K0225 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 07/15/2026 · Spot-checks: monthly for 4 weeks
The fourth floor the center stairway latches.. The first floor kitchen stairway latches. The stairwells doors have the potential to be affected. Maintenance will be educated on maintaining…
View Full Plan Text
K0225 Correction Date: 09/01/2026
The fourth floor the center stairway latches.. The first floor kitchen stairway latches. The stairwells doors have the potential to be affected. Maintenance will be educated on maintaining stairwell doors Random audits will be conducted by the Maintenance or designee to ensure stairwells doors are maintained Monthly x2 with reports to QAPI
K0225 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
Stairways and Smokeproof Enclosures: The facility had two unprotected penetrations of the stair tower located next to the Zone 1 Therapy Room around a metallic-clad electrical cable and blue…
View Full Plan Text
K0225 Correction Date: 08/05/2026
0225 Stairways and Smokeproof Enclosures: The facility had two unprotected penetrations of the stair tower located next to the Zone 1 Therapy Room around a metallic-clad electrical cable and blue wires, above the suspended ceiling of the Therapy Room. No residents were identified. All residents have the potential to be affected. Maintenance Director sealed all open areas in Zone 1 Therapy Room using an approved through penetration fire stop system, and above the suspended ceiling of the Therapy Room with appropriate fire-resistant materials on 09JUL2026. Facility wide audit was completed by the Maintenance Director/Designee on 09JUL2026 to address any unprotected penetrations. 21JUL2026, NHA educated Maintenance Staff and team on the requirements to ensure all penetrations are sealed appropriately/ Maintenance will maintain the rating of all stair towers per regulation. Maintenance Director/Designee will conduct a compliance audit monthly x4 months, then quarterly to ensure requirements are met. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
K0225 · York South Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/30/2026 · Spot-checks: monthly for 4 weeks
#1 Door may be replaced or penetrations will be addressed by replacing hardware and sealing any further penetrations with appropriate rated sealants. Outside vendor has been acquired for this…
View Full Plan Text
K0225 Correction Date: 08/26/2026
#1 Door may be replaced or penetrations will be addressed by replacing hardware and sealing any further penetrations with appropriate rated sealants. Outside vendor has been acquired for this repair/replacement. Time Limited Waiver for Door Purchase requested and sent via USPS to Charles Schlegel. Requested date for Time Limited Waiver is 12/31/2026. The Maintenance Director will conduct and document an initial facility wide audit, then proceed with monthly door/fire door inspections using the facility's standardized checklist to ensure there are no penetrations or missing fire rated hardware components. The Administrator will review all completed inspection checklists on a monthly basis to verify compliance and ensure that any identified issues are addressed promptly. Findings and corrective actions will be tracked and trended to identify any patterns or recurring concerns. #2 Monthly fire door inspection reports will be submitted to the QAPI Committee for review at each quarterly meeting. The QAPI Committee will review trends, evaluate the effectiveness of corrective actions, and make recommendations for further improvement as needed.
K0225 · Cliveden Nursing and Rehabilitation Center (PA)
Surveyed 06/22/2026 · Spot-checks: weekly for 4 weeks
The electric bike has been removed. - The door at the first-floor stair tower in the lobby has been repaired - The maintenance team has conducted a full facility wide assessment, and no other…
View Full Plan Text
K0225 Correction Date: 08/10/2026
- The electric bike has been removed. - The door at the first-floor stair tower in the lobby has been repaired - The maintenance team has conducted a full facility wide assessment, and no other broken doors or improper storage was noted. - Facility Educator or designee will In service staff on the importance of not storing items in the stair towers. - Maintenance Director and/or team will conduct facility rounds weekly x 4 weeks to ensure compliance in all areas. - Results will be reported in monthly QAPI
K0225 · The Village at Penn State (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 5 months
1. Paint supplies were removed from 2nd floor stair tower. 2. Paint contractor was verbally educated that supplies cannot be stored in stairwells. 3. "No Storage" signage will be placed in…
View Full Plan Text
K0225 Correction Date: 07/06/2026
1. Paint supplies were removed from 2nd floor stair tower.
2. Paint contractor was verbally educated that supplies cannot be stored in stairwells. 3. "No Storage" signage will be placed in alcoves of stairwells.
4. EVS Director/ designee will round weekly x one month then monthly for 5 months to ensure there is no storage in stairwells. Audit results will be reported to the Quality Assurance Performance Improvement committee for review and recommendation.
5. Date of compliance June 30, 2026
K0225 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. The facility repaired the positive latching hardware on the Zone 5 stairtower double doors leading to the "D" Wing to ensure the doors positively latch and maintain the required fire…
View Full Plan Text
K0225 Correction Date: 06/25/2026
1. The facility repaired the positive latching hardware on the Zone 5 stairtower double doors leading to the "D" Wing to ensure the doors positively latch and maintain the required fire resistance rating of the stairtower enclosure in accordance with NFPA 101 requirements.
2. The Director of Plant Operations, or designee, conducted an inspection of stairtower doors within the facility to verify positive latching hardware was present and functioning properly. Any identified deficiencies were corrected immediately through repair or replacement of hardware as needed.
3. Inspections will be conducted monthly and documented by the Maintenance Department. In addition, maintenance staff were educated on NFPA 101 requirements related to fire-rated door assemblies and stair enclosure integrity. All staff were educated to report any door that does not close and positively latch properly to the Maintenance Department.
4. The Director of Plant Operations, or designee, will: - Conduct and document monthly inspections of fire-rated stairwell doors for three months, then quarterly thereafter. - Maintain inspection logs for review during Quality Assurance and Performance Improvement (QAPI) meetings. - Immediately correct any identified deficiencies.
K0225 · Rose City Nursing and Rehab at Lancaster (PA)
Surveyed 05/06/2026 · Spot-checks: weekly for 4 weeks
Crown Fire Door Products was contacted and provided a quote to replace the door gap solutions hardware. The vendor will educate the Maintenance Director on how to install the door gap…
View Full Plan Text
K0225 Correction Date: 06/30/2026
Crown Fire Door Products was contacted and provided a quote to replace the door gap solutions hardware. The vendor will educate the Maintenance Director on how to install the door gap solutions properly. The door gap solutions will be replaced and installed per manufacturer's specifications for (a) 3rd floor front stair tower top; (b) 2nd floor front stair tower top; (c) 1st floor rear tower stair tower latch side and top. The vendor will educate the Maintenance Director on how to properly install the hardware. The stair tower door gap solution hardware will be repaired/replaced per manufacturer specifications for (a) 3rd floor front stair tower fire rated tag is now legible; (b) 2nd floor front stair tower; and (c) 1st floor back stair tower. Building wide audit of the stair tower doors having appropriate gap solution hardware was completed. Audits will be done monthly to ensure hardware is intact, legible and follows manufacturer guidelines.
2. Maintenance Director will audit weekly x 2 weeks, then monthly x 2, then monthly ongoing. Results of audits will be submitted to monthly QAPI for review and recommendations.
K0225 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 05/01/2026 · Spot-checks: monthly for 4 weeks
The 2nd floor door to the stairtower, by Resident resident room, will be adjusted to positively latch within the door frame. The Nursing Home Administrator will educate the Maintenance…
View Full Plan Text
K0225 Correction Date: 06/03/2026
The 2nd floor door to the stairtower, by Resident resident room, will be adjusted to positively latch within the door frame. The Nursing Home Administrator will educate the Maintenance Director and Maintenance team to ensure all doors are positively latched with the frame. Random monthly audits will be done by the Maintenance Director/designee to ensure all compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0225 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
1. Adjustments were made to B1, center stair tower doors door to ensure it fully closes and latch within its frame. Facility staff will monitor the doors to ensure they operate as design to…
View Full Plan Text
K0225 Correction Date: 06/09/2026
1. Adjustments were made to B1, center stair tower doors door to ensure it fully closes and latch within its frame. Facility staff will monitor the doors to ensure they operate as design to fully close and latch within its frame on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0225 · Pocopson Home (PA)
Surveyed 04/01/2026 · Spot-checks: weekly for 4 weeks
1. Maintenance will remove the recessed fire extinguisher cabinet and place two 5/8 pieces of drywall in opening. The fire extinguisher will be relocated. The Maintenance department will…
View Full Plan Text
K0225 Correction Date: 04/24/2026
1. Maintenance will remove the recessed fire extinguisher cabinet and place two 5/8 pieces of drywall in opening. The fire extinguisher will be relocated. The Maintenance department will maintain the rating of all stair towers and will inspect for penetrations and door latching within door frames during their weekly maintenance rounds. Audit results will be reported to the Quality Improvement/Infection Control Committee. Preparation and submission of this Plan of Correction is required by State and Federal law. This Plan of Correction does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding.
K0225 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
All penetrations in stairwell C around the sprinkler pipe on the first floor, stair tower C to be sealed with intumescent caulk. Materials used are in accordance with ATSM #814 (UL1479)…
View Full Plan Text
K0225 Correction Date: 05/15/2026
All penetrations in stairwell C around the sprinkler pipe on the first floor, stair tower C to be sealed with intumescent caulk. Materials used are in accordance with ATSM #814 (UL1479) Outside contractor policy developed to ensure that any outside vendors or in house personnel seal any created penetrations to NFPA 101 standards. Quarterly inspections on fire barriers placed into Maintenance program for documentation of compliance. This will be reviewed during quarterly Quality Assurance committee meeting that includes the Executive Director/Nursing Home Administrator, Directo of Nursing, and Director of Facility Operations.
K0225 · Marywood Heights (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
Facility had identified damage on door prior to survey. On 1/9/26 a new door was ordered for replacement. Upon arrival, door was damaged and had to be sent back for replacement on 2/20/26. New…
View Full Plan Text
K0225 Correction Date: 03/31/2026
Facility had identified damage on door prior to survey. On 1/9/26 a new door was ordered for replacement. Upon arrival, door was damaged and had to be sent back for replacement on 2/20/26. New door has been ordered with no delivery date by Kelly Brothers. Will be replaced by Kelly Brothers once arrive. Maintenance Director or designee will complete quarterly audits and submit to QAPI committee to ensure doors are in appropriate condition.
K0225 · Edenbrook South (PA)
Surveyed 02/18/2026 · Spot-checks: weekly for 4 weeks
1. The trash can located within the basement-level portion of the exit stair tower has been removed. A review will be completed of exit stair tower to validate proper maintenance of the…
View Full Plan Text
K0225 Correction Date: 04/07/2026
1. The trash can located within the basement-level portion of the exit stair tower has been removed. A review will be completed of exit stair tower to validate proper maintenance of the enclosure. The Maintenance Department will be educated related to the maintenance of exit stair tower enclosures.
2. Audits will be conducted by the Maintenance Director/designee to validate that exit stair tower enclosures are maintained. Audits will be conducted weekly for four weeks and then monthly for two months. Audit results will be submitted to the facility QAPI (Quality Assurance Performance Improvement) Committee for review. Date of compliance: April 7, 2026.
K0225 · The Williamsport Home (PA)
Surveyed 01/05/2026 · Spot-checks: monthly for 3 months
1) The chairs and items stored under the stairs of the middle stair tower were removed. 2) A full house audit was conducted by the Maintenance Director/and or designee. 3) The Maintenance…
View Full Plan Text
K0225 Correction Date: 02/10/2026
1) The chairs and items stored under the stairs of the middle stair tower were removed. 2) A full house audit was conducted by the Maintenance Director/and or designee. 3) The Maintenance Director and/or designee will complete audits x2 weeks and monthly thereafter for 3 months to ensure compliance. 4) The results of the audits will be reviewed at the Quality Assurance meeting for comments or suggestions.
K0225 · Cedar Crest Post Acute (PA)
Surveyed 12/17/2025 · Spot-checks: monthly for 4 weeks
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies herein. To remain in compliance with all federal and…
View Full Plan Text
K0225 Correction Date: 01/15/2026
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies herein. To remain in compliance with all federal and state regulations the center has taken, or will take the actions set forth in the following plan of correction.
1. A. West stair tower door will be adjusted by the Maintenance Director and/or designee to ensure there are no gaps between the door and frame. B. North stair tower door will be adjusted by the Maintenance Director and/or designee to ensure there are no gaps between the door and frame. C. First floor stair tower door near 124 will be adjusted by the Maintenance Director and/or designee to ensure there are no gaps between the door and frame.
2. Monthly audit will be completed for gaps in doors by Maintenance Director/designee. Identified areas of concern will be addressed. Identified trends to be reviewed during QAPI.