SA SurveyAnchor

Past Winning Plans

Real state-approved Plans of Correction and their spot-check schedules.

2,041 Verified Plans Browse 5,700+ State Guides →
Clear
F0880 · Autumn Care of Shallotte (NC)
Surveyed 10/08/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

Infection control- water management The facility documented risk assessment including flow diagram of the facility's water systems to identify and evaluate areas at risk of Legionella growth…

View Full Plan Text
F0880 Completion Date: 10/30/2026 F880- Infection control- water management The facility documented risk assessment including flow diagram of the facility's water systems to identify and evaluate areas at risk of Legionella growth on 10/21/2026. Annual water testing was conducted in May 2026 with no detection of Legionella growth. Cold water temperatures were documented starting on 10/8/2026. Flushing was completed on 10/09/2026. Weekly flushing started 10/21/2026. The facility documented risk assessment including flow diagram of the facility's water systems to identify and evaluate areas at risk of Legionella growth on 10/21/2026. Annual water testing was conducted in May 2026 with no detection of Legionella growth. Cold water temperatures were documented starting on 10/8/2026. Flushing was completed on 10/09/2026. Weekly flushing started Continued from page 3 10/21/2026. The Saber Legionella Assessment was revised on 10/20/2026 to include recommended stored water temperatures for both hot and cold water temperatures as well as additional steps for temperature excursions. Maintenance Director and Administrator signed off on Legionella Assessment and Prevention Program as education on 10/22/2026. Maintenance director or designee will conduct audit log for ten weeks of weekly flushing and results will be brought to the facility QAPI meeting.
F0880 · Kadima Rehabilitation & Nursing at Washington (PA)
Surveyed 08/27/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

Facility will ensure that infection control prevention and management are implemented and maintained in the facility. The facility cannot retroactively correct deficiency F0880. The facility…

View Full Plan Text
F0880 Correction Date: 09/14/2026 Facility will ensure that infection control prevention and management are implemented and maintained in the facility. The facility cannot retroactively correct deficiency F0880. The facility will complete a house audit to validate residents with active infections have the appropriate precautions in place and are not cohabitated with a resident that could compromise their health and safety. The Director of Nursing or Designee will re-educate the Infection Preventionist on deficiency F0880, detailing room placement with residents with current infection to prevent and manage the spread of infection. The Director of Nursing or Designee will conduct an audit on all individuals with an infectious disease to ensure that proper infection control prevention and protocols are being followed and room placement is appropriate 2 times per week for 4 weeks, then monthly for 3 months. The results of the audit will be forwarded to the monthly QAPI meeting for review and frequency of the audits.
F0880 · Fox Subacute at Mechanicsburg (PA)
Surveyed 08/20/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the…

View Full Plan Text
F0880 Correction Date: 09/30/2026 Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of Federal and State Law. The plan of correction represents the facility's credible allegation of compliance. One, actions taken for situation identified: 1. Employee 1 & 2 were educated on donning proper PPE per type of isolation, proper hand hygiene and policy when entering a resident room and when performing direct care. Two, how the facility will respond regarding residents in similar situations: The facility recognizes that all residents have the potential to be affected. Please see sections three and four for system changes and monitoring mechanisms. Three, system changes and measures that will be taken: 1. All Staff will be In-serviced on proper hand hygiene and proper PPE per isolation status. Four, monitoring mechanism to assure compliance: 1. The Director of Nursing or her designee will conduct random audits 5 times per week for 1 month, then weekly for 1 month, and then monthly thereafter for compliance of proper PPE and Hand Hygiene during resident care for direct care of Residents. 2. The Director of Nursing will report findings at Continuous Quality Improvement Committee meetings. 3. The NHA or his designee will conduct 5 audits per week for 1 month, then weekly for 1 month, then monthly thereafter for compliance of PPE before entering a room. 4. The NHA will report findings at Continuous Quality Improvement Committee Meetings
F0880 · Concordia at Rp Home (PA)
Surveyed 08/14/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

1) Enhanced Barrier precaution sign and supplies were returned to R6's room at the time of discover. 2) All residents who require Enhanced Barrier Precautions will be autied to ensure proper…

View Full Plan Text
F0880 Correction Date: 10/01/2026 1) Enhanced Barrier precaution sign and supplies were returned to R6's room at the time of discover. 2) All residents who require Enhanced Barrier Precautions will be autied to ensure proper communication/supplies are available. Audit to be completed by Infection Preventionist. Audits to NHA. 3) weekly audits to be completed by Infection Preventionist to ensure proper precautions are available/in place. Will audit until 100% compliance 3 months. 4) Quality Assurance Committee will be provided audits results. 5) Water Management program will be updated to include control measure monitoring and logs. Monitoring will include weekly water temperatures at the boiler (to ensure greater than 140 degrees) monitor to ensure water flushes at vacant rooms, monthly. Maintenance Director, Infection Preventionist a Directors will be re-educated to this plan. NHA will provide re-education
F0880 · Sunnyview Nursing and Rehabilitation Center (PA)
Surveyed 07/31/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

R33 had no ill effects from deficient practice. All residents have the potential for this deficient practice to occur. All licensed staff will be re-inserviced by DON and/or designee regarding…

View Full Plan Text
F0880 Correction Date: 09/15/2026 R33 had no ill effects from deficient practice. All residents have the potential for this deficient practice to occur. All licensed staff will be re-inserviced by DON and/or designee regarding medication administration and disposition with emphasis of infection practices and control. Audits will be performed by Unit Manager and/or RN designee to ensure compliance with cross-contamination does not occur during medication pass. Audits will be completed of 2 nurses per unit at 3x week (for a total of 6 nurses per unit) for one month, then weekly thereafter to monitor for compliance and will be presented at the Quality Assurance Committee Meeting. Further frequency of monitoring will be based on results of monitors and recommendations of the Quality Assurance Committee.
F0880 · Majestic Care of North Vernon (IN)
Surveyed 07/16/2026 · Spot-checks: weekly for 3 months
✓ Passed Re-Inspection Use F0880 →

Ensured resident 12 foley catheter was appropriately positioned to ensure no contact with floor. A licensed nurse completed an assessment to include a full set of vitals and no abnormalities…

View Full Plan Text
F0880 Completion Date: 07/31/2026 F880 Plan of Correction 1. What corrective action(s) will be accomplished for those resident's found to have been affected by the deficient practice? ensured resident 12 foley catheter was appropriately positioned to ensure no contact with floor. A licensed nurse completed an assessment to include a full set of vitals and no abnormalities were noted. The nurse practitioner and responsible party were notified with no concerns and no new orders noted. Upon identification all linen transportation concerns identified were immediately corrected. 2. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action(s) will be taken. A facility wide audit of all residents with indwelling urinary catheters was completed to evaluate compliance with catheter positioning requirements. A facility wide audit was conducted to observe linen handling and transportation practices for care team members. Any identified concerns were corrected immediately. 3. What measures will be put in place and what systemic change/s will be made to ensure emphasis on indwelling urinary catheter positioning requirements and proper handling, transportation, and storage of soiled linen. This education was completed by 7/31/2026. 4. How the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place and by what date will the systemic changes for each deficiency will be completed. The Director of Nursing, Assistant Director of Nursing, Executive Director or designee will conduct catheter positioning audits and linen transportation audits 5 times weekly for 3 months, then 3x's weekly for 2 months, and 1x monthly for one month to ensure ongoing compliance with requirements. Any concerns noted will be immediately corrected. Audit results will be reviewed by the QAPI committee until consistent substantial compliance is achieved as determined by the committee. Findings will be tracked and reviewed during QAPI meetings.
F0880 · Wecare at Monroeville Rehabilitation and Nursing Center (PA)
Surveyed 07/06/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

The facility will maintain infection control practices to prevent the potential for cross contamination during wound care and personal hygiene to residents. The facility cannot retroactively…

View Full Plan Text
F0880 Correction Date: 08/04/2026 The facility will maintain infection control practices to prevent the potential for cross contamination during wound care and personal hygiene to residents. The facility cannot retroactively correct the concern identified for residents R1 and R2. Resident R2 wound was evaluated and clean dressing applied using appropriate infection control practices immediately once brought to the facilities attention during survey. A house audit will be completed to identify residents indicated for enhanced barrier precaution (EBP) and contact precautions to validate proper signage and personal protective equipment is available (PPE). The Director of Nursing (DON) or designee will re-educate nursing staff, including new hires and agency on the facility policy and procedures for infection control that prevent the potential for cross-contamination during wound care and personal hygiene. Education will include EBP, PPE and hand hygiene. The DON or designee will complete 3 wound observations and 3 personal hygiene observations weekly for 4 weeks to validate nursing staff is maintaining infection control practices to prevent the potential for cross contamination. The results of these audits will be forwarded to the monthly Quality Assurance and Performance Improvement Committee for review and frequency of audits.
F0880 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/29/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

1. The nurse LPN-1 was immediately educated on the proper procedures for administering medications. The nurse aides NA-1 and NA-2 were immediately educated on EBP. 2. and 3. The DON/designee…

View Full Plan Text
F0880 Correction Date: 06/23/2026 1. The nurse LPN-1 was immediately educated on the proper procedures for administering medications. The nurse aides NA-1 and NA-2 were immediately educated on EBP. 2. and 3. The DON/designee will educate licensed nursing staff on proper medication administration, including hand hygiene and removing medication from the source without touching it with bare hands. The Infection Preventionist will educate all nursing staff on the observance and use of "Enhanced Barrier Precautions." The DON/designee and/or IP nurse will conduct random audits of medication administration and staff adherence to EBP, where indicated. 4. To prevent recurrence, the NHA/DON will complete a medication administration audit and EPB observance and use audit 1X weekly X 4 weeks, 1X bi-weekly X 4 weeks, and 1X monthly X 1 month. 5. Date of compliance is 6/23/2026.
F0880 · The Gardens for Memory Care at Easton (PA)
Surveyed 04/10/2026 · Spot-checks: daily for 4 weeks
✓ Passed Re-Inspection Use F0880 →

1. R24 and R81 had no adverse effects. LPN 2 has resigned. Housekeeping Supervisor 1 was educated on the Laundry and Linen policy. 2. Observations completed of additional laundry staff to…

View Full Plan Text
F0880 Correction Date: 05/12/2026 F0880 1. R24 and R81 had no adverse effects. LPN 2 has resigned. Housekeeping Supervisor 1 was educated on the Laundry and Linen policy. 2. Observations completed of additional laundry staff to ensure proper handling of Laundry and linen 3. Licensed nurses will be educated on the proper administering of oral medication. Housekeeping/Laundry Staff will be educated on the proper handling of soiled linens and attire. 4. DON/designee will audit for proper administration of oral medications daily x5 , weekly x3 and monthly x2 and report to QAPI. NHA/designee will complete audits for proper linen handling daily x5, weekly, x3, monthly x 2 and report to QAPI. 5. Date of compliance is May 12, 2026
F0880 · The Ball Pavilion (PA)
Surveyed 03/27/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

The facility immediately corrected staff observed not following proper infection prevention practices during medication administration. The residents identified in the citation (R15, R52, R63,…

View Full Plan Text
F0880 Correction Date: 05/25/2026 The facility immediately corrected staff observed not following proper infection prevention practices during medication administration. The residents identified in the citation (R15, R52, R63, and R49) were immediately assessed for any adverse effects related to the observed infection control and medication administration practices. No immediate adverse outcomes were identified, and care was continued as ordered with reinforcement of proper infection prevention precautions during subsequent medication administration. All parties involved at the time were educated on proper use of gloves, gowns, and hand hygiene. All nursing staff will receive education during the next nursing meeting on proper use of PPE, including gloves and gowns, and correct handwashing procedures. Education will include proper handling of medications, including tube feeding and IV administration, and staff will document completion on a sign-in sheet. This education will be done by the Director of Nursing and Assistant Director of Nursing. The facility will reinforce current policies to ensure all medication passes are conducted with gloves, and policies will be reviewed and updated as necessary to include proper handwashing techniques and PPE requirements for high-contact care activities, including administration of medications via IV and feeding tubes. The Assistant Director of Nursing (ADON) will conduct weekly random audits of medication administration for residents with tube feeding and IV medications for six weeks to ensure proper use of PPE, hand hygiene, and safe medication handling. This audit will include all residents on a tube feed and staff using PPE at random for any shift. The ADON will also monitor PPE supplies to ensure availability and usage. Results and trends from audits will be reviewed in the Quality Assurance and Performance Improvement meeting to ensure sustained compliance.
F0880 · Hempfield Manor (PA)
Surveyed 03/20/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

1) Employes listed received Infection Control In-service. 2) Staff Development Coordinator and Human Resources Director educated by NHA on required In-Service Educations by April 30, 2026. 3)…

View Full Plan Text
F0880 Correction Date: 05/05/2026 1) Employes listed received Infection Control In-service. 2) Staff Development Coordinator and Human Resources Director educated by NHA on required In-Service Educations by April 30, 2026. 3) All staff educated on the required In-Service Educations by April 30, 2026 4) Audits will be completed monthly according to the training schedule x 6 months. 5) Audits and results will be reviewed during QAPI.
F0880 · Margate Health and Rehabilitation LLC (NC)
Surveyed 02/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

Continued from page 10 The requirement to perform hand hygiene after removal of gloves and before donning clean gloves, regardless of visible soilage Indicate how the facility plans to monitor…

View Full Plan Text
F0880 Completion Date: 2/20/2026 Continued from page 10 The requirement to perform hand hygiene after removal of gloves and before donning clean gloves, regardless of visible soilage Indicate how the facility plans to monitor its performance to make sure solutions are sustained: The Iinterim DON/designee or designee will conduct: weekly wound care observation audits for 4 weeks, bi-weekly audits for the following 2 months, then monthly audits thereafter for an additional 3 months. The Administrator will take audit results to the monthly QAPI Committee meeting. Any identified noncompliance will result in immediate re-education and progressive disciplinary action if indicated. Date of compliance is 2/20/2026
F0880 · St Andrews Health Campus (IN)
Surveyed 01/15/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

Resident 2 and 58 were assessed for adverse effects related to staff not properly donning PPE when entering a room with EBP. Identified employees were educated on EBP policy. 2: How other…

View Full Plan Text
F0880 Completion Date: 02/06/2026 1: What corrective action(s) will be accomplished for those residents found to have affected by the deficient practice? Resident 2 and 58 were assessed for adverse effects related to staff not properly donning PPE when entering a room with EBP. Identified employees were educated on EBP policy. 2: How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action will be taken. All residents in EBP have the potential to be affected. The DHS/Designee provided training to direct care staff on EBP policy. 3: What measures will be put into place or what systemic changes will be made to ensure that the deficient practice does not recur As a measure of ongoing compliance, the Director of Health Services (DHS), or weeks, then every other week x 8 weeks, then monthly x3 months. 4: How the corrective action will be monitored to ensure the deficient practice will not recur i.e., what quality assurance program will be put into place? - The results of these audits will be reviewed by the QA committee overseen by the Executive Director. If a threshold of 100% is not achieved, an action plan will be developed. The facility through the QAPI program, will review, update, and make changes to the DPOC as needed for sustaining substantial compliance for no less than 6 months. 5. Date of completion: 2/6/26
F0880 · Windsor Rehabilitation and Healthcare Center (NC)
Surveyed 01/13/2026 · Spot-checks: weekly for 3 months
✓ Passed Re-Inspection Use F0880 →

Immediate corrective action: Immediate re-education and return demonstration for staff observed noncompliant with donning and doffing isolation procedures process, handling of soiled lined,…

View Full Plan Text
F0880 Completion Date: 02/04/2026 Immediate corrective action: Immediate re-education and return demonstration for staff observed noncompliant with donning and doffing isolation procedures process, handling of soiled lined, and Covid exposure testing processes were completed on 1/4/2026. Director of Nursing provided proof of education for staff observed noncompliant with donning and doffing isolation procedure process, on 01/04/2026. The Director of Nursing and ADON completed the same day all shift rounding on all isolation/EBP rooms to verify supplies/signage and compliance on 01/04/2026. No further issues were identified, and no residents had a covid exposure that would warrant testing on 1/5/2026. Systemic changes: All residents have the potential to be affected by this deficient practice. 100% observation by DON or Designee, proper soiled linen handled, and post- Covid testing workflow will be completed by 2/2/26. DON or designee will observe all residents on EBP/contact precautions to ensure staff are using the appropriate donning/ doffing infection control procedures and processes before or by 2/2/26. No other issues have been identified. If issues are identified during audits, immediate education will be provided. 3. Measurement to prevent recurrence: The Infection Prevention did education to include PPE expectations by precaution type, soiled linen handling, EBP workflow for high-contact care, and post-exposure Continued from page 35 nursing before or by 2/2/26. All new hires will get education in orientation. Completed all PPE/Isolation -education for all nursing, CNA, housekeeping and therapy staff 2/2/26. Al l new hires will receive education in orientation. 4. Monitoring: DON/designee will conduct 5 observations/all shifts weekly x 12 weeks to ensure that soiled linen is handled properly and is worn appropriately for precaution type, and Covid testing any resident that is symptomatic, and follow up testing for covid. Review through the QAPI process for 3 months by the administrator. 5. Completion date: 02/04/2026
F0880 · Flesher's Fairview Health Care Center Inc (NC)
Surveyed 09/22/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

Infection prevention and control standards should be maintained for all staff and residents based on the facility policy and procedures as well and federal and local guidelines. Resident #2…

View Full Plan Text
F0880 Completion Date: 09/25/2025 Infection prevention and control standards should be maintained for all staff and residents based on the facility policy and procedures as well and federal and local guidelines. Resident #2 and Resident #8 were both placed on EBP Precautions. Other residents/staff have the potential to be affected if other residents met the criteria of being on EBP and were not on the precautions. The ADON who is the facilities infection preventionist audited every resident to ensure if they met the precautions of EBP they had the appropriate signage on their room and ensured required PPE was available. This was completed on 9/22/25. Education was provided to the DON and ADON by the Administrator on EBP precautions, what the criteria of EBP is, as well as making sure needed precautions are current and appropriate. Education was also provided to the wound care nurse by the DON on the proper use of PPE, as well as correct step by step procedures of a dressing change. This education was done on 9/22/25. DON or designee will observe 3 dressing changes a week Continued from page 100 are followed, and dressing changes are completed properly. This monitoring will be 3x/week until compliance is maintained for one month or longer if the QAPI committee recommends. Documentation of the monitoring will be maintained and presented by the DON at the QAPI meetings where corrective action will be evaluated for effectiveness and changes made as needed. Completion Date 9/23/25
F0880 · Ridgewood Living & Rehabilitation Center (NC)
Surveyed 09/05/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

On 09/03/2025, the involved Licensed Nurse was educated on Enhanced Barrier Precautions (EBP) by the Director of Nursing (DON). Address how the facility will identify other residents having…

View Full Plan Text
F0880 Completion Date: 09/23/2025 On 09/03/2025, the involved Licensed Nurse was educated on Enhanced Barrier Precautions (EBP) by the Director of Nursing (DON). Address how the facility will identify other residents having the potential to be affected by the same deficient practice. On 09/15/2025, the Infection Preventionist (IP) completed an audit of all residents to review the need for EBP; no new residents were identified to require EBP. Address what measures will be put into place or systemic changes made to ensure that the deficient practice will not recur. On 09/15/2025, all nursing staff were educated on the EBP policy, including indications for EBP, personal protective equipment (PPE) requirements, examples of high-contact resident care, and recognition of EBP doorway signage; education was provided by the DON and IP. As of 09/19/2025, absent or newly hired staff will be educated by the DON or designee prior to accepting an assignment. Continued from page 25 Indicate how the facility plans to monitor its performance to make sure that solutions are sustained. The DON or designee will observe high-contact resident care for five residents on EBP each week for eight weeks to verify that required PPE is used. Findings will be presented at the monthly Quality Assurance and Performance Improvement (QAPI) meeting by the DON. Completion Date: 09/20/2025
F0880 · Menno Haven Rehabilitation Center (PA)
Surveyed 08/13/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use F0880 →

1. No harm occurred to guest 35. 2. Education was provided to Nurse 2 on the proper hand hygiene and providing a clean field during wound care. 3. Licensed staff will be re-educated on wound…

View Full Plan Text
F0880 Correction Date: 09/26/2025 1. No harm occurred to guest 35. 2. Education was provided to Nurse 2 on the proper hand hygiene and providing a clean field during wound care. 3. Licensed staff will be re-educated on wound care with an emphasis on proper hand hygiene between glove changes and establishing and maintaining a clean field during wound treatments. 4. The Infection Control RN will perform random audits weekly x 4 weeks of licensed staff performing wound treatments to assure proper hand hygiene is being performed and a clean field is established and maintained during wound treatments. Identified issues will be brought to the Quality Assurance and Improvement Committee for further review and discussion until substantial compliance is achieved. 5. Date of Compliance: September 26th, 2025
F0880 · Little Sisters of the Poor (PA)
Surveyed 10/01/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

Repeat Legionella water testing was completed on August 27, 2026, with no Legionella detected. The Department of Health was notified of the results, and the guidance provided was implemented.…

View Full Plan Text
F0880 Correction Date: 11/12/2026 - Repeat Legionella water testing was completed on August 27, 2026, with no Legionella detected. The Department of Health was notified of the results, and the guidance provided was implemented. The initial failure to report and respond to positive results could not be corrected retroactively. - Regarding Resident R5, Employee E5 was identified as failing to establish a clean field and prevent cross-contamination during a dressing change. Employee E5 will receive individualized re-education and a dressing change competency evaluation. - The Nursing Home Administrator or designee will review the facility's water management and Legionella testing procedures to ensure timely communication, reporting, and implementation of corrective actions following positive results. - The Director of Nursing or designee will conduct a facility-wide audit of residents receiving wound treatments to identify signs and symptoms of infection and verify that appropriate infection prevention practices are followed during dressing changes. Identified concerns will be addressed promptly. - The Nursing Home Administrator or designee will re-educate personnel responsible for the water management program on Legionella testing, reporting requirements, and implementation of corrective actions. - The Director of Nursing or designee will re-educate licensed nursing professionals, including Employee E5, on infection prevention and control requirements, including hand hygiene, establishing and maintaining a clean field, aseptic wound care techniques, and prevention of cross-contamination. Dressing change competency evaluations will be completed. - The Nursing Home Administrator or designee will review quarterly Legionella testing results to verify timely reporting and implementation of corrective actions as indicated. Results will be reviewed during monthly Safety Meetings and quarterly QAPI meetings. - The Director of Nursing or designee will audit dressing change practices for residents receiving wound treatments weekly for four weeks, monthly for one month, and quarterly for one quarter to verify compliance with infection prevention procedures. Findings will be reported to the Quality Assurance and Performance Improvement (QAPI) Committee for review and corrective action as indicated. - Date of Compliance: November 12, 2026.
F0880 · Wyomissing Health and Rehabilitation Center (PA)
Surveyed 09/25/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

1. Resident 99 suffered no ill effects from the deficient practice. 2. Education was provided to individual LPN on those residents currently on Enhanced Barrier Precautions by DON/Designee. 3.…

View Full Plan Text
F0880 Correction Date: 11/10/2026 1. Resident 99 suffered no ill effects from the deficient practice. 2. Education was provided to individual LPN on those residents currently on Enhanced Barrier Precautions by DON/Designee. 3. Nursing Staff will be re-educated on Enhanced Barrier Precaution Policy by DON/Designee. 4. Random audits of residents on Enhanced Barrier Precautions will be completed weekly x4 weeks by the DON/Designee. Findings will be reviewed at QAPI to ensure effectiveness of plan of correction.
F0880 · Harborview Rehabilitation and Care Center at Doylestown (PA)
Surveyed 09/18/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

Enhanced Barrier Precautions 1. Enhanced Barrier Precautions were implemented for residents who met criteria, appropriate signage was posted, and PPE was made available. 2. Reeducation was…

View Full Plan Text
F0880 Correction Date: 10/06/2026 F0880 Enhanced Barrier Precautions 1. Enhanced Barrier Precautions were implemented for residents who met criteria, appropriate signage was posted, and PPE was made available. 2. Reeducation was provided to nursing staff regarding Enhanced Barrier Precautions and required PPE during high-contact resident care. 3. An initial audit was conducted to identify residents who met criteria for Enhanced Barrier Precautions and to ensure signage and PPE were in place. 4. DON/designee will conduct weekly audits X4, then monthly audits X3. Results of the audits will be presented to the Quality Assurance Committee for review.
F0880 · West Chester Rehabilitation and Healthcare Center (PA)
Surveyed 09/15/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

1. R100 had an Enhanced Barrier Precautions signed placed and personal protective equipment within appropriate distance from the resident resident room. An audit was conducted of all residents…

View Full Plan Text
F0880 Correction Date: 10/13/2026 1. R100 had an Enhanced Barrier Precautions signed placed and personal protective equipment within appropriate distance from the resident resident room. An audit was conducted of all residents on Enhanced Barrier Precautions to ensure that signs are placed appropriately and personal protective equipment is within an appropriate distance to the room. 3. Licensed staff were educated on Enhanced Barrier Precautions, placement of signs indicating a resident in on Enhanced Barrier Precautions and ensuring that personal protective equipment is within an appropriate distance to the resident room. The Director of Nursing/Designee will conducted an audit of 10 residents weekly for 4 weeks followed by 10 residents monthly for 2 months to ensure that Enhanced Barrier Precaution signs are placed and that personal protective equipment is appropriately placed. Audit results will be submitted to the Quality Assurance Performance Improvement Committee for additional review and recommendations as needed. Further audit frequency will be determined based on prior audit findings
F0880 · Woodhaven Health & Rehab Center (PA)
Surveyed 09/14/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

The staff member observed during the survey was immediately educated regarding proper infection control practices during wound care, including maintaining a clean field, proper use of personal…

View Full Plan Text
F0880 Correction Date: 10/20/2026 The staff member observed during the survey was immediately educated regarding proper infection control practices during wound care, including maintaining a clean field, proper use of personal protective equipment, prevention of contamination of wound care supplies, and hand hygiene as appropriate during the procedure. Residents receiving wound care services were reviewed for any signs or symptoms of infection. Appropriate follow-up was completed as indicated. The Director of Nursing, Wound Nurse, or designee audited residents receiving wound care services to ensure dressing changes were completed according to physician orders and accepted infection prevention standards. Observations of wound care procedures were conducted for licensed nurses who perform dressing changes. Licensed nurses were re-educated on facility wound care policies and infection prevention practices during dressing changes. The facility reviewed wound care processes and treatment cart organization to ensure required supplies are available and maintained in a sanitary manner. Competency validation for wound care procedures was completed for nurses who perform treatments. The Director of Nursing, Wound Nurse, Infection Preventionist, or designee will observe wound dressing changes weekly for four weeks and monthly for two months thereafter to ensure proper infection control practices are utilized during wound care. Results will be taken to the QAPI for review and revision as needed.
F0880 · Amoroso Healthcare and Rehabilitation Woodridge (PA)
Surveyed 09/10/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

No residents were identified as being affected by the alleged deficient practice. Employee #4 received education and discipline. Employee #5 is contracted and is no longer allowed to schedule…

View Full Plan Text
F0880 Correction Date: 10/20/2026 No residents were identified as being affected by the alleged deficient practice. Employee #4 received education and discipline. Employee #5 is contracted and is no longer allowed to schedule shifts at the facility. Director of Nursing and Nurse Manager conducted a facility-wide audit to identify infection control concerns on September 18, 2026. No issues were identified. Licensed nurses, nurse aides, and therapy staff will be educated by the Director of Nursing/designee on the facility policy titled "Laundry and Bedding, Soiled." Audits will be conducted by the Director of Nursing/designee on linen handling. Audits will be conducted twice a week for two (2) weeks, weekly for two (2) weeks, then monthly for two (2) months. Audit results will be forwarded to Quality Assurance Committee for review and recommendation.
F0880 · Independence Rehab and Nursing (PA)
Surveyed 09/08/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

1. R245 and R13 had no negative effects from staff not wearing PPE 2. Review of residents on EBP to ensure proper PPE is available and in place on the units. 3. Educated facility staff on the…

View Full Plan Text
F0880 Correction Date: 10/09/2026 1. R245 and R13 had no negative effects from staff not wearing PPE 2. Review of residents on EBP to ensure proper PPE is available and in place on the units. 3. Educated facility staff on the facility's EBP policy. 4. audit of all residents on EBP will be conducted by DON/Designee to ensure process being followe dwill be conduted weekly x4 followed by monthly x2 Results reported to QAPI
F0880 · Ivy Park Post Acute (PA)
Surveyed 08/28/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use F0880 →

Resident R8 did not have any negative outcomes due to the miscommunication, and the enhanced barrier sign was immediately placed on her door. The second-floor refrigerator in the medication…

View Full Plan Text
F0880 Correction Date: 10/09/2026 Resident R8 did not have any negative outcomes due to the miscommunication, and the enhanced barrier sign was immediately placed on her door. The second-floor refrigerator in the medication room was cleaned and the yellow substance and built up of ice was removed. Resident R128 did not have any negative outcomes due to Employee E7 failing to clean the table after removal of the dressing supplies and barrier field during a wound dressing change. The facility will audit all residents' needs enhanced barrier precautions to ensure proper signage is in place. All the medication room refrigerators were audited to ensure they were sanitary. The director of nursing and/or designee will educate the nursing staff on the proper dressing change procedure. Education will also be provided to nursing staff on proper use of enhanced barrier precautions. The administrator will educate the housekeeping department on ensuring the medication refrigerators will stay sanitary at all times. An audit will be completed 3 times a week x 4 weeks to ensure enhanced barrier signs are hung on proper room doors. Another audit will be conducted on 3 random dressing changes per week x 4 weeks to ensure proper infection control techniques are being used. Lastly, the medication room refrigerators will be checked for cleanliness 4 x a week x 4 weeks. The results of these audits will be reviewed in the next QAPI where they will determine if continuation is necessary.