Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
K0211 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: monthly for 3 months
1. The unattached metal barrier was permanently removed from the exit path of egress. 2. All facility emergency exit paths will be inspected to ensure no barriers are blocking the exit path of…
View Full Plan Text
K0211 Correction Date: 09/30/2026
1. The unattached metal barrier was permanently removed from the exit path of egress.
2. All facility emergency exit paths will be inspected to ensure no barriers are blocking the exit path of egress.
3. Director of Environmental Services or designee will audit emergency exit paths monthly for 3 months and then quarterly for 3 quarters to ensure compliance. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0211 · Sunnyview Nursing and Rehabilitation Center (PA)
Surveyed 07/23/2026 · Spot-checks: weekly for 4 weeks
The facility will remove the posted exit sign that is located to the right of the activity's door. The facility will add signage " Not an Exit". Weekly audits to ensure proper signage are…
View Full Plan Text
K0211 Correction Date: 09/08/2026
The facility will remove the posted exit sign that is located to the right of the activity's door. The facility will add signage " Not an Exit". Weekly audits to ensure proper signage are posted on the activity's door. Education will take place to educate staff on the differences of Emergency Exit and Not an exit signage.
K0211 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: weekly for 4 weeks
A "Not an Exit" sign was installed on the second-floor double doors leading to the enclosed courtyard near the elevator. - The Maintenance Director was re-educated on egress identification…
View Full Plan Text
K0211 Correction Date: 07/20/2026
A "Not an Exit" sign was installed on the second-floor double doors leading to the enclosed courtyard near the elevator. - The Maintenance Director was re-educated on egress identification standards and labeling doors that could be mistaken for exit routes. - The Director of Maintenance or designee will audit courtyard doors weekly X
4. Monthly audits times 3 will continue with results reported to the QA Committee.
K0211 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/01/2026 · Spot-checks: weekly for 4 weeks
1. The exit door in the basement emergency door near the freight elevator was repaired so it opens as designed. 2. To ensure that no other doors were opening incorrectly, other doors in the…
View Full Plan Text
K0211 Correction Date: 07/31/2026
1. The exit door in the basement emergency door near the freight elevator was repaired so it opens as designed.
2. To ensure that no other doors were opening incorrectly, other doors in the facility were tested to verify they open correctly.
3. The Maintenance Director and staff were educated on the regulations for exit doors to open as designed and without force.
4. To prevent recurrence, the facility exit doors will be audited to ensure they open correctly. The audits will occur weekly X 4 weeks, bi-weekly X 4 weeks, and monthly X 1 month. All results will be reviewed at QAPI.
5. Date of compliance is 7/31/2026
K0211 · Embassy of Scranton (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
The boxes stored in the second-floor exit access corridor were removed. The Maintenance Director/Designee will audit random exit corridors weekly x 4 weeks, then monthly to ensure there is no…
View Full Plan Text
K0211 Correction Date: 06/30/2026
The boxes stored in the second-floor exit access corridor were removed. The Maintenance Director/Designee will audit random exit corridors weekly x 4 weeks, then monthly to ensure there is no storage blocking egress to the exit accesses. These audits will be brought to the monthly QAPI committee meeting for further review and recommendations.
K0211 · Rose City Nursing and Rehab at Lancaster (PA)
Surveyed 05/06/2026 · Spot-checks: weekly for 2 weeks
Maintenance Director will inspect and adjust the hinges/hardware to allow the doors to be open without having to use 30 pounds of pressure to open. Unsheltered person was a visitor and left…
View Full Plan Text
K0211 Correction Date: 06/30/2026
Maintenance Director will inspect and adjust the hinges/hardware to allow the doors to be open without having to use 30 pounds of pressure to open. Unsheltered person was a visitor and left property; the table and chair o front porch were removed from within swing of the exterior exit door at time of observation. The table and chair were removed from in front of the front lobby exit door, and the improper signage was removed from the front lobby exit door. Building wide audit of exterior exit door areas was completed. Random audits will be done weekly to ensure there is no blockage of the exterior exit doors "swing area".
2. Maintenance Director, or designee, will document and audit (a) there are no obstacles for exterior exit "swing area"; (b) there are no obstacles in front of front lobby exit door. Audits will be done weekly for 2 weeks, then monthly for two months, then monthly ongoing. Results of audits will be submitted to monthly QAPI for review and recommendations.
K0211 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
A) The chair and bedside table were removed from D5 rear exit door. Facility staff will be educated to not block exit doors. Facilities staff will monitor for items blocking exit doors on a…
View Full Plan Text
K0211 Correction Date: 06/09/2026
a) The chair and bedside table were removed from D5 rear exit door. Facility staff will be educated to not block exit doors. Facilities staff will monitor for items blocking exit doors on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee. b) The plastic floor signs were removed from behind the smoke doors on D3 near the Dining room. Facility staff will be educated to not impede automatic door closures. Facilities staff will monitor for items impeding automatic door closures on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0211 · Immaculate Mary Center for Rehabilitation & Healthcare (PA)
Surveyed 04/01/2026 · Spot-checks: monthly for 4 weeks
It is the practice of the facility to maintain means of egress and all residents had the potential to be affected by this deficiency. 1. The two patients' lifts have been moved and no longer…
View Full Plan Text
K0211 Correction Date: 05/08/2026
It is the practice of the facility to maintain means of egress and all residents had the potential to be affected by this deficiency.
1. The two patients' lifts have been moved and no longer obstruct the stair tower on the third floor.
2. All stair towers were checked for obstruction in the path of egress on 4/02/2026 and found to be free from obstructions.
3. The Director of Maintenance has completed training and education with Maintenance staff and nursing regarding monitoring egress paths and moveable equipment to remain free from the exit discharge paths.
4. Every quarter for a year the Maintenance Director or designee will complete monthly inspection of stair towers, means of egress, on all floors of the facility. This information will then be entered on a log and will be presented by the director of maintenance to the monthly QAPI meeting for one year.
K0211 · Abbeyville Skilled Nursing and Rehabilitation Center (PA)
Surveyed 03/17/2026 · Spot-checks: monthly for 4 weeks
1. Education provided to maintenance department regarding requirements for egress signage. Proper signage has been installed. A one time facility wide audit will be performed to confirm all…
View Full Plan Text
K0211 Correction Date: 05/13/2026
1. Education provided to maintenance department regarding requirements for egress signage. Proper signage has been installed. A one time facility wide audit will be performed to confirm all exits have appropriate signage.
2. Proper signage audits will be included with routine door audits monthly x 3 months.
3. Results of audits will be brought to QAPI until substantial compliance is demonstrated.
4. Date of compliance: 5/13/2026
K0211 · Nightingale Nursing and Rehab Center (PA)
Surveyed 02/25/2026 · Spot-checks: weekly for 4 weeks
The directional signage to exit routes for the second and third floor all-purpose rooms has been corrected. No further action is required. To ensure ongoing compliance, a weekly audit to…
View Full Plan Text
K0211 Correction Date: 03/23/2026
The directional signage to exit routes for the second and third floor all-purpose rooms has been corrected. No further action is required. To ensure ongoing compliance, a weekly audit to identify that all directional signage for emergency exits is present will be conducted. This audit will be the responsibility of the Maintenance Supervisor and/or designee. This audit will occur weekly x 4 weeks, then every other week for a month, then monthly until practice is determined to be in compliance. Corrective action will be taken immediately on identification. Audits will be reviewed no less than quarterly by Quality Assurance Performance Improvement committee.
K0211 · Cathedral Village (PA)
Surveyed 02/24/2026 · Spot-checks: weekly for 4 weeks
Appropriate "Not an Exit" signs have been installed at Third Floor South Wing next to Stair Tower Door. Maintenance Staff have been educated on appropriate signage needed at stairtower doors.…
View Full Plan Text
K0211 Correction Date: 03/18/2026
Appropriate "Not an Exit" signs have been installed at Third Floor South Wing next to Stair Tower Door. Maintenance Staff have been educated on appropriate signage needed at stairtower doors. Environmental Service Director or designee will conduct weekly audits x 3 months of stairtower doors to ensure signage remains in place then monthly x 3 months. audits will be forwarded to the Safety Committee for further guidance if indicated.
K0211 · Edenbrook South (PA)
Surveyed 02/18/2026 · Spot-checks: weekly for 4 weeks
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies. To remain in compliance with all federal and state…
View Full Plan Text
K0211 Correction Date: 04/07/2026
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies. To remain in compliance with all federal and state regulations, the facility has taken or will take actions set forth in the following plan of correction.
1. The accumulation of storage items, located within the basement-level exit access corridor system, closest to exit discharge will be removed to maintain a means of egress. A review will be completed of facility exit locations to validate that a proper means of egress is present. The Maintenance Department will be educated related to the need to maintain a means of egress continuously free of all obstructions for all exit locations.
2. Audits will be conducted by the Maintenance Director/designee to validate that exit locations maintain a means of egress. Audits will be conducted weekly for four weeks and then monthly for two months. Audit results will be submitted to the facility QAPI (Quality Assurance Performance Improvement) Committee for review. Date of compliance: April 7, 2026.
K0211 · Norriton Square Nursing and Rehabilitation Center (PA)
Surveyed 01/30/2026 · Spot-checks: weekly for 4 weeks
NHA and maintenance director added a "not an exit" sign near the therapy gym on the 1st floor, and removed snow from outside of the exit stairwell near the gym. Random weekly audits x 12 weeks…
View Full Plan Text
K0211 Correction Date: 03/08/2026
NHA and maintenance director added a "not an exit" sign near the therapy gym on the 1st floor, and removed snow from outside of the exit stairwell near the gym. Random weekly audits x 12 weeks of egress doors will be completed by the NHA or designee to ensure there is no snow. The results will be reviewed monthly at the QAPI meeting x3 to ensure compliance.
K0211 · Fox Subacute at Mechanicsburg (PA)
Surveyed 01/12/2026 · Spot-checks: weekly for 4 weeks
1. Laptop that was on top of the med cart unattended was removed and placed behind the nurses station while charging. 2. Nursing In-service to notify them that laptops cannot be unattended on…
View Full Plan Text
K0211 Correction Date: 02/28/2026
1. Laptop that was on top of the med cart unattended was removed and placed behind the nurses station while charging.
2. Nursing In-service to notify them that laptops cannot be unattended on top of the med carts while charging, to be completed by February 6, 2026.
3. Director of Nursing or her designee will conduct random audits to monitor for compliance. This will be done 3x week for 4 weeks, then quarterly
4. Director of Nursing will report findings to Quality Assurance Committee
K0211 · The Williamsport Home (PA)
Surveyed 01/05/2026 · Spot-checks: weekly for 4 weeks
1) The keypad was replaced. Two extra keypads were purchased as back up. 2) A full house audit was conducted by Maintenance Designee 3) The maintenance Director and or/ designee will conduct…
View Full Plan Text
K0211 Correction Date: 02/10/2026
1) The keypad was replaced. Two extra keypads were purchased as back up. 2) A full house audit was conducted by Maintenance Designee 3) The maintenance Director and or/ designee will conduct weekly audits X 2 weeks and monthly thereafter for three months to ensure compliance. 4) The results of the audits will be reviewed at the Quality Assurance meeting.
K0211 · Graduate Post Acute (PA)
Surveyed 11/24/2025 · Spot-checks: monthly for 3 weeks
Maintenance repaired step thread damage as well as split stair toes All steps will be audited to ensure no step thread damage or split stair toes visible NHA/Designee will inservice…
View Full Plan Text
K0211 Correction Date: 01/15/2026
Maintenance repaired step thread damage as well as split stair toes All steps will be audited to ensure no step thread damage or split stair toes visible NHA/Designee will inservice maintenance director on ensuring steps are in good working order. NHA/Designee will audit steps throughout the center 3 times a week for 3 weeks and 2 times monthly for 2 months. Audits will be reviewed by the QAPI committee during Quality Assurance meetings, and any variances will be addressed.
K0211 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
Preparation and/or execution of this plan of correction does not constitute admission or agreement by this provider of the facts alleged, or conclusion set forth in the statement of…
View Full Plan Text
K0211 Correction Date: 12/29/2025
Preparation and/or execution of this plan of correction does not constitute admission or agreement by this provider of the facts alleged, or conclusion set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of federal and/or state law. The plan of correction constitutes our credible allegation of compliance. 1.The maintenance team adjusted the C-side exit door near resident room. The door opens without the use of excessive force.
2. On 10/2/2025 the maintenance team inspected all emergency exit doors to verify that there were no obstructions to egress.
3. On 10/2/2025 the NHA educated the maintenance team on maintaining that the means of egress are free of obstructions.
4. The Maintenance Director/designee will conduct weekly audits for 4 weeks to verify the proper functionality of all emergency exit doors in accordance with NFPA 101 requirements. Results of the audits will be reviewed at the QAPI meeting held monthly.
K0211 · Kingston Court Skilled Nursing and Rehabilitation Center (PA)
Surveyed 09/23/2025 · Spot-checks: weekly for 4 weeks
1. Cannot be corrected retroactively. Freezer door emergency release was cleared of ice immediately post survey and is functioning as expected. 2. All staff have the potential to be affected.…
View Full Plan Text
K0211 Correction Date: 10/21/2025
1. Cannot be corrected retroactively. Freezer door emergency release was cleared of ice immediately post survey and is functioning as expected.
2. All staff have the potential to be affected.
3. Education provided by NHA to Maintenance department and dietary department on the requirements of K211 as it relates to this issue.
4. Audits will be completed by Maintenance director or designee Weekly x 4 weeks and then monthly x 2 months to ensure freezer door emergency release is properly functioning and maintained.
5. Date of compliance 10/21/2025.
K0211 · Hamilton Arms Center (PA)
Surveyed 09/10/2025 · Spot-checks: weekly for 2 months
1. The doors to the clean linen room on both the 1st and 2nd floors will maintain an interior door clear width to be a minimum of 32 inches at all times. The clean linen room on first floor is…
View Full Plan Text
K0211 Correction Date: 11/03/2025
1. The doors to the clean linen room on both the 1st and 2nd floors will maintain an interior door clear width to be a minimum of 32 inches at all times. The clean linen room on first floor is 36" inches wide. The clean linen room on 2nd floor is 35 and a half inches wide. 2.Doors will be audited weekly for 2 months. Audits will be conducted by the maintenance director or designee.
3. Education will be provided to the maintenance department as to the width requirement of the doors and the QAPI committee.
4. Results of the fix will be reviewed and reported to the QAPI committee.
5. Date certain is 11-3-25
K0211 · Holy Family Manor (PA)
Surveyed 07/28/2025 · Spot-checks: weekly for 4 weeks
Staff member removed miscellaneous items obstructing the exit doors in the lobby. Receptionists and maintenance will monitor lobby area for items blocking means of egress. Maintenance Director…
View Full Plan Text
K0211 Correction Date: 08/14/2025
Staff member removed miscellaneous items obstructing the exit doors in the lobby. Receptionists and maintenance will monitor lobby area for items blocking means of egress. Maintenance Director will conduct random spot checks for the next three months and report out on the findings during the QAPI meetings.
K0211 · Embassy of Scranton (PA)
Surveyed 07/16/2025 · Spot-checks: weekly for 4 weeks
The wheelchairs/scale on the second floor and third-floor exit access corridor have been removed. The Maintenance Director will do an initial audit of exit corridors to ensure that egress is…
View Full Plan Text
K0211 Correction Date: 08/26/2025
The wheelchairs/scale on the second floor and third-floor exit access corridor have been removed. The Maintenance Director will do an initial audit of exit corridors to ensure that egress is currently being maintained. The Maintenance Director/ designee shall audit exit corridors weekly to ensure that the means of egress are maintained. The Maintenance Director/designee will report the weekly audits to the monthly Quality Assurance/Performance Improvement committee monthly for further review and guidance.
K0211 · Marywood Heights (PA)
Surveyed 05/19/2025 · Spot-checks: monthly for 4 weeks
Items being stored on both sides of the corridor on the Basement Level were removed. Director of Maintenance or designee will conduct audits monthly times 2 months to ensure that items are…
View Full Plan Text
K0211 Correction Date: 06/01/2025
Items being stored on both sides of the corridor on the Basement Level were removed. Director of Maintenance or designee will conduct audits monthly times 2 months to ensure that items are being stored correctly.
K0211 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 04/29/2025 · Spot-checks: monthly for 4 weeks
The Maintenance Director has fixed the exit discharge door, to the ground floor Trash Room, to open within the required force of 30 pounds. The Nursing Home Administrator will educate the…
View Full Plan Text
K0211 Correction Date: 05/28/2025
The Maintenance Director has fixed the exit discharge door, to the ground floor Trash Room, to open within the required force of 30 pounds. The Nursing Home Administrator will educate the Maintenance team that exit discharge door must be able to open easily. The Nursing Home Administrator/Designee will conduct random monthly audits to ensure exit discharge doors can be open to ensure compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0211 · Rose City Nursing and Rehab at Lancaster (PA)
Surveyed 04/08/2025 · Spot-checks: weekly for 4 weeks
1. a. The plastic chair was removed from within the swing of the exterior exit door on the front porch on 04/08/2025 at time of observation. b. The padlock on the walk-in refrigerator in the…
View Full Plan Text
K0211 Correction Date: 04/29/2025
1. a. The plastic chair was removed from within the swing of the exterior exit door on the front porch on 04/08/2025 at time of observation. b. The padlock on the walk-in refrigerator in the kitchen was removed on 04-09-2025.
2. Maintenance Director, or designee, will document and audit (a) there are no obstacles for exterior exit "swing area" and (b) there are no padlocks on walk-in refrigerator weekly for two weeks, then monthly for two months. Results of audits will be submitted to monthly QAPI for review and recommendations. a. A building wide audit of the exterior exit doors area was completed. Random audits will be done weekly to ensure there is no blockage of exterior exit doors "swing area."
K0211 · Embassy of Hearthside (PA)
Surveyed 03/26/2025 · Spot-checks: daily for 4 weeks
New lock/handle ordered for both bathroom doors. -Whole house audit done. New lock/handle ordered for all bathroom with like concern. -Education done with all staff on egress guidelines.…
View Full Plan Text
K0211 Correction Date: 04/24/2025
-New lock/handle ordered for both bathroom doors. -Whole house audit done. New lock/handle ordered for all bathroom with like concern. -Education done with all staff on egress guidelines. -Daily observations to be done by leadership team during rounding to ensure all egresses are free and clear.