required and that all lights are installed as required. Director of Maintenance and maintenance staff were educated by the Administrator on the requirement. Also, maintenance director and maintenance staff were educated on requirement to audit the receptacles when installed. They were also educated that bedside lights must be inspected frequently for physical integrity. Education of floor staff (Certified nursing assistants professional nurses housekeepers) was initiated to report any damaged receptacles and over head lights to maintenance for repair. The Maintenance Director/Designee will conduct one weekly audit of random receptables for four weeks, then monthly for two months and then quarterly thereafter. In addition, auditing will occur for any newly installed receptacles and during room deep cleaning. The Maintenance Director/Designee will conduct one weekly audit for over head lamps for four weeks and then monthly for two months. Additionally, over head lamps will be audited when a repair or replacement is put in place. Results of audits will be reviewed at the Quarterly Quality Assurance and Improvement Committee Meeting over the duration of the audit process. Based on the results of the audits, a decision will be made regarding the need for continued submission and reporting.
K0911 · Concordia at Rp Home (PA)
Surveyed 06/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1) maintenance will correct junction box in ceiling at double doors of dining room. Work order on file with NHA 2) report and correction to be reported to QAPI committee.

View Full Plan Text
K0911 Correction Date: 08/15/2025 1) maintenance will correct junction box in ceiling at double doors of dining room. Work order on file with NHA 2) report and correction to be reported to QAPI committee.
K0911 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/17/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

A) Protective covers were reinstalled on both high-voltage controllers in the elevator mechanical room. b) The free-hanging junction box was secured above the exit sign. c) The loose and…

View Full Plan Text
K0911 Correction Date: 08/01/2025 a) Protective covers were reinstalled on both high-voltage controllers in the elevator mechanical room. b) The free-hanging junction box was secured above the exit sign. c) The loose and sparking receptacle was removed from service, repaired, and replaced. The circuit was checked and the panel breaker tested. Maintenance staff will be re-educated on electrical safety and securing electrical components properly. The Director of Maintenance or designee will audit for compliance. Monthly audits times 3 will continue thereafter with results reported to the QA Committee by the Director of Maintenance or designee for the next three months
K0911 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/01/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. The cover was replaced on the electric panel labeled "Boiler RM ELEC-1. 2. The electrical panels in the facility were audited to ensure covers were in place. No other covers were found to…

View Full Plan Text
K0911 Correction Date: 06/10/2025 1. The cover was replaced on the electric panel labeled "Boiler RM ELEC-1. 2. The electrical panels in the facility were audited to ensure covers were in place. No other covers were found to be missing. 3. The Director of Maintenance has been educated on the requirements for the electrical panels to have covers. 4. The facility will audit the electrical panels to ensure covers are in place 1 X monthly X 3 months. 5. Date of Compliance is June 10, 2025.
K0911 · Immaculate Mary Center for Rehabilitation & Healthcare (PA)
Surveyed 04/28/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts…

View Full Plan Text
K0911 Correction Date: 06/01/2025 This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies. It is the practice of the facility to protect electrical wiring in accordance with NFPA99 2012 edition, 6.3.2.1. Electrical Installation. 1. The electrical panel in the kitchen dry storage room that was blocked by pallets has been corrected and free from obstruction as of 5/5/2025. 2. Building wide inspection of electrical systems has been completed on 5/5/2025 and all area panels are free of storage or obstructions. 3. Education completed with Maintenance staff regarding monitoring areas for obstructions near or around electrical panels. 4. Every quarter for a year, the Maintenance Director or designee will check random areas of the facility to ensure no panels are blocked. This information will then be entered on a log and will be presented to the QAPI meeting
K0911 · Premier Washington Rehabilitation and Nursing Center (PA)
Surveyed 04/15/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

An open electrical junction box on the ceiling of the transfer switch room was identified. The cover for the box was immediately put back on Maintenance completed an audit throughout the…

View Full Plan Text
K0911 Correction Date: 05/28/2025 An open electrical junction box on the ceiling of the transfer switch room was identified. The cover for the box was immediately put back on Maintenance completed an audit throughout the facility with no other junction box issues The maintenance department will be educated to make sure all junction boxes are covered Audits will be completed by maintenance to ensure all junction boxes are covered, Weekly X4 weeks and monthly X 2. All audits will be reported to QAPI
K0911 · Inglis House (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1) At the 2 North Medical Room in front of the electrical panel the equipment will be moved. As a prevention the Engineering Director / designee will check this location as part of weekly…

View Full Plan Text
K0911 Correction Date: 05/06/2025 1) At the 2 North Medical Room in front of the electrical panel the equipment will be moved. As a prevention the Engineering Director / designee will check this location as part of weekly hallway rounds. 2) At the 2 North Electrical Closet near the housekeeping closet. The equipment will be moved from in front of the fire the electrical panel. As a prevention the Engineering Director/ designee will check this location as part of the weekly hallway rounds. 3) At the 4N air handler unit room the equipment will be moved from in from of the electrical panel. As a prevention the Engineering Director/ designee will check this location as part of the weekly hallway rounds. 4) To prevent this condition from happening again a New Life Safety Preventative Maintenance Workorder will be set up and be automatically generated annually from the Inglis Maintenance Data Base and Workorder System Mp2. There will be a task instruction to check for blocked electrical panels and removed items if any panel is blocked. 4) The Director of Engineering Services/ Designee Will Monitor This Plan
K0911 · Care Pavilion Nursing and Rehabilitation Center (PA)
Surveyed 02/18/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0911 →

Broken light switch inside the Shower Room on the third floor has been replaced. Wheelchairs blocking electrical panel on the first floor, former Smoking Lounge have been removed from the…

View Full Plan Text
K0911 Correction Date: 04/04/2025 Broken light switch inside the Shower Room on the third floor has been replaced. Wheelchairs blocking electrical panel on the first floor, former Smoking Lounge have been removed from the room. Outlet missing cover in second floor, East Social Services Office has been replaced. Junction box on third floor above smoke barrier door, next to resident room has been secured. An audit was completed of light switches inside of Shower Rooms to ensure that light switches are not broken and function properly. Where any light switches were identified to be broken or not functioning properly, they were replaced or repaired to function properly. An audit was completed of 5 random storage areas to ensure that no electrical panels are blocked by equipment. Where any electrical panels were found to be blocked by equipment, the equipment was removed. An audit was completed of 10 random offices to ensure that no outlet covers were missing or damaged. Where any outlet covers were found to be missing or damaged, they were replaced or repaired. An audit was completed above 10 random smoke barrier doors to identify any unsecured junction boxes. Where any unsecured junction boxes were identified, they were secured. Maintenance staff have been educated regarding how to identify and repair broken light switches, missing or broken outlet covers, and not ensuring that no equipment blocks electrical panels. Maintenance staff were educated regarding identifying and repairing unsecured junction boxes. Random checks for broken light switches in Shower Rooms, missing and broken outlet covers in offices, items blocking electrical panels and unsecured junction boxes will be conducted weekly x 4 weeks and then monthly x 2 months. Results of the checks will be reported during the monthly Safety Committee Meeting for any necessary recommendations for improvement.
K0911 · Edison Manor Nursing & Rehab Center (PA)
Surveyed 01/15/2025 · Spot-checks: daily for 4 weeks
✓ Passed Re-Inspection Use K0911 →

1. Oxygen cylinder carts have been removed from blocking the access to the electrical panels. 2. Nursing home administrator and/or designee will educate all facility staff on maintaining a…

View Full Plan Text
K0911 Correction Date: 02/10/2025 1. Oxygen cylinder carts have been removed from blocking the access to the electrical panels. 2. Nursing home administrator and/or designee will educate all facility staff on maintaining a clear pathway to the electrical panels. 3. Maintenance/nursing home administrator will audit access to the electrical panels is maintained daily times 5 days, weekly times 3 weeks, and monthly times 2 months.