Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
K0225 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 07/15/2026 · Spot-checks: monthly for 4 weeks
The fourth floor the center stairway latches.. The first floor kitchen stairway latches. The stairwells doors have the potential to be affected. Maintenance will be educated on maintaining…
View Full Plan Text
K0225 Correction Date: 09/01/2026
The fourth floor the center stairway latches.. The first floor kitchen stairway latches. The stairwells doors have the potential to be affected. Maintenance will be educated on maintaining stairwell doors Random audits will be conducted by the Maintenance or designee to ensure stairwells doors are maintained Monthly x2 with reports to QAPI
K0225 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
Stairways and Smokeproof Enclosures: The facility had two unprotected penetrations of the stair tower located next to the Zone 1 Therapy Room around a metallic-clad electrical cable and blue…
View Full Plan Text
K0225 Correction Date: 08/05/2026
0225 Stairways and Smokeproof Enclosures: The facility had two unprotected penetrations of the stair tower located next to the Zone 1 Therapy Room around a metallic-clad electrical cable and blue wires, above the suspended ceiling of the Therapy Room. No residents were identified. All residents have the potential to be affected. Maintenance Director sealed all open areas in Zone 1 Therapy Room using an approved through penetration fire stop system, and above the suspended ceiling of the Therapy Room with appropriate fire-resistant materials on 09JUL2026. Facility wide audit was completed by the Maintenance Director/Designee on 09JUL2026 to address any unprotected penetrations. 21JUL2026, NHA educated Maintenance Staff and team on the requirements to ensure all penetrations are sealed appropriately/ Maintenance will maintain the rating of all stair towers per regulation. Maintenance Director/Designee will conduct a compliance audit monthly x4 months, then quarterly to ensure requirements are met. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
K0225 · York South Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/30/2026 · Spot-checks: monthly for 4 weeks
#1 Door may be replaced or penetrations will be addressed by replacing hardware and sealing any further penetrations with appropriate rated sealants. Outside vendor has been acquired for this…
View Full Plan Text
K0225 Correction Date: 08/26/2026
#1 Door may be replaced or penetrations will be addressed by replacing hardware and sealing any further penetrations with appropriate rated sealants. Outside vendor has been acquired for this repair/replacement. Time Limited Waiver for Door Purchase requested and sent via USPS to Charles Schlegel. Requested date for Time Limited Waiver is 12/31/2026. The Maintenance Director will conduct and document an initial facility wide audit, then proceed with monthly door/fire door inspections using the facility's standardized checklist to ensure there are no penetrations or missing fire rated hardware components. The Administrator will review all completed inspection checklists on a monthly basis to verify compliance and ensure that any identified issues are addressed promptly. Findings and corrective actions will be tracked and trended to identify any patterns or recurring concerns. #2 Monthly fire door inspection reports will be submitted to the QAPI Committee for review at each quarterly meeting. The QAPI Committee will review trends, evaluate the effectiveness of corrective actions, and make recommendations for further improvement as needed.
K0225 · Cliveden Nursing and Rehabilitation Center (PA)
Surveyed 06/22/2026 · Spot-checks: weekly for 4 weeks
The electric bike has been removed. - The door at the first-floor stair tower in the lobby has been repaired - The maintenance team has conducted a full facility wide assessment, and no other…
View Full Plan Text
K0225 Correction Date: 08/10/2026
- The electric bike has been removed. - The door at the first-floor stair tower in the lobby has been repaired - The maintenance team has conducted a full facility wide assessment, and no other broken doors or improper storage was noted. - Facility Educator or designee will In service staff on the importance of not storing items in the stair towers. - Maintenance Director and/or team will conduct facility rounds weekly x 4 weeks to ensure compliance in all areas. - Results will be reported in monthly QAPI
K0225 · The Village at Penn State (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 5 months
1. Paint supplies were removed from 2nd floor stair tower. 2. Paint contractor was verbally educated that supplies cannot be stored in stairwells. 3. "No Storage" signage will be placed in…
View Full Plan Text
K0225 Correction Date: 07/06/2026
1. Paint supplies were removed from 2nd floor stair tower.
2. Paint contractor was verbally educated that supplies cannot be stored in stairwells. 3. "No Storage" signage will be placed in alcoves of stairwells.
4. EVS Director/ designee will round weekly x one month then monthly for 5 months to ensure there is no storage in stairwells. Audit results will be reported to the Quality Assurance Performance Improvement committee for review and recommendation.
5. Date of compliance June 30, 2026
K0225 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. The facility repaired the positive latching hardware on the Zone 5 stairtower double doors leading to the "D" Wing to ensure the doors positively latch and maintain the required fire…
View Full Plan Text
K0225 Correction Date: 06/25/2026
1. The facility repaired the positive latching hardware on the Zone 5 stairtower double doors leading to the "D" Wing to ensure the doors positively latch and maintain the required fire resistance rating of the stairtower enclosure in accordance with NFPA 101 requirements.
2. The Director of Plant Operations, or designee, conducted an inspection of stairtower doors within the facility to verify positive latching hardware was present and functioning properly. Any identified deficiencies were corrected immediately through repair or replacement of hardware as needed.
3. Inspections will be conducted monthly and documented by the Maintenance Department. In addition, maintenance staff were educated on NFPA 101 requirements related to fire-rated door assemblies and stair enclosure integrity. All staff were educated to report any door that does not close and positively latch properly to the Maintenance Department.
4. The Director of Plant Operations, or designee, will: - Conduct and document monthly inspections of fire-rated stairwell doors for three months, then quarterly thereafter. - Maintain inspection logs for review during Quality Assurance and Performance Improvement (QAPI) meetings. - Immediately correct any identified deficiencies.
K0225 · Rose City Nursing and Rehab at Lancaster (PA)
Surveyed 05/06/2026 · Spot-checks: weekly for 4 weeks
Crown Fire Door Products was contacted and provided a quote to replace the door gap solutions hardware. The vendor will educate the Maintenance Director on how to install the door gap…
View Full Plan Text
K0225 Correction Date: 06/30/2026
Crown Fire Door Products was contacted and provided a quote to replace the door gap solutions hardware. The vendor will educate the Maintenance Director on how to install the door gap solutions properly. The door gap solutions will be replaced and installed per manufacturer's specifications for (a) 3rd floor front stair tower top; (b) 2nd floor front stair tower top; (c) 1st floor rear tower stair tower latch side and top. The vendor will educate the Maintenance Director on how to properly install the hardware. The stair tower door gap solution hardware will be repaired/replaced per manufacturer specifications for (a) 3rd floor front stair tower fire rated tag is now legible; (b) 2nd floor front stair tower; and (c) 1st floor back stair tower. Building wide audit of the stair tower doors having appropriate gap solution hardware was completed. Audits will be done monthly to ensure hardware is intact, legible and follows manufacturer guidelines.
2. Maintenance Director will audit weekly x 2 weeks, then monthly x 2, then monthly ongoing. Results of audits will be submitted to monthly QAPI for review and recommendations.
K0225 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 05/01/2026 · Spot-checks: monthly for 4 weeks
The 2nd floor door to the stairtower, by Resident resident room, will be adjusted to positively latch within the door frame. The Nursing Home Administrator will educate the Maintenance…
View Full Plan Text
K0225 Correction Date: 06/03/2026
The 2nd floor door to the stairtower, by Resident resident room, will be adjusted to positively latch within the door frame. The Nursing Home Administrator will educate the Maintenance Director and Maintenance team to ensure all doors are positively latched with the frame. Random monthly audits will be done by the Maintenance Director/designee to ensure all compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0225 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
1. Adjustments were made to B1, center stair tower doors door to ensure it fully closes and latch within its frame. Facility staff will monitor the doors to ensure they operate as design to…
View Full Plan Text
K0225 Correction Date: 06/09/2026
1. Adjustments were made to B1, center stair tower doors door to ensure it fully closes and latch within its frame. Facility staff will monitor the doors to ensure they operate as design to fully close and latch within its frame on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0225 · Pocopson Home (PA)
Surveyed 04/01/2026 · Spot-checks: weekly for 4 weeks
1. Maintenance will remove the recessed fire extinguisher cabinet and place two 5/8 pieces of drywall in opening. The fire extinguisher will be relocated. The Maintenance department will…
View Full Plan Text
K0225 Correction Date: 04/24/2026
1. Maintenance will remove the recessed fire extinguisher cabinet and place two 5/8 pieces of drywall in opening. The fire extinguisher will be relocated. The Maintenance department will maintain the rating of all stair towers and will inspect for penetrations and door latching within door frames during their weekly maintenance rounds. Audit results will be reported to the Quality Improvement/Infection Control Committee. Preparation and submission of this Plan of Correction is required by State and Federal law. This Plan of Correction does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding.
K0225 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
All penetrations in stairwell C around the sprinkler pipe on the first floor, stair tower C to be sealed with intumescent caulk. Materials used are in accordance with ATSM #814 (UL1479)…
View Full Plan Text
K0225 Correction Date: 05/15/2026
All penetrations in stairwell C around the sprinkler pipe on the first floor, stair tower C to be sealed with intumescent caulk. Materials used are in accordance with ATSM #814 (UL1479) Outside contractor policy developed to ensure that any outside vendors or in house personnel seal any created penetrations to NFPA 101 standards. Quarterly inspections on fire barriers placed into Maintenance program for documentation of compliance. This will be reviewed during quarterly Quality Assurance committee meeting that includes the Executive Director/Nursing Home Administrator, Directo of Nursing, and Director of Facility Operations.
K0225 · Marywood Heights (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
Facility had identified damage on door prior to survey. On 1/9/26 a new door was ordered for replacement. Upon arrival, door was damaged and had to be sent back for replacement on 2/20/26. New…
View Full Plan Text
K0225 Correction Date: 03/31/2026
Facility had identified damage on door prior to survey. On 1/9/26 a new door was ordered for replacement. Upon arrival, door was damaged and had to be sent back for replacement on 2/20/26. New door has been ordered with no delivery date by Kelly Brothers. Will be replaced by Kelly Brothers once arrive. Maintenance Director or designee will complete quarterly audits and submit to QAPI committee to ensure doors are in appropriate condition.
K0225 · Edenbrook South (PA)
Surveyed 02/18/2026 · Spot-checks: weekly for 4 weeks
1. The trash can located within the basement-level portion of the exit stair tower has been removed. A review will be completed of exit stair tower to validate proper maintenance of the…
View Full Plan Text
K0225 Correction Date: 04/07/2026
1. The trash can located within the basement-level portion of the exit stair tower has been removed. A review will be completed of exit stair tower to validate proper maintenance of the enclosure. The Maintenance Department will be educated related to the maintenance of exit stair tower enclosures.
2. Audits will be conducted by the Maintenance Director/designee to validate that exit stair tower enclosures are maintained. Audits will be conducted weekly for four weeks and then monthly for two months. Audit results will be submitted to the facility QAPI (Quality Assurance Performance Improvement) Committee for review. Date of compliance: April 7, 2026.
K0225 · The Williamsport Home (PA)
Surveyed 01/05/2026 · Spot-checks: monthly for 3 months
1) The chairs and items stored under the stairs of the middle stair tower were removed. 2) A full house audit was conducted by the Maintenance Director/and or designee. 3) The Maintenance…
View Full Plan Text
K0225 Correction Date: 02/10/2026
1) The chairs and items stored under the stairs of the middle stair tower were removed. 2) A full house audit was conducted by the Maintenance Director/and or designee. 3) The Maintenance Director and/or designee will complete audits x2 weeks and monthly thereafter for 3 months to ensure compliance. 4) The results of the audits will be reviewed at the Quality Assurance meeting for comments or suggestions.
K0225 · Cedar Crest Post Acute (PA)
Surveyed 12/17/2025 · Spot-checks: monthly for 4 weeks
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies herein. To remain in compliance with all federal and…
View Full Plan Text
K0225 Correction Date: 01/15/2026
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies herein. To remain in compliance with all federal and state regulations the center has taken, or will take the actions set forth in the following plan of correction.
1. A. West stair tower door will be adjusted by the Maintenance Director and/or designee to ensure there are no gaps between the door and frame. B. North stair tower door will be adjusted by the Maintenance Director and/or designee to ensure there are no gaps between the door and frame. C. First floor stair tower door near 124 will be adjusted by the Maintenance Director and/or designee to ensure there are no gaps between the door and frame.
2. Monthly audit will be completed for gaps in doors by Maintenance Director/designee. Identified areas of concern will be addressed. Identified trends to be reviewed during QAPI.
K0225 · Riverton Rehabilitation and Healthcare Center (PA)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
1) Stairwell was cleaned out and door ways were cleared on 12/9/2025. Plans to repair the ceiling were established same day. 2) An initial audit was completed of back stairwell organization…
View Full Plan Text
K0225 Correction Date: 01/06/2026
1) Stairwell was cleaned out and door ways were cleared on 12/9/2025. Plans to repair the ceiling were established same day. 2) An initial audit was completed of back stairwell organization and safety. Variances were addressed at the time of the audit and placed on the facility audit tool. 3) The Maintenance Director/Designee re-educated maintenance staff of the Policy and Procedure for facility stairwells. 4) The Maintenance Director/Designee will complete random audits of the facility back stairwell to ensure organization and safety precautions are in place three times per week for two weeks, weekly for four weeks and monthly for two months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendations as needed.
K0225 · Chapel Manor (PA)
Surveyed 12/01/2025 · Spot-checks: weekly for 4 weeks
East Stair Tower and Middle Stair Tower doors have been repaired to ensure the doors close and latch as designed. NHA will educate the Maintenance department to ensure that fire rated doors…
View Full Plan Text
K0225 Correction Date: 01/07/2026
East Stair Tower and Middle Stair Tower doors have been repaired to ensure the doors close and latch as designed. NHA will educate the Maintenance department to ensure that fire rated doors close and latch as designed. NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that fire rated doors close and latch as designed. Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0225 · Amoroso Healthcare and Rehabilitation Woodridge (PA)
Surveyed 10/28/2025 · Spot-checks: weekly for 4 weeks
1. Maintenance Director was educated by the NHA on the need to have penetrations protected on 11/7/25 to maintain the rating of the stair towers. 2. The Maintenance Director did protect the…
View Full Plan Text
K0225 Correction Date: 12/09/2025
1. Maintenance Director was educated by the NHA on the need to have penetrations protected on 11/7/25 to maintain the rating of the stair towers.
2. The Maintenance Director did protect the penetration with an approved through penetration fire stop system on 10/30/25 to maintain the rating of the stair towers.
3. The maintenance director will follow any construction that is completed in the facility to ensure that any penetrations are protected to maintain the rating of the stair towers Results to be reviewed withe the QAPI committee.
4. Compliance by 12/9/25.
K0225 · The Pavilion at Saint Luke Village (PA)
Surveyed 09/22/2025 · Spot-checks: weekly for 4 weeks
1. Boxes were removed from the D stairwell at the time of survey. 2. A baseline observation audit was completed of all stairwell compartments to ensure that there were no boxes or other…
View Full Plan Text
K0225 Correction Date: 10/14/2025
1. Boxes were removed from the D stairwell at the time of survey.
2. A baseline observation audit was completed of all stairwell compartments to ensure that there were no boxes or other objects and all were in accordance with the regulation, with no issues identified.
3. The Executive Director/designee will educate the Maintenance Director on the importance of NFPA 101 STANDARD Stairways and Smokeproof Enclosures and ensuring there are no boxes or other objects in the stairwell compartments.
4. Observation audits will be completed of all stairwell compartments to ensure that they remain free of boxes or other objects and are in accordance with the regulation weekly x4 weeks then monthly x2 months. Any findings will be reported to the monthly QAPI committee for review and revision.
K0225 · Normandie Ridge (PA)
Surveyed 09/11/2025 · Spot-checks: weekly for 4 weeks
1. The unprotected penetration of the sprinkler pipe has been corrected using an approved through penetration fire stop system. 2. The facility will maintain the rating of the stairtowers.…
View Full Plan Text
K0225 Correction Date: 09/22/2025
1. The unprotected penetration of the sprinkler pipe has been corrected using an approved through penetration fire stop system.
2. The facility will maintain the rating of the stairtowers. Maintenance will conduct audits after all work is completed to ensure that penetrations are sealed as needed so the fire resistance rating is not compromised. Audits will also be conducted semi-annually for wear and tear or any additional work completed.
3. The Facilities Director/designee will perform random audits once weekly for three months and bring results to QAPI.
K0225 · Jewel Healthcare and Rehabilitation Center (PA)
Surveyed 08/14/2025 · Spot-checks: weekly for 4 weeks
1. L cart and boxes were removed from under the stairs 2. Maintenance director and or designee will educate staff on proper storage per NFPA guidelines 3. Maintenance director and or designee…
View Full Plan Text
K0225 Correction Date: 09/25/2025
1. L cart and boxes were removed from under the stairs
2. Maintenance director and or designee will educate staff on proper storage per NFPA guidelines
3. Maintenance director and or designee will conduct random weekly audits for 4 weeks, then monthly for 3 on proper NFPA storage. Findings to be discussed in qapi
K0225 · Wyomissing Health and Rehabilitation Center (PA)
Surveyed 08/12/2025 · Spot-checks: weekly for 4 weeks
POC date 8.28.2025 1) On 9.30.2025 quotes will be obtained for the replacement of doors that exit to stair tower enclosures that lack a minimum 60-minute fire resistance rating. 2) A TLW…
View Full Plan Text
K0225 Correction Date: 09/30/2025
POC date 8.28.2025 1) On 9.30.2025 quotes will be obtained for the replacement of doors that exit to stair tower enclosures that lack a minimum 60-minute fire resistance rating. 2) A TLW request will be submitted as a precautionary measure in the event the doors cannot be installed prior to the date of compliance. 3) Quarterly audits will be performed by the Maintenance Director to ensure all stair tower doors have a minimum of a 60-minute fire rating. 4) Weekly audits will be performed by the Maintenance Director on all doors having less than 60-minute fire rating to ensure safety of residents and staff. These actions will be in addition to the required annual fire door audits and will continue until needed repairs have been completed. 5) Corrective action will be completed by 2-6-2026. 6) The Maintenance Director will be in-serviced on importance of maintaining a 60-minute fire rating on stair tower doors. 7) Results of the audits will be reviewed/reported to QA Committee to determine trends and compliance. QA committee will determine need for continuance of audits.
K0225 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 07/16/2025 · Spot-checks: monthly for 4 weeks
1. Basement D Wing door has been corrected. 2. NHA or designee will provide re-education to the facility maintenance personnel and employees who use this door how to report a needed repair and…
View Full Plan Text
K0225 Correction Date: 09/14/2025
1. Basement D Wing door has been corrected.
2. NHA or designee will provide re-education to the facility maintenance personnel and employees who use this door how to report a needed repair and that doors must properly close and latch in frame.
3. Maintenance director or designee will complete random audits monthly for two months to ensure doors properly close and latch in frame. Maintenance director will audit stair tower doors on a quarterly basis to ensure doors close and latch in frame. Audit findings will be reported to the QAPI meeting for review and recommendations.
K0225 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 05/20/2025 · Spot-checks: monthly for 4 weeks
1. Adjustments were made to the first floor, center stair tower doors door to ensure it fully closes and latches within its frame. All repairs and adjustments were made immediately. Facilities…
View Full Plan Text
K0225 Correction Date: 06/19/2025
1. Adjustments were made to the first floor, center stair tower doors door to ensure it fully closes and latches within its frame. All repairs and adjustments were made immediately. Facilities staff will monitor the doors to ensure they operate as designed to fully close and latch within its frame on a monthly basis during facility rounds for the next three months. Non-compliance will be reported at the Quality Assurance Committee.
K0225 · Marywood Heights (PA)
Surveyed 05/19/2025 · Spot-checks: monthly for 4 weeks
The hardware for the Basement level stair tower enclosure was corrected. Director of Maintenance or designee will conduct random audits monthly times 2 months to ensure hardware on doors is in…
View Full Plan Text
K0225 Correction Date: 05/23/2025
The hardware for the Basement level stair tower enclosure was corrected. Director of Maintenance or designee will conduct random audits monthly times 2 months to ensure hardware on doors is in place.