Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
K0374 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: monthly for 3 months
1. Self-closures have been ordered by Susquehanna Door for all 7 cited hazardous area doors. As soon as the closures are in stock, they will be installed. 2. All facility hazardous area doors…
View Full Plan Text
K0374 Correction Date: 09/30/2026
1. Self-closures have been ordered by Susquehanna Door for all 7 cited hazardous area doors. As soon as the closures are in stock, they will be installed.
2. All facility hazardous area doors will be inspected to ensure proper functioning self-closures are in place and latching properly.
3. Director of Environmental Services or designee will audit hazardous area doors for proper self-closure monthly for 3 months, and then quarterly for 3 quarters. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0374 · Concordia at Rp Home (PA)
Surveyed 08/17/2026 · Spot-checks: weekly for 4 weeks
1) Door closuring has been ordered (8/14/26) ) and is scheduled to be installed on 10/20/2026. 2) Maintenance will audit all doors to ensure working properly and then will audit quarterly…
View Full Plan Text
K0374 Correction Date: 10/01/2026
1) Door closuring has been ordered (8/14/26) ) and is scheduled to be installed on 10/20/2026. 2) Maintenance will audit all doors to ensure working properly and then will audit quarterly thereafter to ensure working condition.
K0374 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
The two barrier doors identified will be fixed before POC completion date. All other barrier doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance…
View Full Plan Text
K0374 Correction Date: 09/16/2026
The two barrier doors identified will be fixed before POC completion date. All other barrier doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on barrier requirements and routine inspections. Maintenance director or designee will audit barrier doors and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0374 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: monthly for 4 weeks
1) Broken self-closing device on the right-side leaf, facing the exit of the Smoke Barrier door, in the 200 Hallway by resident room has been repaired. 2) Maintenance director will be educated…
View Full Plan Text
K0374 Correction Date: 09/15/2026
1) Broken self-closing device on the right-side leaf, facing the exit of the Smoke Barrier door, in the 200 Hallway by resident room has been repaired. 2) Maintenance director will be educated on maintaining the self-closing device on Smoke Barrier doors. 3) Maintenance director will conduct random audits monthly to ensure self-closing devices are functioning. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations
K0374 · John J Kane Regional Center- Ross Township (PA)
Surveyed 07/21/2026 · Spot-checks: daily for 4 weeks
1. Identified penetration above smoke door in pantry E-278 was corrected by sealing and patching the penetration. 2. ESM or designee will audit for penetrations throughout facility. 3.…
View Full Plan Text
K0374 Correction Date: 08/14/2026
1. Identified penetration above smoke door in pantry E-278 was corrected by sealing and patching the penetration.
2. ESM or designee will audit for penetrations throughout facility.
3. Maintenance and Housekeeping staff will be educated on identifying and reporting penetrations.
4. ESM or designee will audit for penetrations during environmental rounds daily x1 business week, weekly x3 until substantial compliance is achieved.
5. Date of compliance: 8/14/2026
K0374 · John J Kane Regional Center - Glen Hazel (PA)
Surveyed 07/15/2026 · Spot-checks: weekly for 4 weeks
It is the policy of the facility to comply with NFPA Life Safety Code: Subdivision of Building Spaces Smoke Barrier The following work orders have been submitted and are in process: 1. Smoke…
View Full Plan Text
K0374 Correction Date: 08/13/2026
It is the policy of the facility to comply with NFPA Life Safety Code: Subdivision of Building Spaces Smoke Barrier The following work orders have been submitted and are in process:
1. Smoke barrier door 2012 exiting by the dock would not close and latch
2. Smoke barrier door A-337 would not close or latch.
3. Penetration in the walls in the following areas: Rooms/Areas: 486-489 A-237 Hallway 3B 2A 223-235 252 286-298 During weekly environmental rounds, Environmental Services Manager will check doors ensure they are properly closing and latching as well as walls/ceilings for areas of pentration.
K0374 · Providence Point Healthcare Residence (PA)
Surveyed 07/06/2026 · Spot-checks: weekly for 8 weeks
1. Door sweep installed on 7/16/2026 on basement smoke barrier doors to reduce gap to less than inch. 2. Smoke barrier doors will audited each week for 8 weeks to ensure there are no excessive…
View Full Plan Text
K0374 Correction Date: 07/31/2026
1. Door sweep installed on 7/16/2026 on basement smoke barrier doors to reduce gap to less than inch.
2. Smoke barrier doors will audited each week for 8 weeks to ensure there are no excessive gaps measuring more than inch.
3. Results of audits will be reported at quarterly QA meetings.
4. EVS Director will be responsible for this plan of correction.
K0374 · Avalon Care Center (PA)
Surveyed 06/16/2026 · Spot-checks: weekly for 4 weeks
On June 16th, 2026, Maintenance adjusted the barrier doors near resident room and it is now positively latching. Maintenance will perform an audit of all smoke barrier doors to ensure all…
View Full Plan Text
K0374 Correction Date: 07/16/2026
On June 16th, 2026, Maintenance adjusted the barrier doors near resident room and it is now positively latching. Maintenance will perform an audit of all smoke barrier doors to ensure all doors are positively latching.
K0374 · Yorkview Nursing and Rehabilitation (PA)
Surveyed 06/09/2026 · Spot-checks: weekly for 4 weeks
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is…
View Full Plan Text
K0374 Correction Date: 07/24/2026
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is prepared and/or executed by provision of Federal or State Law.
1. The 2nd floor, B Wing, cross corridor smoke barrier doors, by Resident resident room, now fully close and latch within the frame.
2. Additional smoke barrier doors on A, B, C, and Service Wings will be checked to ensure the doors fully close and latch within the frame.
3. Maintenance Department will test smoke barrier doors during routine maintenance rounds monthly to ensure the doors fully close and latch within the frame.
4. The Maintenance Director/designee will audit smoke barrier doors weekly x 4 week to ensure they fully close and latch within the frame and thereafter quarterly. Findings will be reported to the monthly QAPI committee for further action planning.
5. Date of compliance: 7/24/26
K0374 · Riverstreet Manor (PA)
Surveyed 04/27/2026 · Spot-checks: weekly for 4 weeks
All smoke barrier doors will be inspected and repaired promptly as needed. Future inspections will occur annually and will be monitored through TELS work order system and documentation will be…
View Full Plan Text
K0374 Correction Date: 06/26/2026
All smoke barrier doors will be inspected and repaired promptly as needed. Future inspections will occur annually and will be monitored through TELS work order system and documentation will be filed in Life Safety Binder.
K0374 · The Gardens for Memory Care at Easton (PA)
Surveyed 04/20/2026 · Spot-checks: weekly for 4 weeks
1. The smoke barrier separation doors have been adjusted to fully close upon release from their respective magnetic hold-open devices. 2. The smoke barrier door deficiencies will be reviewed…
View Full Plan Text
K0374 Correction Date: 05/19/2026
K0374
1. The smoke barrier separation doors have been adjusted to fully close upon release from their respective magnetic hold-open devices.
2. The smoke barrier door deficiencies will be reviewed x4 weekly and then monthly.
3. Review of audits will be reviewed weekly.
4. Audits of the smoke barrier separation doors audits will be submitted weekly for 4 weeks, then monthly report to QAPI
5. Date of Compliance: May 19, 2026
K0374 · Linwood Nursing and Rehabilitation Center (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
The 1st floor (400 hall) double smoke barrier door right leaf latch was adjusted to insure positive latching. No other doors were affected. The Director of Maintenance/designee will audit the…
View Full Plan Text
K0374 Correction Date: 04/21/2026
The 1st floor (400 hall) double smoke barrier door right leaf latch was adjusted to insure positive latching. No other doors were affected. The Director of Maintenance/designee will audit the smoke barrier door right leaf latch, resident room door latch (F-363) and 3 other random door latches (5 doors total) 1x/week for 4 weeks, then 1x/ month for 2 months to ensure the door latches are positively latching. The results of the audit will be presented to the QA committee for review and recommendations.
K0374 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
On March 26, 2026, the smoke barrier doors on the first floor near medical records were repaired and adjusted to ensure they properly latch when tested. A facility-wide inspection of all smoke…
View Full Plan Text
K0374 Correction Date: 04/27/2026
On March 26, 2026, the smoke barrier doors on the first floor near medical records were repaired and adjusted to ensure they properly latch when tested. A facility-wide inspection of all smoke barrier doors was conducted to ensure compliance. The Maintenance Director or designee will monitor compliance during routine environmental rounds to ensure all smoke barrier doors remain in proper working order. Completion date: March 26, 2026.
K0374 · Bethlehem North Skilled Nursing and Rehabilitation Center (PA)
Surveyed 02/24/2026 · Spot-checks: weekly for 4 weeks
Nursing promptly removed the dietary food cart from blocking the 2nd floor doors. Staff was educated at the time of removal. NHA or designee will be rounding on the units during meal time to…
View Full Plan Text
K0374 Correction Date: 03/24/2026
Nursing promptly removed the dietary food cart from blocking the 2nd floor doors. Staff was educated at the time of removal. NHA or designee will be rounding on the units during meal time to ensure no dietary carts are blocking the doors. This will occur twice a week at various meal times.
K0374 · Edenbrook South (PA)
Surveyed 02/18/2026 · Spot-checks: weekly for 4 weeks
1. The cleaning cart was removed from the area of the South-West smoke barrier separation door. A review will be completed to validate items are not present that would prevent smoke barrier…
View Full Plan Text
K0374 Correction Date: 04/07/2026
1. The cleaning cart was removed from the area of the South-West smoke barrier separation door. A review will be completed to validate items are not present that would prevent smoke barrier doors from closing upon activation of the building fire alarm system. The Maintenance Department and Housekeeping staff will receive education related to maintaining items an adequate distance from smoke barrier separation doors to permit closing of the doors with activation of the building fire alarm system.
2. Audits will be conducted by the Maintenance Director/designee to validate that items are not preventing closure of smoke barrier doors with activation of the building fire alarm system. Audits will be conducted weekly for four weeks and then monthly for two months. Audit results will be submitted to the facility QAPI (Quality Assurance Performance Improvement) Committee for review. Date of compliance: April 7, 2026.
K0374 · Embassy of Hearthside (PA)
Surveyed 02/09/2026 · Spot-checks: weekly for 4 weeks
The damaged hardware on the Heirloom Smoke Barrier door was replaced on 2/18/2026. Maintenance will continue to monitor during annual door inspections and will report findings to QAPI.
View Full Plan Text
K0374 Correction Date: 03/30/2026
The damaged hardware on the Heirloom Smoke Barrier door was replaced on 2/18/2026. Maintenance will continue to monitor during annual door inspections and will report findings to QAPI.
K0374 · New Eastwood Healthcare and Rehabilitation Center (PA)
Surveyed 01/22/2026 · Spot-checks: weekly for 4 weeks
1. The Birchwood smoke barrier separation door was adjusted to ensure there is no door drag. 2. All smoke barrier doors were audited to ensure there is no door drag. 3. The Director of…
View Full Plan Text
K0374 Correction Date: 02/24/2026
1. The Birchwood smoke barrier separation door was adjusted to ensure there is no door drag.
2. All smoke barrier doors were audited to ensure there is no door drag.
3. The Director of Maintenance will complete a weekly audit x4 weeks and then monthly x3 months to ensure there is no door drag noted.
4. The Director of Maintenance or designee will report identified areas of concern through the Quality Assurance process monthly.
K0374 · Kadima Rehabilitation & Nursing at Washington (PA)
Surveyed 01/20/2026 · Spot-checks: monthly for 4 weeks
Based on observation and interview, it was determined that the facility failed to maintain smoke barrier doors in one instance. - The smoke barrier doors were repaired on 2/5/2026 with a new…
View Full Plan Text
K0374 Correction Date: 02/12/2026
-Based on observation and interview, it was determined that the facility failed to maintain smoke barrier doors in one instance. - The smoke barrier doors were repaired on 2/5/2026 with a new device to allow the doors to close properly and fully. -The Maintenance Director will be re-educated by the Licensed Administrator on the requirements and facility policy to ensure monthly and annual inspections are completed. -The Maintenance Director or designee will review quarterly to ensure completion of the plan of correction and report findings to the QA to ensure regulatory compliance.
K0374 · Canterbury Place (PA)
Surveyed 01/13/2026 · Spot-checks: monthly for 4 weeks
The fire door identified as not fully latching was immediately inspected by the Maintenance Director upon identification of the concern. Fire doors remain closed until latch can be replaced.…
View Full Plan Text
K0374 Correction Date: 02/28/2026
The fire door identified as not fully latching was immediately inspected by the Maintenance Director upon identification of the concern. Fire doors remain closed until latch can be replaced. No residents reside in this area of the building. No residents were harmed as a result of this issue. All fire doors throughout the building were inspected by the Maintenance Director or designee to ensure they close and latch properly. No additional doors identified Documentation of inspections was completed to confirm compliance. Maintenance staff have been re-educated on fire door requirements by the maintenance director, including the importance of proper latching and unobstructed closure. Fire door checks will now be included in routine preventative maintenance rounds and life safety audits. The Maintenance Director, or designee will conduct monthly fire door audits to verify proper closure and latching. Findings will be documented and reviewed by the Administrator/designee. Any deficiencies identified will be corrected immediately, and trends will be monitored to ensure sustained compliance. Corrective actions will be implemented on of before 02/28/26. Ongoing monitoring and auditing will continue monthly thereafter. Results of audits will be reviewed and recorded in QAPI.
K0374 · Embassy of East Mountain (PA)
Surveyed 01/13/2026 · Spot-checks: monthly for 4 weeks
On 1/21/2026 the Maintenance Director adjusted the 300 Hall smoke barrier separation doors to ensure proper closure. Education was provided to the maintenance director on the requirement /…
View Full Plan Text
K0374 Correction Date: 02/09/2026
On 1/21/2026 the Maintenance Director adjusted the 300 Hall smoke barrier separation doors to ensure proper closure. Education was provided to the maintenance director on the requirement / importance of ensuring proper closure and sealing of smoke barrier separation doors. An inspection of similar areas throughout the facility yielded no other non compliant doors. Inspection of doors will occur monthly and documented in the facilities preventive maintenance system, TELS. Results of this inspection will be reviewed at the facilities next QAPI meeting.
K0374 · Elan Skilled Nursing and Rehab, A Jewish Senior Life Community (PA)
Surveyed 12/03/2025 · Spot-checks: weekly for 4 weeks
Elan Skilled Nursing & Rehab (facility) submits this Plan of Correction under procedures established by the Department of Health in order to comply with the Department's directive to change…
View Full Plan Text
K0374 Correction Date: 01/13/2026
Elan Skilled Nursing & Rehab (facility) submits this Plan of Correction under procedures established by the Department of Health in order to comply with the Department's directive to change conditions which the Department alleges are deficient under State and Federal regulations relating to long term care. This Plan of Correction should not be construed as either a waiver of the facility's right to appeal or an admission of past or ongoing violations of State and Federal regulatory requirements. K 0374 Subdivision of Building Spaces-Smoke Barriers The basement level cross corridor separation doors near receiving had the frame repaired and is latching properly. The cross corridor separation doors on the 5th Floor near resident room, 4th Floor near resident room and 4th Floor near resident room all latches were adjusted and functioning properly. An initial audit will be conducted by the Maintenance Director/designee of all facility cross corridor separation doors to identify improper functioning and repaired if identified. The NHA will educate the Maintenance Director and Maintenance Staff on Regulation 0374 Subdivision of Building Spaces-Smoke Barriers. Random audits will be conducted by the Maintenance Director/designee of cross corridor separation doors throughout the facility to verify ongoing compliance. The audits of 5 random doors will be conducted weekly x 4 weeks then monthly x 3 months. Results of the audits will be brought to the QAPI Committee monthly x 3 months for review.
K0374 · Graduate Post Acute (PA)
Surveyed 11/24/2025 · Spot-checks: monthly for 3 weeks
Maintenance installed smoke seals on both doors and adjusted them to close smoke tight. Maintenance director to audit smoke doors have seal and close smoke tight. NHA/Designee will in service…
View Full Plan Text
K0374 Correction Date: 01/15/2026
Maintenance installed smoke seals on both doors and adjusted them to close smoke tight. Maintenance director to audit smoke doors have seal and close smoke tight. NHA/Designee will in service maintenance to ensure all doors have seal and are smoke tight NHA/Designee will audit smoke doors to ensure doors are sealed and close smoke tight. Audits will be completed three times a week for 3 weeks and 2 times monthly for 2 months. Audits will be reviewed by the QAPI committee during Quality Assurance meetings, and any variances will be addressed.
K0374 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
1. On 9/22/2025 the Maintenance Director adjusted the double corridor doors leading to the West Wing to ensure the doors close properly and resist the passage of smoke. 2. On 9/22/2025 the…
View Full Plan Text
K0374 Correction Date: 12/29/2025
1. On 9/22/2025 the Maintenance Director adjusted the double corridor doors leading to the West Wing to ensure the doors close properly and resist the passage of smoke.
2. On 9/22/2025 the Maintenance Director inspected all smoke doors to verify that they closed smoke tight.
3. On 9/22/2025 the NHA educated the maintenance team on maintaining smoke barrier doors in accordance with NFPA 101 requirements.
4. The Maintenance Director/designee will conduct weekly audits for 4 weeks to verify that smoke barrier doors are in accordance with NFPA 101 requirements. Results of the audits will be reviewed at the QAPI meeting held monthly.
K0374 · West Chester Rehabilitation and Healthcare Center (PA)
Surveyed 10/28/2025 · Spot-checks: weekly for 4 weeks
1. The facility is requesting a time limited waiver for the doors near resident room to be adjusted/replaced per contractor recommendation to properly close to be smoke tight. 2. Maintenance…
View Full Plan Text
K0374 Correction Date: 12/17/2025
1. The facility is requesting a time limited waiver for the doors near resident room to be adjusted/replaced per contractor recommendation to properly close to be smoke tight.
2. Maintenance staff were educated on fire door codes and requirements.
3. The Maintenance Director or Designee will conduct an audit for five smoke barrier doors weekly for 4 weeks followed by monthly for 2 months to ensure doors properly close to be smoke tight. Audit results will be submitted to Quality Assurance Performance Improvement Committee for additional review and recommendations as needed. Further audit frequency will be determined based on audit findings.
K0374 · Kingston Court Skilled Nursing and Rehabilitation Center (PA)
Surveyed 09/23/2025 · Spot-checks: weekly for 4 weeks
1. Cannot be retroactively corrected. Self closing fixture has been applied to beauty shop door. 2. All residents have the potential to be affected. 3. Education will be provided to the…
View Full Plan Text
K0374 Correction Date: 10/21/2025
1. Cannot be retroactively corrected. Self closing fixture has been applied to beauty shop door.
2. All residents have the potential to be affected.
3. Education will be provided to the maintenance department regarding the requirements of K372. 4. 4 random audits of self closing doors will completed weekly x 4 weeks and then monthly x 2 months to ensure proper function. Results will be presented to QAPI committee until substantial compliance is demonstrated.
5. Date of compliance: 10/21/2025.