SA SurveyAnchor

Past Winning Plans

Real state-approved Plans of Correction and their spot-check schedules.

Browse State Guides →
Clear
K0161 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The horizontal fire door located on the 2nd floor East Hall above the drop ceiling by the Unit 3 Nursing Station is not used by facility staff or vendors, nor does it lead to an area that…

View Full Plan Text
K0161 Correction Date: 09/30/2026 1. The horizontal fire door located on the 2nd floor East Hall above the drop ceiling by the Unit 3 Nursing Station is not used by facility staff or vendors, nor does it lead to an area that has any building systems that may require maintenance or service. Therefore, it will be sealed off with 1hr fire rated sheetrock and then sealed with fire rated caulk to close it off. 2. All horizontal fire doors will be inspected to ensure they are not accessible and properly covered and sealed with 1hr fire rated sheetrock, and fire rated caulk. 3. Director of Environmental Services, or designee will audit horizontal fire doors quarterly for 3 quarters to ensure compliance. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0161 · Majestic Care of McCordsville (IN)
Surveyed 08/11/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

Corrective Action for the Finding: The facility reviewed the deficiency for Building Construction Type and Height. The two-story portion of the facility is in question and found to be…

View Full Plan Text
K0161 Completion Date: 09/30/2026 K161 Corrective Action for the Finding: The facility reviewed the deficiency for Building Construction Type and Height. The two-story portion of the facility is in question and found to be non-compliant. An FSES evaluation will be completed. Identification of Other Residents/Areas Potentially Affected: All residents, staff, and visitors have the potential to be affected by the structural building, but none were identified. Systemic Correction: An FSES evaluation was conducted on 9/04/2026. An FSES will be conducted yearly to stay in compliance with Life Safety Code. Monitoring: The QAPI committee will standards and quality of care needs for the facility and the residents.
K0161 · Graduate Post Acute (PA)
Surveyed 08/11/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The expanding foam around the ceiling penetrations above the ground-floor lobby was removed. 2. The Maintenance Director/designee inspected all construction and renovation areas for…

View Full Plan Text
K0161 Correction Date: 09/23/2026 1. The expanding foam around the ceiling penetrations above the ground-floor lobby was removed. 2. The Maintenance Director/designee inspected all construction and renovation areas for unapproved foam and improperly sealed penetrations. Identified concerns were corrected. 3. Maintenance staff and contractors were educated on approved penetration-sealing materials and the prohibition against using unapproved expanding foam. 4. The Maintenance Director/designee will audit active construction areas weekly x 4 and monthly for two months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
K0161 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/01/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The facility would like to have an FSES completed. 2. Upon completion, the results of the FSES survey will be reviewed at QAPI. 3. Date of compliance:8/21/2026

View Full Plan Text
K0161 Correction Date: 08/21/2026 1. The facility would like to have an FSES completed. 2. Upon completion, the results of the FSES survey will be reviewed at QAPI. 3. Date of compliance:8/21/2026
K0161 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
✓ Passed Re-Inspection Use K0161 →

1. a) The ceiling tile was replaced with a new ceiling tile within Dietary. Facility staff will monitor the ceiling assemblies throughout the facility to ensure smoke integrity on a monthly…

View Full Plan Text
K0161 Correction Date: 06/09/2026 1. a) The ceiling tile was replaced with a new ceiling tile within Dietary. Facility staff will monitor the ceiling assemblies throughout the facility to ensure smoke integrity on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0161 · Lecom at Elmwood Gardens, LLC (PA)
Surveyed 02/17/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

The facility will submit a Time Limited Waiver to the Division of Safety Inspection to update and continue the FSES.

View Full Plan Text
K0161 Correction Date: 03/27/2026 The facility will submit a Time Limited Waiver to the Division of Safety Inspection to update and continue the FSES.
K0161 · Embassy of East Mountain (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

On 1/21/2026 the Maintenance Director sealed the two (2) penetrations in the Administrators office with red smoke seal caulking. The two (2) conduits in the Telephone room were also sealed…

View Full Plan Text
K0161 Correction Date: 02/09/2026 On 1/21/2026 the Maintenance Director sealed the two (2) penetrations in the Administrators office with red smoke seal caulking. The two (2) conduits in the Telephone room were also sealed with red smoke seal caulking. Education was provided to the maintenance director on the requirement / importance of sealing all penetrations thru the smoke / fire line. An inspection of similar areas throughout the facility yielded no other penetrations. Inspection for penetrations will occur annually and results will be documented and reviewed at the facilities next QAPI meeting.
K0161 · Allied Services Transitional Rehabilitation Unit (PA)
Surveyed 12/30/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

The facility submitted an FSES in accordance with the 2012 Life Safety Code to PA DOH on May 31, 2017. Approval was received on the FSES from the Center for Medicare and Medicaid Services…

View Full Plan Text
K0161 Correction Date: 01/11/2026 The facility submitted an FSES in accordance with the 2012 Life Safety Code to PA DOH on May 31, 2017. Approval was received on the FSES from the Center for Medicare and Medicaid Services (CMS) on August 4, 2017 to ensure ongoing compliance with deficiency K 0161. BDA Healthcare Architects updated the FSES of the building in accordance with 2012 Life Safety Code dated March 27, 2025. The new FSES is on file with the Williamsport Field Office Division of Safety Inspection.
K0161 · Easton Skilled Nursing and Rehabilitation Center (PA)
Surveyed 12/30/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

The facility is requesting the division of Safety Inspection to issue a TLW for completion. The facility is requesting the division of Safety Inspection to conduct an inspection for FSES.

View Full Plan Text
K0161 Correction Date: 01/14/2026 The facility is requesting the division of Safety Inspection to issue a TLW for completion. The facility is requesting the division of Safety Inspection to conduct an inspection for FSES.
K0161 · Rose View Rehab and Care Center (PA)
Surveyed 12/10/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the…

View Full Plan Text
K0161 Correction Date: 01/20/2026 Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of Federal and State Law. The plan of correction represents the facility's credible allegation of compliance. 1. A vendor will be approved to install proper rated ceiling assembly on both first floor porch and rear exits soffit areas. 2. Other exterior areas will be checked for proper rated ceiling assembly. 3. Maintenance will be re-educated on ensuring that all exterior soffits are fire rated ceiling assemblies. 4. Maintenance Director/ designee will conduct random audits to verify that exterior soffits are properly rated weekly for 4 weeks and then monthly for 2 months thereafter. Audit results will be presented at QAPI meeting for review and recommendations.
K0161 · Haven Convalescent Home Inc (PA)
Surveyed 11/25/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

Maintenance sealed the roof by the exit door on west wing / long hall. Maintenance replaced the ceiling tiles. Maintenance will monitor the ceiling tiles above the exit door on west wing /…

View Full Plan Text
K0161 Correction Date: 12/19/2025 Maintenance sealed the roof by the exit door on west wing / long hall. Maintenance replaced the ceiling tiles. Maintenance will monitor the ceiling tiles above the exit door on west wing / long that they are no leaks weekly x 1 month. Staff to notify Administration and Maintenance if they notice any leaks or wet ceiling tiles in the building. Repairs will be made accordingly.
K0161 · Ivory Nursing & Rehabilitation (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

Towne Manor East would like the Department of Health and Human Services Life Safety Divisions assistance with reapplying for another FSES for three-story type II (000), unprotected…

View Full Plan Text
K0161 Correction Date: 12/30/2025 Towne Manor East would like the Department of Health and Human Services Life Safety Divisions assistance with reapplying for another FSES for three-story type II (000), unprotected noncombustible construction, that is fully sprinklered. The story height exceeds the maximum allowance by two stories. The facility has submitted a TLW with the DOH on 12/29/2025 as part of this POC. The Administrator or designee is responsible for monitoring this annually to ensure that the waiver is place and up to date. All residents may be affected by this deficient practice.
K0161 · The Pavilion at Saint Luke Village (PA)
Surveyed 09/22/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The facility has requested a Fire Safety Evaluation System (FSES) inspection for this citation. The facility will submit a request of temporary waiver for the completion of the FSES to the…

View Full Plan Text
K0161 Correction Date: 10/14/2025 1. The facility has requested a Fire Safety Evaluation System (FSES) inspection for this citation. The facility will submit a request of temporary waiver for the completion of the FSES to the Department. 2. There is only one requirement for the maximum allowable story height for this type of construction, therefore no additional reviews were needed. 3. The Executive Director/ designee will educate the Maintenance Director on the importance of NFPA 101 Building Construction Type and Height specific to the maximum allowable story height for this type of construction, and will continue to monitor in accordance with NFPA standards. 4. Any findings will be reported to the monthly QAPI Committee for further review.
K0161 · Sanatoga Center (PA)
Surveyed 07/30/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

Maintenance director replaced missing rated ceiling tiles in the first floor mechanical room on 8/18/2025 The Maintenance Director will conduct a facility wide audit for any missing rated…

View Full Plan Text
K0161 Correction Date: 09/18/2025 Maintenance director replaced missing rated ceiling tiles in the first floor mechanical room on 8/18/2025 The Maintenance Director will conduct a facility wide audit for any missing rated ceiling tiles and replace tiles as indicated. Maintenance director to be reeducated on policy K0161 by the NHA or Designee. Compliance will be monitored by the Maintenance Director/Designee through 5 Random audits weekly X 4 for any ceiling tiles that need replaced. Audit results to be reviewed at the QA Committee to determine the need for further follow up/monitoring.
K0161 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 05/20/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. a) The first floor B wing Nurse's Station area ceiling access panel was incapsulated with a layer of 5/8" drywall to ensure smoke integrity. Facilities staff will monitor the access panels…

View Full Plan Text
K0161 Correction Date: 06/19/2025 1. a) The first floor B wing Nurse's Station area ceiling access panel was incapsulated with a layer of 5/8" drywall to ensure smoke integrity. Facilities staff will monitor the access panels to ensure they maintain rated integrity on a monthly basis during facility rounds for the next three months. Non-compliance will be reported at the Quality Assurance Committee. b) The bonnet protection around the ceiling light within the first-floor portion on the center stair tower was adjusted. Facilities staff will monitor the bonnet protection assemblies to ensure they maintain rated integrity on a monthly basis during facility rounds for the next three months. Non-compliance will be reported at the Quality Assurance Committee. c) The penetration of the monolithic portion of the rated ceiling assembly located within second floor C222 was sealed with a layer of 5/8" drywall to ensure smoke integrity. Facilities staff will monitor the monolithic rated ceiling assembly to ensure they maintain rated integrity on a monthly basis during facility rounds for the next three months. Non-compliance will be reported at the Quality Assurance Committee.
K0161 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/01/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The facility would like to have a FSES completed. 2. Upon completion, the results of the FSES survey will be reviewed at QAPI. 3. Date of compliance: June 10, 2025.

View Full Plan Text
K0161 Correction Date: 06/10/2025 1. The facility would like to have a FSES completed. 2. Upon completion, the results of the FSES survey will be reviewed at QAPI. 3. Date of compliance: June 10, 2025.
K0161 · Twinbrook Healthcare and Rehabilitation Center (PA)
Surveyed 04/17/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. Maintenance Director or designee will replace the tiles that have fallen or are damaged. 2. Maintenance Director or designee will audit tiles to ensure they are correct and in place weekly…

View Full Plan Text
K0161 Correction Date: 05/09/2025 1. Maintenance Director or designee will replace the tiles that have fallen or are damaged. 2. Maintenance Director or designee will audit tiles to ensure they are correct and in place weekly x4 weeks then monthly x3 months. 3. Results of the audits will be reported to QAPI committee for review and further recommendation.
K0161 · Edenbrook North (PA)
Surveyed 04/14/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

Unsealed penetrations were sealed in front of rooms 317, 202, 207 & 214. Maintenance staff will complete a facility walk-thru to identify any other areas with unsealed penetrations.…

View Full Plan Text
K0161 Correction Date: 05/28/2025 Unsealed penetrations were sealed in front of rooms 317, 202, 207 & 214. Maintenance staff will complete a facility walk-thru to identify any other areas with unsealed penetrations. Maintenance staff will receive education regarding identifying unsealed penetrations. A monthly audit will be added to facility TELS system to assist with regular monitoring.
K0161 · Pleasant Acres Rehabilitation and Nursing Center (PA)
Surveyed 03/06/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The four inch structural steel above resident resident room was covered with Universal Fireproofing Patch that provides a minimum 2-hour fire resistance coating. 2. The maintenance…

View Full Plan Text
K0161 Correction Date: 03/18/2025 1. The four inch structural steel above resident resident room was covered with Universal Fireproofing Patch that provides a minimum 2-hour fire resistance coating. 2. The maintenance department will be in-serviced by NHA/Designee on the importance of having the structural steel of the facility being coated with a minimum of a 2-hour fire resistant material. 3. Quarterly audits will be performed by the maintenance director/ designee in random locations to ensure there is a minimum 2-hour fire resistant protectant on the structural steel of the facility. 4. Results of the audit will be reviewed/reported to the QA committee to determine trends and compliance. QA committee will determine need for continuance of audits.
K0161 · Allied Services Transitional Rehabilitation Unit (PA)
Surveyed 02/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

The facility submitted an FSES in accordance with the 2012 Life Safety Code to PA DOH on May 31, 2017. Approval was received on the FSES from the Center for Medicare and Medicaid Services…

View Full Plan Text
K0161 Correction Date: 04/30/2025 The facility submitted an FSES in accordance with the 2012 Life Safety Code to PA DOH on May 31, 2017. Approval was received on the FSES from the Center for Medicare and Medicaid Services (CMS) on August 4, 2017 to ensure ongoing compliance with deficiency K 0161. BDA Healthcare Architects will conduct an updated FSES of the building in accordance with 2012 Life Safety Code. The new FSES will be submitted to the Supervisor Williamsport Field Office Division of Safety Inspection.
K0161 · Chambers Pointe Health Care Center (PA)
Surveyed 02/11/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

1. The attic horizontal fire-rated access door will have springs properly installed to make the door self-close and latch in the frame. 2. The access door will be added to quarterly inspection…

View Full Plan Text
K0161 Correction Date: 03/17/2025 1. The attic horizontal fire-rated access door will have springs properly installed to make the door self-close and latch in the frame. 2. The access door will be added to quarterly inspection PMs and the annual fire door inspection PM to check for proper operation and documentation. Any issues will be reported to the Manager of Safety/Security for proper repairs to be made. Any issues will also be reported to the Nursing Home Administrator to assure proper follow-up.
K0161 · Lecom at Elmwood Gardens, LLC (PA)
Surveyed 02/06/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

The facility will submit a Time Limited Waiver to the Division of Safety Inspection

View Full Plan Text
K0161 Correction Date: 03/14/2025 The facility will submit a Time Limited Waiver to the Division of Safety Inspection
K0161 · Edison Manor Nursing & Rehab Center (PA)
Surveyed 01/15/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0161 →

No adverse effects occurred from the facility exceeding the height requirement for this construction type. Life Safety Consultant Peters Rice Associates conducted an FSES on 3/20/2017, which…

View Full Plan Text
K0161 Correction Date: 02/19/2025 No adverse effects occurred from the facility exceeding the height requirement for this construction type. Life Safety Consultant Peters Rice Associates conducted an FSES on 3/20/2017, which is on file with the Department of Health. Edison Manor has been working with various vendors on a construction proposal that will minimize disturbance to the residents of the facility. Once a viable proposal has been acquired the facility will submit architectural plans and determine the time frame to have the work completed to stay in compliance. 2. TLW was submitted to local department of health field office to be sent for approval. 3. FSES is being requested to be updated.
K0161 · Care Pavilion Nursing and Rehabilitation Center (PA)
Surveyed 09/28/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use K0161 →

0161- Missing rated Ceiling tiles in Basement 1 storage Action taken: Ceiling tiles were replaced on September 28th 2026. POC: The Maintenance Department will Audit/monitor Kitchen storage…

View Full Plan Text
K0161 Correction Date: 10/24/2026 0161- Missing rated Ceiling tiles in Basement 1 storage Action taken: Ceiling tiles were replaced on September 28th 2026. POC: The Maintenance Department will Audit/monitor Kitchen storage room ceiling tiles for placement compliance weekly x 4 weeks monthly x 2months, then periodically. Any findings will be reviewed and discussed in QAPI
K0161 · Allied Services Transitional Rehabilitation Unit (PA)
Surveyed 09/28/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use K0161 →

The facility submitted an FSES in accordance with the 2012 Life Safety Code to PA DOH on May 31, 2017. Approval was received on the FSES from the Center for Medicare and Medicaid Services…

View Full Plan Text
K0161 Correction Date: 12/01/2026 The facility submitted an FSES in accordance with the 2012 Life Safety Code to PA DOH on May 31, 2017. Approval was received on the FSES from the Center for Medicare and Medicaid Services (CMS) on August 4, 2017 to ensure ongoing compliance with deficiency K 0161. BDA Healthcare Architects will conduct an updated FSES of the building in accordance with 2012 Life Safety Code. The new FSES will be submitted to the Supervisor Williamsport Field Office Division of Safety Inspection.