K0341 · Capitol Rehabilitation and Healthcare Center (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
1. Plan Review contacted and requested that a plan including a drawing and narrative be submitted through the DCI portal for the installation of a pull station within five feet of the Therapy…
View Full Plan Text
K0341 Correction Date: 01/13/2026
1. Plan Review contacted and requested that a plan including a drawing and narrative be submitted through the DCI portal for the installation of a pull station within five feet of the Therapy Gym rear exit door. The Center will be requesting a Time Limited Waiver.
2. The Plant Operations staff will be educated on the pull station requirements.
3. Five random audits will be completed weekly for four weeks then monthly for three months on the placement of manual fire pull stations to ensure they meet the requirement of five feet. All audits will be shared with the QAPI committee for further recommendations
K0341 · Kadima Rehabilitation & Nursing at New Castle (PA)
Surveyed 05/12/2026 · Spot-checks: weekly for 4 weeks
Corrective Action for Residents Affected: No residents were directly affected by the deficient practice. An audit of all pull stations has been completed on 5/29/2026. No other non-compliant…
View Full Plan Text
K0341 Correction Date: 07/07/2026
Corrective Action for Residents Affected: No residents were directly affected by the deficient practice. An audit of all pull stations has been completed on 5/29/2026. No other non-compliant pull stations were observed. Upon identification of the deficiency, the facility contacted its licensed fire alarm contractor to evaluate the cited locations. Work to begin on 6/2/2026 The pull stations near resident room and the lobby will be adjusted to comply with the required mounting height of 42 to 48 inches above the finished floor. A compliant manual fire alarm pull station will be installed within five feet of the emergency exit door Work on the above will be completed as soon as possible