SA SurveyAnchor

Past Winning Plans

Real state-approved Plans of Correction and their spot-check schedules.

Browse State Guides →
Clear
K0133 · Sunnyview Nursing and Rehabilitation Center (PA)
Surveyed 07/23/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

Ensure positive latching to the frame will occur on all 2 hour separation barriers. Weekly audits will occur to ensure positive door latching to frame

View Full Plan Text
K0133 Correction Date: 09/08/2026 Ensure positive latching to the frame will occur on all 2 hour separation barriers. Weekly audits will occur to ensure positive door latching to frame
K0133 · York South Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/30/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

Faulty hardware has been replaced to ensure the right leaf will latch into frame. #1 The Maintenance Director will conduct and document an initial facility wide audit, then proceed with…

View Full Plan Text
K0133 Correction Date: 08/26/2026 Faulty hardware has been replaced to ensure the right leaf will latch into frame. #1 The Maintenance Director will conduct and document an initial facility wide audit, then proceed with monthly door/fire door inspections using the facility's standardized checklist to ensure appropriate latching. The Administrator will review all completed inspection checklists on a monthly basis to verify compliance and ensure that any identified issues are addressed promptly. Findings and corrective actions will be tracked and trended to identify any patterns or recurring concerns. #2 Monthly fire door inspection reports will be submitted to the QAPI Committee for review at each quarterly meeting. The QAPI Committee will review trends, evaluate the effectiveness of corrective actions, and make recommendations for further improvement as needed.
K0133 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

The open penetration surrounding the data line above the first-floor front lobby fire doors was sealed with fire-rated material. - The Maintenance Director was re-educated on maintaining fire…

View Full Plan Text
K0133 Correction Date: 07/20/2026 - The open penetration surrounding the data line above the first-floor front lobby fire doors was sealed with fire-rated material. - The Maintenance Director was re-educated on maintaining fire barriers and properly sealing data line penetrations. - The Director of Maintenance or designee will audit fire barriers weekly x 4. Monthly audits times 3 will continue with results reported to the QA Committee.
K0133 · Linwood Nursing and Rehabilitation Center (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 3 months
✓ Passed Re-Inspection Use K0133 →

The unsealed penetration on the 1st floor common wall was sealed using NFPA approved materials. There were no other penetrations in the common wall. The Director of Maintenance/designee will…

View Full Plan Text
K0133 Correction Date: 04/21/2026 The unsealed penetration on the 1st floor common wall was sealed using NFPA approved materials. There were no other penetrations in the common wall. The Director of Maintenance/designee will audit the 1st floor common wall 1x/month for 3 months to ensure a tight fire seal exists. The results of the audit will be presented to the QA committee for review and recommendations.
K0133 · Fairview Rehab and Care Center (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

Open penetration to be sealed with fire caulk3M Fire Barrier Sealant CP 25WB+ and 3m fire composite sheets cs-195+ Around electric and data lines by back elevator Area Near the villa On the…

View Full Plan Text
K0133 Correction Date: 03/03/2026 K0133 Open penetration to be sealed with fire caulk3M Fire Barrier Sealant CP 25WB+ and 3m fire composite sheets cs-195+ Around electric and data lines by back elevator Area Near the villa On the first floor. Maintenance director educated by Regional Maintenance Director on making sure vendors are aware of using the fire caulk for all future visits. Facility will be monitored for any other cause or places of penetrations. Maintenance director will present any other findings at Qapi.
K0133 · West Chester Rehabilitation and Healthcare Center (PA)
Surveyed 10/28/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

This Plan of Correction constitutes this facility's written allegation of compliance for the deficiencies cited. This submission of this plan of correction is not an admission of or agreement…

View Full Plan Text
K0133 Correction Date: 12/17/2025 This Plan of Correction constitutes this facility's written allegation of compliance for the deficiencies cited. This submission of this plan of correction is not an admission of or agreement with the deficiencies or conclusions contained in the Department's inspection report. 1. The facility is requesting a time limited waiver for dialysis doors to be adjusted/replaced per contractor recommendation to properly close and latch when released. 2. Maintenance staff were educated on fire door codes and requirements. 3. Maintenance Director or Designee will conduct an audit of 5 random fire doors weekly for 4 weeks followed by monthly for 2 months to ensure they close and latch when released. Audit results will be submitted to Quality Assurance Performance Improvement Committee for additional review and recommendations as need. Further audit frequency will be determined based on audit findings
K0133 · King of Prussia Skilled Nursing and Rehabilitation Center (PA)
Surveyed 07/28/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

***UP Date***The Maintenance Director will Seal the holes with Approved 3M, 4 hour fire caulk, The safety Data Sheet will be kept on file for future reference. and ensure that they meet fire…

View Full Plan Text
K0133 Correction Date: 08/28/2025 ***UP Date***The Maintenance Director will Seal the holes with Approved 3M, 4 hour fire caulk, The safety Data Sheet will be kept on file for future reference. and ensure that they meet fire safety Standards. The NHA or designee will educate the Maintenance Director to ensure he complies with the Life Safety Code. Facility audits will be completed to ensure the three unsealed penetrations and holes in common fire wall above double doors between PT and corridor are in compliance and sealed. The Maintenance Director or designee will conduct the Audits Weekly x 4 and Monthly x 2 until compliance is reached. The findings of the audits will be shared with QAPI Committee:Date of compliance: 8/28/25
K0133 · Twinbrook Healthcare and Rehabilitation Center (PA)
Surveyed 04/17/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

1. Maintenance Director or designee will adjust the door so they close properly. 2. Maintenance Director or designee will audit Fire Doors to ensure they are in working order weekly x4 weeks…

View Full Plan Text
K0133 Correction Date: 05/09/2025 1. Maintenance Director or designee will adjust the door so they close properly. 2. Maintenance Director or designee will audit Fire Doors to ensure they are in working order weekly x4 weeks then monthly x3 months. 3. Results of the audits will be reported to QAPI committee for review and further recommendation.
K0133 · Fox Subacute at Mechanicsburg (PA)
Surveyed 01/23/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0133 →

1. The distance between the common wall doors by the East lounge have been adjusted and corrected to meet one-eighth-inch requirement. 2. Door was adjusted to ensure manual positive latching.…

View Full Plan Text
K0133 Correction Date: 03/20/2025 1. The distance between the common wall doors by the East lounge have been adjusted and corrected to meet one-eighth-inch requirement. 2. Door was adjusted to ensure manual positive latching. 3. Facility Maintenance Director or his designee will audit random doors for gaps for the next 3 months and then quarterly 4. Maintenance Director will report findings to the QAPI committee
K0133 · Independence Rehab and Nursing (PA)
Surveyed 09/16/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use K0133 →

The Maintenance Director will repair as necessary the double doors in the lobby between the east and south additions to ensure they function appropriately including closing and latching. The…

View Full Plan Text
K0133 Correction Date: 10/13/2026 The Maintenance Director will repair as necessary the double doors in the lobby between the east and south additions to ensure they function appropriately including closing and latching. The Maintenance Director will inspect weekly for four weeks the double doors to ensure they function and latch appropriately per code. The QAPI Committee will monitor the facility's ongoing compliance with door maintenance and inspection procedures to ensure that corrective actions remain effective and are consistently maintained.
K0133 · Kadima Rehabilitation & Nursing at New Castle (PA)
Surveyed 05/12/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use K0133 →

Corrective Action The water container was removed immediately upon identification, and the two-hour fire-rated door was tested to ensure it closed and latched properly without impediment. The…

View Full Plan Text
K0133 Correction Date: 07/07/2026 Corrective Action The water container was removed immediately upon identification, and the two-hour fire-rated door was tested to ensure it closed and latched properly without impediment. The door was found to be functioning as designed. Identification of Other Areas The Maintenance Director conducted an inspection of all fire-rated doors throughout the facility to identify any additional doors that were propped open, obstructed, or otherwise prevented from functioning properly. Any identified issues were corrected immediately. Measures to Prevent Recurrence The facility has re-educated maintenance staff, department managers, and other applicable personnel regarding the requirement that fire-rated doors remain unobstructed and may not be propped open unless equipped with an approved automatic releasing device connected to the fire alarm system. The facility's Life Safety and Environmental Rounds policy has been revised to include routine observation of fire-rated doors to verify that doors remain unobstructed and capable of closing and latching properly. Signage reminding staff not to prop open fire-rated doors will be installed in appropriate locations as needed. Monitoring The Maintenance Director or designee will conduct weekly inspections of fire-rated doors for three months and monthly inspections thereafter for an additional nine months to verify compliance. Any identified deficiencies will be corrected immediately. Inspection results will be documented and reported to the facility's Quality Assurance and Performance Improvement (QAPI) Committee quarterly for review and follow-up as necessary