K0511 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 07/15/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

Blanks were installed in the basement transformer room electrical panels. Circuit breakers have the potential to be effected. Maintenance will be educated on maintaining protection of…

View Full Plan Text
K0511 Correction Date: 09/01/2026 Blanks were installed in the basement transformer room electrical panels. Circuit breakers have the potential to be effected. Maintenance will be educated on maintaining protection of electrical equipment. Random audits will be conducted by the Maintenance or designee to ensure protection of electrical equipment is maintained Monthly x2 with reports to QAPI
K0511 · Lakeland Rehab and Healthcare Center (IN)
Surveyed 06/18/2026 · Spot-checks: monthly for 6 months
✓ Passed Re-Inspection Use K0511 →

Utilities - Gas and Electric The facility requests paper compliance for this citation. This plan of correction is the facility's credible allegation of compliance. Preparation and/or execution…

View Full Plan Text
K0511 Completion Date: 07/20/2026 K0511 - Utilities - Gas and Electric The facility requests paper compliance for this citation. This plan of correction is the facility's credible allegation of compliance. Preparation and/or execution of this plan of correction does not constitute admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of federal and state law. 1)Immediate actions taken for other residents: Visitors, staff, and residents that reside in the community have the potential to be affected by the alleged deficient practice. 3)Measures put into place/System changes Electrical Panel was locked 4)How the corrective action will be monitored: The Maintenance Director/Designee will audit 5 areas monthly for 6 months and present to the QAPI Committee during QAPI Meetings to ensure completion of any new necessary updates and compliance. The report will be reviewed in Quality Assurance Meeting monthly for 6 months or until 100% compliance is achieved. The QA Committee will identify any trends or patterns and make recommendations to revise the plan of correction as indicated. 20th, 5)Date of Compliance: July 2026
K0511 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/01/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The outlet in the Housekeeping Director's office has been replaced and corrected. 1. The other outlets in question have a ground fault breaker in the panel. 2. To ensure there are no other…

View Full Plan Text
K0511 Correction Date: 07/31/2026 The outlet in the Housekeeping Director's office has been replaced and corrected. 1. The other outlets in question have a ground fault breaker in the panel. 2. To ensure there are no other areas of deficient practice, the maintenance director and staff will complete a facility audit to identify any incorrect outlets. 3. The Maintenance Director and staff have been educated on safety requirements and when to use a GFCI outlet. 4. To prevent recurrence, the facility will complete monthly outlet inspections to ensure compliance. The results will be reviewed monthly at QAPI. 5. Date of compliance is 7/31/2026
K0511 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 05/01/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The 4th floor electrical panel, located across from Resident resident room, was immediately locked and secured. The Nursing Home Administrator will educate the maintenance team to ensure that…

View Full Plan Text
K0511 Correction Date: 06/03/2026 The 4th floor electrical panel, located across from Resident resident room, was immediately locked and secured. The Nursing Home Administrator will educate the maintenance team to ensure that all electrical panels are locked and secure. Random monthly audits will be done by Nursing Home Administrator/designee to ensure all electrical panels are locked and secured for compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0511 · Fairview Rehab and Care Center (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

Maintenance cleaned area around fire panels on the loading dock area and Electrical room, so nothing is Stored there. Maintenance, nursing and ISH employees getting educated to keep area clear…

View Full Plan Text
K0511 Correction Date: 03/03/2026 K0511 Maintenance cleaned area around fire panels on the loading dock area and Electrical room, so nothing is Stored there. Maintenance, nursing and ISH employees getting educated to keep area clear and clean as well as not to block any panels. Maintenance team to do weekly audits on area to ensure stays clean. Maintenance director to provide updates by qapi.
K0511 · The Williamsport Home (PA)
Surveyed 01/05/2026 · Spot-checks: weekly for 3 months
✓ Passed Re-Inspection Use K0511 →

1) The cover box on the electrical junction box located within the 1st floor nurses' station was installed. 2) A full house audit was conducted to ensure compliance. 3) Audits on electrical…

View Full Plan Text
K0511 Correction Date: 02/10/2026 1) The cover box on the electrical junction box located within the 1st floor nurses' station was installed. 2) A full house audit was conducted to ensure compliance. 3) Audits on electrical hardware will occur weekly x2 weeks and monthly thereafter for 3 months. The audits will be conducted by the Maintenance Director and/or designee. 4) Results of the audits will be reviewed at the Quality Assurance meeting to review findings
K0511 · Cedar Haven Healthcare Center (PA)
Surveyed 12/16/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The receptacle by the 1D Med. Room was replaced. Current staff re educated on use of the Tels system to request repair or replacement of any noted issues of such. Maintenance will do random…

View Full Plan Text
K0511 Correction Date: 01/21/2026 The receptacle by the 1D Med. Room was replaced. Current staff re educated on use of the Tels system to request repair or replacement of any noted issues of such. Maintenance will do random weekly audits x4 then monthly auditsx2 to identify any additional broken receptacles. Results of audits will be reviewed with the QAPI committee.
K0511 · Brickyard Healthcare - Twelfth Street Care Center (IN)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The receptacle located in the therapy room by the kitchen sink, the receptacle located in the med room by the sink, and the receptacle in the dining room by the sink were equipped with GFCI…

View Full Plan Text
K0511 Completion Date: 02/03/2026 The receptacle located in the therapy room by the kitchen sink, the receptacle located in the med room by the sink, and the receptacle in the dining room by the sink were equipped with GFCI receptacles. All residents in the areas mentioned have potential to be affected by the alleged deficient practice. A semi-annual task was added to TELS to Inspect all areas of the facility with a water source to ensure that any electrical outlet within 6 feet of the water source is equipped with a GFCI. If found, removed receptacle, properly secure wiring, and apply a cover plate, or replace receptacle with a GFCI. Maintenance will report to QAPI no less than quarterly in perpetuity regarding life safety issues.
K0511 · Amoroso Healthcare and Rehabilitation Woodridge (PA)
Surveyed 10/28/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

1. Maintenance Director was educated by the NHA on 11/7/25 regarding the need for the electrical panel doors to be locked to prevent access from residents and visitors. 2. Maintenance Director…

View Full Plan Text
K0511 Correction Date: 12/09/2025 1. Maintenance Director was educated by the NHA on 11/7/25 regarding the need for the electrical panel doors to be locked to prevent access from residents and visitors. 2. Maintenance Director did lock the electrical panels between the DON's office and NHA's office on 10/29/25. 3. Maintenance Director will QA the electrical panels weekly for 4 weeks then monthly to ensure that the electrical panel doors are locked. Results to be reviewed with the QAPI committee. 4. Compliance by 12/9/25.
K0511 · The Gardens at West Shore (PA)
Surveyed 08/20/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

1. Maintenance Director/designee will perform the appropriate repairs to the outlet in the 5/6/7 dining room by the TV. 2. Maintenance Director/designee will conduct an audit of facility…

View Full Plan Text
K0511 Correction Date: 09/23/2025 K0511 1. Maintenance Director/designee will perform the appropriate repairs to the outlet in the 5/6/7 dining room by the TV. 2. Maintenance Director/designee will conduct an audit of facility outlets to ensure they are physically operational. If they are found to be physically broken, they will be fixed promptly. 3. Maintenance/Director/designee will conduct a random audit of facility electrical outlets to ensure they are physically operational monthly. Results to QAPI. 4. Date of Compliance 9/23/25
K0511 · Wyomissing Health and Rehabilitation Center (PA)
Surveyed 08/12/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The physically broken electrical receptacle within the 2nd Floor Scheduling Office, by Resident resident room has been replaced. Monthly audits will be performed to ensure there are no…

View Full Plan Text
K0511 Correction Date: 09/30/2025 The physically broken electrical receptacle within the 2nd Floor Scheduling Office, by Resident resident room has been replaced. Monthly audits will be performed to ensure there are no physically broken electrical receptacles. The Maintenance Director will be in-serviced on the importance of not having physically broken electrical receptacles. Results of the audits will be reviewed/reported to QA Committee to determine trends & compliance. Quality Assurance Committee will determine need for continuance of audits.
K0511 · Aristacare at East Falls (PA)
Surveyed 08/04/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

1. Improper storage have been removed from within 3 feet of the electrical panel. 2. A facility audit will be completed to ensure all electrical panels are clear within 3 feet from improper…

View Full Plan Text
K0511 Correction Date: 09/08/2025 1. Improper storage have been removed from within 3 feet of the electrical panel. 2. A facility audit will be completed to ensure all electrical panels are clear within 3 feet from improper storage. 3. Random audits, weekly x4 and monthly x3, will be conducted to ensure there is a clear area within 3 feet of an electrical panel. 4. Results of the audits will reported to the QAPI committee.
K0511 · King of Prussia Skilled Nursing and Rehabilitation Center (PA)
Surveyed 07/28/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The Maintenance Director removed all Stored Linen Boxes and the room has been cleared. The Maintenance Director/Designee will educate staff to comply with NFPA 70, National Electric Code,…

View Full Plan Text
K0511 Correction Date: 08/28/2025 The Maintenance Director removed all Stored Linen Boxes and the room has been cleared. The Maintenance Director/Designee will educate staff to comply with NFPA 70, National Electric Code, Section 110.26(A)(1) for electrical Wiring and equipment The Maintenance Director or designee will do rounds throughout the day to make sure compliance is maintained. The Maintenance Director or designee will conduct the Audits Weekly x 4 and Monthly x 2 until compliance is reached.. The findings of the audits will be shared with the QAPI Committee Date of Compliance: 8/28/25
K0511 · Cathedral Village (PA)
Surveyed 07/21/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

Maintenance staff installed a GFCI breaker for the ice machine located at the Nourishment area on the third floor. Maintenance staff education on Utilities - Gas and Electric on…

View Full Plan Text
K0511 Correction Date: 08/13/2025 K 0511: Maintenance staff installed a GFCI breaker for the ice machine located at the Nourishment area on the third floor. Maintenance staff education on Utilities - Gas and Electric on 8/11/2025-8/13/2025. The Environmental Services Director or Designee will continue to monitor weekly for 4 weeks, along with quarterly inspections, document and report any items found in the Monthly Safety meetings x's 3 months
K0511 · Inglis House (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

1) In the Kitchen on the Ground Floor a GFCI will be installed by the sink. 2) To prevent this condition from happening again a task will be added to the Weekly Dietary Inspection Preventative…

View Full Plan Text
K0511 Correction Date: 05/06/2025 1) In the Kitchen on the Ground Floor a GFCI will be installed by the sink. 2) To prevent this condition from happening again a task will be added to the Weekly Dietary Inspection Preventative Maintenance Workorder which is automatically generated from the Inglis Maintenance Data Base and Workorder System, to check and make sure all receptacles within 6 feet of a sink or water supply are GFCI protected. The rest of Inglis House has a weekly check by the Engineering Director's / designee "Weekly Rounds" and documentation is kept at the Engineering Office. The Director of Engineering Services/ designee Will Monitor This Plan
K0511 · Accela Rehab and Care Center at Somerton (PA)
Surveyed 03/18/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies.…

View Full Plan Text
K0511 Correction Date: 05/12/2025 Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed with federal and state law requirements. Identification of other residents or areas having the potential to be affected due to the nature of the deficiency: The deficient practice has the potential to affect all residents. Corrective action 1. Items blocking electrical panel immediately removed 2. Maintenance director or designee to re-educate maintenance staff on the importance of not blocking electrical panels 3. Maintenance director or designee to audit random electrical panels to ensure clearance. Weekly X4 monthly X3 4. Results will be reviewed at the quarterly QAPI meeting.
K0511 · Manatawny Center for Rehabilitation and Nursing (PA)
Surveyed 01/15/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

1. The Maintenance Director installed a cover plate for the electrical junction box to ensure the wiring is properly protected and secure. 2. The Maintenance Director and relevant staff…

View Full Plan Text
K0511 Correction Date: 02/11/2025 1. The Maintenance Director installed a cover plate for the electrical junction box to ensure the wiring is properly protected and secure. 2. The Maintenance Director and relevant staff members will receive training on NFPA 70, National Electric Code, with a focus on proper installation and maintenance of electrical wiring and equipment. 3. The Maintenance Director/designee will conduct a thorough inspection of electrical junction boxes and wiring throughout the facility to verify compliance with NFPA 70 standards. Any additional areas of concern will be addressed immediately. Monthly audits of electrical junction boxes and wiring will be conducted by the Maintenance Director/designee to ensure continued compliance with NFPA 70. Findings will be documented and reported for further action, if necessary. 4.Findings will be reviewed at the Quality Assurance Performance Improvement meeting.
K0511 · Rest Haven-York (PA)
Surveyed 01/13/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0511 →

The classroom electrical receptable has been replaced. The facility will have all the electrical receptacles checked to ensure the physical integrity of electrical receptacles. Director of…

View Full Plan Text
K0511 Correction Date: 02/14/2025 The classroom electrical receptable has been replaced. The facility will have all the electrical receptacles checked to ensure the physical integrity of electrical receptacles. Director of Operations or designee will complete 10% monthly audits in each facility component to ensure the physical integrity of electrical receptacles. The QAPI Committee will review the reports at their quarterly meeting and make recommendations for any deficient patterns identified. Decreasing or elimination of this tool will occur only upon recommendation of the Interdisciplinary QAPI Committee at their quarterly meeting.
K0511 · Hamilton Arms Center (PA)
Surveyed 09/22/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use K0511 →

1. Repair performed on electrical panel box LP-2 located on second floor. Keys removed from unauthorized persons. 2. All electrical panel boxes were checked by the maintenance director to…

View Full Plan Text
K0511 Correction Date: 11/03/2026 1. Repair performed on electrical panel box LP-2 located on second floor. Keys removed from unauthorized persons. 2. All electrical panel boxes were checked by the maintenance director to assure they were locked. 3. Education will be provided to all staff on the fact that only authorized persons can have access to the electrical panel boxes. Panel boxes are to be locked at all times. 4. Weekly audits will occur for 1 month. Audits will be conducted by the maintenance director or designee. 5. Results of the audits will be reviewed by the QAPI committee. 6. Date Certain is 11-3-26
K0511 · The Gardens at West Shore (PA)
Surveyed 09/09/2026 · Spot-checks: monthly for 12 months
Approved Filing Use K0511 →

1. The broken electrical receptacle in resident resident room by resident room was replaced. 2. Maintenance Director/Designee will conduct random monthly audits of resident rooms to ensure…

View Full Plan Text
K0511 Correction Date: 10/20/2026 K0511 1. The broken electrical receptacle in resident resident room by resident room was replaced. 2. Maintenance Director/Designee will conduct random monthly audits of resident rooms to ensure that electrical outlets are free of damage for 12 months. Results to QAPI. 3. Date of Compliance 10/20/26
K0511 · Yorkview Nursing and Rehabilitation (PA)
Surveyed 05/06/2025 · Spot-checks: daily for 4 weeks
Approved Filing Use K0511 →

Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is…

View Full Plan Text
K0511 Correction Date: 05/27/2025 Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is prepared and/or executed by provision of Federal or State Law. 1. The identified broken electrical receptacle was replaced. 2. Completion date 5/7/25. 3. Facility staff will be educated to observe for broken electrical outlets during routine daily rounds and replace immediately if identified. 4. The Maintenance Director/Designee will audit component for any broken outlets quarterly. Trends will be reported to the QAPI committee for further action planning. 5. Date of Compliance May 27, 2025.