K0352 · Harborview Rehabilitation and Care Center at Doylestown (PA)
Surveyed 09/21/2026 · Spot-checks: weekly for 4 weeks
Approved Filing Use K0352 →

1-The facility is in the process of replacing the fire pump. Installation was placed on hold pending submission of the required plans to the Pennsylvania Department of Health Division of…

View Full Plan Text
K0352 Correction Date: 11/10/2026 1-The facility is in the process of replacing the fire pump. Installation was placed on hold pending submission of the required plans to the Pennsylvania Department of Health Division of Safety Inspection Plan Review Department. The fire pump vendor submitted the plans for review as of 10/14/2026. Approval is currently pending. 2-The NHA & Maintenance Director will coordinate with the fire pump vendor and Plan Review Department to obtain the required approval. Upon approval, the vendor will proceed with the fire pump installation and complete all required connections to the existing fire alarm panel. The facility's targeted completion date for installation and required connections is 11/10/2026, subject to Plan Review approval. 3-Following installation, the fire pump and fire alarm vendors will conduct the required testing to verify proper operation of the fire pump and ensure all required supervisory signals are communicating with the fire alarm panel. Testing and documentation are targeted for completion by 11/10/2026. 4-The sprinkler system remains under an impairment condition while the fire pump replacement is pending. The facility continues to conduct documented hourly fire watches, 24 hours a day, throughout the entire facility. Fire watch logs are maintained and available for review. Fire watches will remain in place until the fire protection systems are restored, and discontinuation is authorized by the appropriate authority. 5-The NHA &Maintenance Director will monitor the status of the Plan Review approval, fire pump installation, and required testing. All vendor reports, approvals, and testing documentation will be maintained. Following correction, audits will be conducted weekly for four weeks, then monthly for three months, with findings reviewed through QAPI.