Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
K0223 · Concordia at Rp Home (PA)
Surveyed 08/17/2026 · Spot-checks: weekly for 4 weeks
1) New Door and/or latch will be replaced at the linen supply closet to ensure self-closing. 2)New Door and/or latch will be replaced at the third floor nutrition room to ensure self-closing.…
View Full Plan Text
K0223 Correction Date: 10/01/2026
1) New Door and/or latch will be replaced at the linen supply closet to ensure self-closing. 2)New Door and/or latch will be replaced at the third floor nutrition room to ensure self-closing. 3) Maintenance will audit all doors and then audit quarterly to ensure all doors are self-closing as required by regulation.
K0223 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
The two doors identified will be fixed before POC completion date. All other self-closing doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance…
View Full Plan Text
K0223 Correction Date: 09/16/2026
The two doors identified will be fixed before POC completion date. All other self-closing doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on door requirements and routine inspections. Maintenance director or designee will audit self-closing doors and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0223 · Providence Point Healthcare Residence (PA)
Surveyed 07/06/2026 · Spot-checks: weekly for 8 weeks
1. Self-Closing Mechanism on the IT room on the third floor was fixed and put pack into place on 7/6/2026. 2. 5 random doors with self-closing mechanisms will be audited each week for 8 weeks…
View Full Plan Text
K0223 Correction Date: 07/31/2026
1. Self-Closing Mechanism on the IT room on the third floor was fixed and put pack into place on 7/6/2026. 2. 5 random doors with self-closing mechanisms will be audited each week for 8 weeks to ensure properly functioning.
3. Results of audits will be reported at quarterly QA meetings.
4. EVS Director will be responsible for this plan of correction.
K0223 · Phoebe Allentown Health Care Center (PA)
Surveyed 06/23/2026 · Spot-checks: monthly for 4 weeks
A. Double doors were corrected to fully latch together on 07/02/2026. B. Educate staff on fire safety to include holding doors open with unauthorized means. Will Include this information when…
View Full Plan Text
K0223 Correction Date: 08/03/2026
A. Double doors were corrected to fully latch together on 07/02/2026. B. Educate staff on fire safety to include holding doors open with unauthorized means. Will Include this information when onboarding new staff. Make this information available when staff attend their onboarding orientation. Perform monthly rounds for a quarter to make sure we are compliant and report out on our findings in our monthly QAPI meeting.
K0223 · Park Lane Post Acute LLC (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
1. The oxygen concentrator obstructing the basement physical therapy office door was removed and was closed immediately. 2. Inspection Audit was completed for all doors not to be obstructed.…
View Full Plan Text
K0223 Correction Date: 06/30/2026
1. The oxygen concentrator obstructing the basement physical therapy office door was removed and was closed immediately.
2. Inspection Audit was completed for all doors not to be obstructed.
3. Root cause was determined to be lack of staff understanding the necessity of keeping doors closed and not propped open. The staff will be educated by the Director of Environmental / designee on policy and procedures on how to maintain self-closing doors to be free of obstruction.
4. Maintenance Director or designee will perform random audits of self-closing doors to ensure they are not propped open by unauthorized means. Audits will occur weekly x 4 weeks, then monthly thereafter or until compliance is achieved. Any issues with the audits will be presented to QAPI committee for follow-up as needed.
K0223 · Southmont of Presbyterian Seniorcare (PA)
Surveyed 05/13/2026 · Spot-checks: weekly for 4 weeks
The mechanical resident room door in the main kitchen, the Vending area door, and the Center laundry room door were all immediately adjusted to ensure the door is self-closing and latches to…
View Full Plan Text
K0223 Correction Date: 06/15/2026
The mechanical resident room door in the main kitchen, the Vending area door, and the Center laundry room door were all immediately adjusted to ensure the door is self-closing and latches to maintain the smoke compartment. The Maintenance Director will educate the maintenance staff that all doors must close and latch at all times. The maintenance director will audit 3 doors once a month for the next three months and report his findings to the QA committee.
K0223 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
A) An end cap was installed for D4 front Solarium door self-closer system. Facility staff will monitor the doors to ensure they maintain the necessary components on a monthly basis for 3…
View Full Plan Text
K0223 Correction Date: 06/09/2026
a) An end cap was installed for D4 front Solarium door self-closer system. Facility staff will monitor the doors to ensure they maintain the necessary components on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee. b) Adjustments were made to C3 rear Solarium left door to ensure it fully closes and latches within its frame. Facility staff will monitor the doors to ensure they operate as designed to fully close and latch with-in its frame on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee. c) Facility staff has removed the unapproved door holder from the C3 Custodian room door near Resident resident room. Facility staff will be educated on not altering self-locking door mechanisms. Facilities staff will monitor self-locking door mechanisms for any alterations on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0223 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: monthly for 4 weeks
The facility has corrected the deficiency. On March 25, 2026, all identified self-closing doors were repaired and adjusted to ensure they properly close and latch when tested. A facility-wide…
View Full Plan Text
K0223 Correction Date: 04/27/2026
The facility has corrected the deficiency. On March 25, 2026, all identified self-closing doors were repaired and adjusted to ensure they properly close and latch when tested. A facility-wide inspection of all self-closing doors was completed to ensure compliance. The Maintenance Director or designee will monitor compliance by conducting routine inspections of self-closing doors during monthly environmental rounds. Completion date: March 25, 2026.
K0223 · Greenfield Healthcare and Rehabilitation Center (PA)
Surveyed 01/28/2026 · Spot-checks: monthly for 4 weeks
1. A self-closing device was added to the East wing, soiled utility room. 2. The other soiled utility doors have been inspected by Maintenance have a self-closing device. 3. Quality Assurance…
View Full Plan Text
K0223 Correction Date: 02/24/2026
1. A self-closing device was added to the East wing, soiled utility room.
2. The other soiled utility doors have been inspected by Maintenance have a self-closing device.
3. Quality Assurance Committee will receive a monthly report from maintenance on status of building inspections. Monitored by the Administrator or designee.
K0223 · The Manor at St. Luke Village (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
1. The two observed doors were adjusted and both doors close and latch into the frame. 2. A Facility-wide audit will be completed to ensure doors, when released latch into the frame. 3. The…
View Full Plan Text
K0223 Correction Date: 02/14/2026
1. The two observed doors were adjusted and both doors close and latch into the frame.
2. A Facility-wide audit will be completed to ensure doors, when released latch into the frame.
3. The Administrator, or designee will educate the Maintenance Technicians on doors with self-closing devices must latch into the frame upon release.
4. The Maintenance Technician or designee will audit 5 doors with self-closing devices a week for 4 weeks, 5 doors with self-closing devices a month for 2 months to ensure doors properly latch into the frames when released. The results of the audits will be forwarded to QAPI committee for further review and recommendations.
5. The anticipated date of compliance is: February 14, 2026.
K0223 · Chapel Manor (PA)
Surveyed 12/01/2025 · Spot-checks: weekly for 4 weeks
Magnetically held fire door that failed to release when tested was repaired. NHA will educate the Maintenance Department on ensuring magnetically held fire doors release as designed.…
View Full Plan Text
K0223 Correction Date: 01/07/2026
Magnetically held fire door that failed to release when tested was repaired. NHA will educate the Maintenance Department on ensuring magnetically held fire doors release as designed. NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that magnetically held doors release. Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0223 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
1. On 10/2/2025 the Maintenance Director repaired the magnetic housing device in the first-floor laundry folding room. The Maintenance Director also adjusted the hardware on the door to…
View Full Plan Text
K0223 Correction Date: 12/29/2025
1. On 10/2/2025 the Maintenance Director repaired the magnetic housing device in the first-floor laundry folding room. The Maintenance Director also adjusted the hardware on the door to achieve positive latching.
2. On 10/2/2025 the Maintenance Director inspected all doors with a mag lock assembly to verify proper functionality and positive latching.
3. On 10/2/2025 the NHA educated the maintenance team on maintaining doors to hazardous areas enclosures are maintained and doors positively latch in accordance with NFPA 101 requirements.
4. The Maintenance Director/designee will conduct weekly audits for 4 weeks to verify that enclosures are maintained, and doors positively latch per NFPA 101 requirements. Results of the audits will be reviewed at the QAPI meeting held monthly.
K0223 · Sunnyview Nursing and Rehabilitation Center (PA)
Surveyed 07/24/2025 · Spot-checks: monthly for 4 weeks
Install new door coordinator to ensure positive latching during door closing. Monthly audits will be held to ensure doors have positive latching to the frame. Results of the audits will be…
View Full Plan Text
K0223 Correction Date: 09/07/2025
Install new door coordinator to ensure positive latching during door closing. Monthly audits will be held to ensure doors have positive latching to the frame. Results of the audits will be brought up at the monthly meeting and added to the minutes to ensure compliance and further need of audits.
K0223 · The Gardens at Easton (PA)
Surveyed 05/29/2025 · Spot-checks: weekly for 4 weeks
1. Basement level, north wing door repaired and now latches appropriately. Basement level, supply storage door wedge removed. Basement level kitchen door was repaired to fully close and latch…
View Full Plan Text
K0223 Correction Date: 07/28/2025
1. Basement level, north wing door repaired and now latches appropriately. Basement level, supply storage door wedge removed. Basement level kitchen door was repaired to fully close and latch appropriately.
2. Facility house wide education done to re-educate staff to no prop open doors.
3. Maintenance Director/designee rounds and audits will be done to ensure doors are working properly and no propped doors are found weekly x4 weeks then monthly x2 months
4. Will report findings to QAPI.
K0223 · Marywood Heights (PA)
Surveyed 05/19/2025 · Spot-checks: monthly for 4 weeks
The following doors were corrected and latch properly: 3rd floor supply room, 2nd floor linen, clean utility room 2nd floor. Director of Maintenance or designee will conduct random audits…
View Full Plan Text
K0223 Correction Date: 05/23/2025
The following doors were corrected and latch properly: 3rd floor supply room, 2nd floor linen, clean utility room 2nd floor. Director of Maintenance or designee will conduct random audits monthly times 2 months to ensure doors are latching properly.
K0223 · York South Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/19/2025 · Spot-checks: daily for 7 days
Trash Bag removed from swing path of Dish washing Room door enabling door to self close and be fully operational. Education with Dietary Staff in regards to deficient practice as well as…
View Full Plan Text
K0223 Correction Date: 06/24/2025
Trash Bag removed from swing path of Dish washing Room door enabling door to self close and be fully operational. Education with Dietary Staff in regards to deficient practice as well as random audits to kitchen area will be conducted daily for 7 days, then weekly for 4 weeks, then monthly and forwarded to QAPI for review. Date of Compliance: June 24, 2025
K0223 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/01/2025 · Spot-checks: weekly for 4 weeks
1. The door to the elevator room in the basement has been repaired to positively latch. 2. Like doors to hazardous area enclosures were audited to ensure they are self-closing and positively…
View Full Plan Text
K0223 Correction Date: 06/10/2025
1. The door to the elevator room in the basement has been repaired to positively latch.
2. Like doors to hazardous area enclosures were audited to ensure they are self-closing and positively latching.
3. The Director of Maintenance and maintenance staff were educated on the regulation to ensure that doors to hazardous areas enclosures are self-closing and positively latch.
4. The facility will audit doors to hazardous area enclosures to ensure they are self-closing and positively latching as required by regulation. The audit results will be reviewed at QAPI.
5. Date of compliance: June 10, 2025.
K0223 · Lehigh Valley Hospital Transitional Skilled Unit (PA)
Surveyed 04/29/2025 · Spot-checks: weekly for 4 weeks
1. Latch was adjusted on storage room door on 4/30/2025. 2. Director of Engineering/designee will inspect all other doors with self-closing devices to ensure proper latch. 3. Routine…
View Full Plan Text
K0223 Correction Date: 05/20/2025
1. Latch was adjusted on storage room door on 4/30/2025.
2. Director of Engineering/designee will inspect all other doors with self-closing devices to ensure proper latch.
3. Routine inspections of doors with self closing devices will be completed by engineering department.
4. Reports will be submitted to QAPI for review and recommendations.
K0223 · Embassy of Hearthside (PA)
Surveyed 03/26/2025 · Spot-checks: daily for 4 weeks
New door handle installed and tested. All is functioning properly. -Audit done on other doors with the potential for like concerns. -Staff reminded to place a communication into maintain with…
View Full Plan Text
K0223 Correction Date: 04/24/2025
-New door handle installed and tested. All is functioning properly. -Audit done on other doors with the potential for like concerns. -Staff reminded to place a communication into maintain with other identified -Leadership will make daily observations on this concern during rounding and address as identified.
K0223 · Embassy of East Mountain (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
Kitchen storage room door was shut immediately Telephone / Storage room door was repaired to ensure proper latching into frame Kitchen staff reeducated on keeping storage room door closed.…
View Full Plan Text
K0223 Correction Date: 05/05/2025
Kitchen storage room door was shut immediately Telephone / Storage room door was repaired to ensure proper latching into frame Kitchen staff reeducated on keeping storage room door closed. Random audit of doors to be completed to ensure proper latching into the frame along with closure of kitchen door. Will be completed weekly x' 4 then monthly x's 2 with results to QAPI for review and recommendation.
K0223 · New Eastwood Healthcare and Rehabilitation Center (PA)
Surveyed 09/15/2026 · Spot-checks: weekly for 4 weeks
1a. The single doors in the corridor on the Ground floor, Dietary, were repaired and adjusted to latch positively. 1b. The Dining room doors on the second floor were repaired and adjusted to…
View Full Plan Text
K0223 Correction Date: 10/02/2026
K0223 1a. The single doors in the corridor on the Ground floor, Dietary, were repaired and adjusted to latch positively. 1b. The Dining room doors on the second floor were repaired and adjusted to latch positively. 2) The Plant Operations Director will be educated by the NHA and the Plant Operations Regional Manager on the proper codes and requirements to make sure doors latch positively throughout the center.
3. The Plant Operations Director / Designee to complete audits weekly x 4 weeks and monthly thereafter to identify and correct any doors that fail to latch positively in the center. 4) The results of these audits will be submitted to QAPI committee monthly for review and recommendations as needed.
K0223 · John J Kane Regional Center- Scott Township (PA)
Surveyed 08/27/2026 · Spot-checks: weekly for 4 weeks
Resident room-A. The identified deficiency was corrected at the time of survey. Weekly, the ESM and/or designee will inspect and test doors throughout the facility with self-closing devices/…
View Full Plan Text
K0223 Correction Date: 10/05/2026
resident room-A. The identified deficiency was corrected at the time of survey. Weekly, the ESM and/or designee will inspect and test doors throughout the facility with self-closing devices/ door closers and devices that release automatically when required by fire alarm/smoke detector system. Audit sheets will be available for review. Results will be reported to the Quality Improvement Committee for review.
K0223 · Edison Manor Nursing & Rehab Center (PA)
Surveyed 01/14/2026 · Spot-checks: weekly for 2 weeks
1. Facility immediately replaced the self closing device arm on the maintenance department door. 2. Facility audited all doors to ensure all had the self closing device if necessary 3.…
View Full Plan Text
K0223 Correction Date: 02/10/2026
1. Facility immediately replaced the self closing device arm on the maintenance department door.
2. Facility audited all doors to ensure all had the self closing device if necessary
3. Facility Maintenance department was educated of the necessity of self closing devices on doors by the nursing home administrator.
4. The Nursing Home Administrator/Designee will audit self closing devices are connected and functioning 2x weekly for 2 weeks, Weekly for 2 weeks, monthly for 2 months. Results of audits will be submitted to the Quality Assurance Performance Improvement Committee for review and recommendations.
K0223 · Kadima Rehabilitation & Nursing at New Castle (PA)
Surveyed 05/29/2025 · Spot-checks: weekly for 4 weeks
Doors with Self-Closing Devices 1. Upon inspection of the south stairwell door, it was discovered that the door did not fully close due to possible humidity. 2. The Maintenance Director…
View Full Plan Text
K0223 Correction Date: 07/18/2025
K0223: Doors with Self-Closing Devices 1.Upon inspection of the south stairwell door, it was discovered that the door did not fully close due to possible humidity. 2.The Maintenance Director adjusted the door to properly latch in the frame on 6/3/2025. 3.The Maintenance Director will audit the door weekly for the next four weeks, then add all self-closing doors as part of the Preventative Maintenance Program. 4.The Maintenance Director will review results with the Safety and Quality Assurance and Performance Improvement Committees.