Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
Federal CMS Precedents Shown for Wyoming: CMS SOM § 7304 Plan-of-Correction rules apply nationwide. Below are verified Passed-Revisit examples you can adapt for Wyoming, or view local county stats in
Wyoming State Guides →
K0351 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: weekly for 4 weeks
1. The 2 upright sprinkler heads located in the laundry room dryer change have been relocated down by Johnson Controls, to ensure a minimum of 1 inch from the overhead. 2. All upright…
View Full Plan Text
K0351 Correction Date: 09/30/2026
1. The 2 upright sprinkler heads located in the laundry room dryer change have been relocated down by Johnson Controls, to ensure a minimum of 1 inch from the overhead.
2. All upright sprinkler heads will be inspected to ensure they were installed with a minimum of 1 inch clearance from the overhead.
3. Director of Environmental Services or designee will audit upright sprinkler heads quarterly for 3 quarters to ensure compliance. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0351 · Richland Bean Blossom Health Care Center (IN)
Surveyed 04/27/2026 · Spot-checks: monthly for 4 weeks
Safe Care was immediately contacted to replace the eschutcheon in resident room to ensure it was seated flush with the ceiling leaving an inch annular space around the sprinkler head. A…
View Full Plan Text
K0351 Safe Care was immediately contacted to replace the eschutcheon in resident room to ensure it was seated flush with the ceiling leaving an inch annular space around the sprinkler head. A deficiency in this practice has the potential to affect staff and 16 residents. A facility audit was conducted to ensure that all sprinkler plates are seated flush with the ceiling leaving an inch of annular space Audits for the appropriate seating and placement of sprinkler plates will be completed by the Maintenance Director or designee monthly x 6 months or until 100% compliance is achieved. Results of these audits will be presented to the QA committee, and any recommendations for changes or updates by the QA committee will be put into place as indicated. These systemic changes will be in place on or before 05/30/2026
K0351 · Manatawny Center for Rehabilitation and Nursing (PA)
Surveyed 03/04/2026 · Spot-checks: monthly for 4 weeks
1. The Maintenance Director will engage a qualified fire sprinkler contractor (Johnson Controls) to evaluate and extend sprinkler coverage into the basement Electrical room, Transfer Switch…
View Full Plan Text
K0351 Correction Date: 05/03/2026
1.The Maintenance Director will engage a qualified fire sprinkler contractor (Johnson Controls) to evaluate and extend sprinkler coverage into the basement Electrical room, Transfer Switch Control Room to ensure complete sprinkler protection of all useable areas. The work will be scheduled and completed in accordance with NFPA 13 requirements. Plan review contacted for corrective action requirements. The vendor will provide plan drawings and hydraulic calculations for submission to plan review for approval. 2.The Maintenance Director and relevant staff members will be educated on NFPA 101 Sprinkler System - Installation requirements, with specific focus on the requirement for complete sprinkler coverage of all useable areas. 3.The Maintenance Director/designee will conduct a thorough inspection of all sprinklered areas within the facility to verify complete coverage. Any additional areas of concern will be addressed immediately. Monthly audits will be conducted to ensure no new areas of incomplete coverage develop. 4.Findings will be reviewed at the Quality Assurance Performance Improvement meeting.
K0351 · Rose View Rehab and Care Center (PA)
Surveyed 12/10/2025 · Spot-checks: weekly for 4 weeks
1. Bid will be approved to install sprinkler to the Therapy Department Closet. 2. Other closets will be checked to ensure proper sprinkler protection. 3. Maintenance will be re-educated on…
View Full Plan Text
K0351 Correction Date: 01/20/2026
1. Bid will be approved to install sprinkler to the Therapy Department Closet.
2. Other closets will be checked to ensure proper sprinkler protection.
3. Maintenance will be re-educated on ensuring that all Therapy Department Closets will have sprinkler protection.
4. Maintenance Director/ designee will conduct random audits to verify that department closets will be checked for proper sprinkler protection weekly for 4 weeks and then monthly for 2 months thereafter. Audit results will be presented at QAPI meeting for review and recommendations.
K0351 · Trillium Place (PA)
Surveyed 12/08/2025 · Spot-checks: weekly for 4 weeks
The standard response sprinkler head has been replaced with a quick response sprinkler head on the 1st floor Housekeeping Storage Room to achieve consistency. -The plan of correction has been…
View Full Plan Text
K0351 Correction Date: 12/17/2025
The standard response sprinkler head has been replaced with a quick response sprinkler head on the 1st floor Housekeeping Storage Room to achieve consistency. -The plan of correction has been completed on 12/17/25. -Education has been provided to the maintenance team on 12/17/2025. -Audits will be conducted by the Assistant Director of Facilities or designee quarterly. -Audit reports will be reported to the Quality Assurance committee for review and further recommendations.
K0351 · Amoroso Healthcare and Rehabilitation Woodridge (PA)
Surveyed 10/28/2025 · Spot-checks: weekly for 4 weeks
1. Maintenance Director educated on sprinkler heads with consistent thermal sensitivity need to be in a smoke compartment on 11/7/25. 2. Johnson Control replaced the standard sprinkler head…
View Full Plan Text
K0351 Correction Date: 12/09/2025
1. Maintenance Director educated on sprinkler heads with consistent thermal sensitivity need to be in a smoke compartment on 11/7/25.
2. Johnson Control replaced the standard sprinkler head with quick response sprinkler head on 10/31/25.
3. Maintenance Director will QA 5 smoke compartments weekly then monthly to ensure that they have the consistent thermal sensitivity. Results to be reviewed with the QAPI committee.
4. Compliance by 12/9/25.
K0351 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 08/18/2025 · Spot-checks: monthly for 4 weeks
The area in the first floor landing stairwell has sprinkler coverage. All areas have the potential to be affected Maintenance staff will be educated ensuring there is complete sprinkler…
View Full Plan Text
K0351 Correction Date: 10/01/2025
The area in the first floor landing stairwell has sprinkler coverage. All areas have the potential to be affected Maintenance staff will be educated ensuring there is complete sprinkler coverage. Random audits will be conducted by the maintenance director or designee Monthly x2 with reports to QAPI to ensure that there is complete sprinkler coverage
K0351 · John J Kane Regional Center- Ross Township (PA)
Surveyed 04/16/2025 · Spot-checks: weekly for 4 weeks
During the annual Life Safety Inspection on April 16th, 2025, it was found that there were no sprinklers on top of a lowered ceiling in excess of four feet wide. County Vendor S.A. Comunale…
View Full Plan Text
K0351 Correction Date: 05/30/2025
During the annual Life Safety Inspection on April 16th, 2025, it was found that there were no sprinklers on top of a lowered ceiling in excess of four feet wide. County Vendor S.A. Comunale was contacted for addition of sprinklers. Paul Schwonek, Service Manager for S.A. Comunale, came to the facility on Monday April 21st and performed an inspection of what work needed to be completed to rectify the issue. Facility received an initial estimate for work to be completed. Paul Schwonek contacted Ross Township to see if a permit would need to be issued. He was informed that S.A. Comunale would need a permit to complete the repairs. An engineer is scheduled for the week of April 28th to complete drawings and submit them to Ross Township to issue the permit. Facility will notify Division of Safety Inspection for a preliminary review and follow all guidance so that facility is in compliance with proper procedures.
K0351 · Transitions Healthcare Washington PA (PA)
Surveyed 03/19/2025 · Spot-checks: monthly for 4 weeks
1. Sprinkler heads were converted so that all sprinkler heads were standardized to the quick response sprinkler head 2. No other variant sprinkler heads were identified within the facility. 3.…
View Full Plan Text
K0351 Correction Date: 05/05/2025
1. Sprinkler heads were converted so that all sprinkler heads were standardized to the quick response sprinkler head
2. No other variant sprinkler heads were identified within the facility.
3. The Director of Plant operations or designee will audit sprinkler heads to ensure that they are all the quick response sprinkler heads monthly x 3 months
4. Audits will be taken to the safety committee and submitted to the QAPI committee for review of findings and further interventions are warranted.