K0914 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

1) The annual inspection and testing of the electrical outlets in the patient care areas, in three of four smoke zones within the components has been completed. 2) Maintenance director will be…

View Full Plan Text
K0914 Correction Date: 09/15/2026 1) The annual inspection and testing of the electrical outlets in the patient care areas, in three of four smoke zones within the components has been completed. 2) Maintenance director will be educated on annual inspections and testing of the electrical outlets in the patient care areas. 3) NHA/designee will audit life safety books for required regulatory documentation semi-annually. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
K0914 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

0914: Electrical Systems - Maintenance and Testing: The facility failed to provide documentation verifying non-hospital grade electrical receptacles had been inspected, in seven of seven smoke…

View Full Plan Text
K0914 Correction Date: 08/05/2026 0914: Electrical Systems - Maintenance and Testing: The facility failed to provide documentation verifying non-hospital grade electrical receptacles had been inspected, in seven of seven smoke zones within the component. No residents were affected. All residents have the potential to be affected. Facility wide audit to be completed by the Maintenance Director/Designee by 05AUG2026 to ensure that all receptacles are operating properly and documented. On 21JUL2026, NHA educated the Maintenance Director on the importance of maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits monthly x 3 weeks then annually, to ensure that documentation for electrical receptacle inspection meet the requirement per regulation. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
K0914 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

1. The facility completed inspection and testing of all non-hospital-grade electrical receptacles located in patient care areas in accordance with NFPA 99 requirements. Any deficient…

View Full Plan Text
K0914 Correction Date: 06/25/2026 1. The facility completed inspection and testing of all non-hospital-grade electrical receptacles located in patient care areas in accordance with NFPA 99 requirements. Any deficient receptacles identified during testing were repaired or replaced. 2. The Director of Plant Operations, or designee, conducted a facility-wide review of all patient care areas to identify non-hospital-grade receptacles requiring annual testing and documentation. All applicable receptacles were inspected and documented to ensure compliance throughout the component. 3. Maintenance staff were educated regarding NFPA 99 electrical receptacle testing and documentation requirements. 4. The Director of Plant Operations, or designee, will: - Review preventive maintenance schedules monthly to verify required inspections are current. - Audit receptacle testing documentation quarterly for completeness and compliance. - Report compliance findings through the facility's Quality Assurance and Performance Improvement (QAPI) process for a minimum of three months, then quarterly thereafter. Any identified deficiencies will be corrected immediately.
K0914 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

The facility has corrected the deficiency. The annual tension and continuity testing of non-hospital grade electrical receptacles in patient sleeping areas was completed, and documentation has…

View Full Plan Text
K0914 Correction Date: 04/27/2026 The facility has corrected the deficiency. The annual tension and continuity testing of non-hospital grade electrical receptacles in patient sleeping areas was completed, and documentation has been maintained on-site. A tracking system has been implemented to ensure annual testing is completed timely. The Maintenance Director or designee will monitor compliance by reviewing testing records annually.
K0914 · Norriton Square Nursing and Rehabilitation Center (PA)
Surveyed 01/30/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

Maintenance director or designee will complete annual testing of electrical receptacles. NHA or designee will re-educate the maintenance director on completion of electrical receptacle…

View Full Plan Text
K0914 Correction Date: 03/08/2026 Maintenance director or designee will complete annual testing of electrical receptacles. NHA or designee will re-educate the maintenance director on completion of electrical receptacle testing. Quarterly audit of the receptacle testing will be completed by NHA or designee x 2. The results will be reviewed at the QAPI meeting x2 to ensure compliance.
K0914 · Harborview Rehabilitation and Care Center at Doylestown (PA)
Surveyed 10/20/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

1. The facility acknowledges that required electrical receptacle testing at patient bed locations had been completed; however, the documentation was maintained on an incorrect form that did…

View Full Plan Text
K0914 Correction Date: 11/26/2025 1.The facility acknowledges that required electrical receptacle testing at patient bed locations had been completed; however, the documentation was maintained on an incorrect form that did not capture all elements required by NFPA 99 (including polarity check, visual inspection, and grounding retention force). As of October 21st, 2025, the proper "Electrical Receptacle Testing Log" form has been implemented to ensure full compliance with all NFPA 99 testing requirements. 2.The Maintenance Director has reviewed all resident care areas and confirmed that receptacle testing was conducted in all required locations. Any areas missing complete documentation have been retested and recorded using the correct form. 3.The Maintenance Department has been re-educated on the proper documentation process using the approved "Electrical Receptacle Testing Log. The Maintenance Director will ensure all future testing utilizes this standardized form. 4.Maintenance Director/designee will conduct quarterly audits of receptacle testing logs to verify accuracy and compliance. Audit results will be reviewed during monthly QAPI meetings
K0914 · Hamilton Arms Center (PA)
Surveyed 09/10/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

1. Electrical receptacles will be tested within patient care areas within every 12 months. Inspection will be completed in October. 2. The testing report will be placed in the life safety…

View Full Plan Text
K0914 Correction Date: 11/03/2025 1. Electrical receptacles will be tested within patient care areas within every 12 months. Inspection will be completed in October. 2. The testing report will be placed in the life safety book. 3. Education will be provided to the maintenance department as to the 12 month requirement. 4. Results of the inspections will be reviewed and reported to the QAPI committee. 5. Date certain is 11-3-25
K0914 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 08/18/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

Electrical receptacles were tested and include the following. A. resident rooms B. visual Inspection of physical integrity C. correct polarity of the hot and neutral connection D. Retention…

View Full Plan Text
K0914 Correction Date: 10/01/2025 Electrical receptacles were tested and include the following. A. resident rooms B. visual Inspection of physical integrity C. correct polarity of the hot and neutral connection D. Retention force of the grounding blade shall not be less than the 115g(4oz) All areas have the potential to be affected. Maintenance staff will be educated ensuring that electric receptacles are tested at bedside location. Random audits will be conducted by the maintenance director or designee Monthly x2 with reports to QAPI to ensure that electric receptacles are tested at bed side
K0914 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/01/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

1. The electrical receptacles at resident bed locations are being tested for non-hospital grade receptacles which included resident care rooms, visual inspection of physical integrity, correct…

View Full Plan Text
K0914 Correction Date: 06/10/2025 1. The electrical receptacles at resident bed locations are being tested for non-hospital grade receptacles which included resident care rooms, visual inspection of physical integrity, correct polarity of the hot and neutral connections, and retention force of the grounding blade (not less than 115g) 2. The facility is completing the electrical receptacle testing within the required parameters as stated in #1. The results of the testing are being documented and will be placed in the facility Life Safety binder. 3. The Director of Maintenance has been educated on the requirements for the electrical receptacle testing to be completed at least 1 X a year with documented results and placed in the facility Life Safety binder. 4. The facility's Life Safety binder will be audited quarterly to ensure placement and availability of the facility documentation pertaining to electrical receptacle testing completion and results. Audit results will be reviewed at QAPI. 5. Date of Completion is Jun 10, 2025.
K0914 · Juniper Village at Brookline-Rehabilitation and Skilled Care (PA)
Surveyed 04/15/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

Audit of Electrical Receptables to identify yearly testing. - Nursing home administrator educated Maintenance staff on NFPA 101 Standard electrical Systems- Maintenance and testing of…

View Full Plan Text
K0914 Correction Date: 06/03/2025 - Audit of Electrical Receptables to identify yearly testing. - Nursing home administrator educated Maintenance staff on NFPA 101 Standard electrical Systems- Maintenance and testing of electrical receptacles including yearly testing. - Regular rounds of the electrical receptacles will be conducted to identify and correct any receptables that need yearling testing. - Maintenance Director will be responsible for this process
K0914 · Kadima Rehabilitation & Nursing at Washington (PA)
Surveyed 01/08/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0914 →

Based on documentation review, the facility failed to maintain electrical receptacles in patient sleeping areas in one instance. -Documentation will be implemented to ensure annual testing of…

View Full Plan Text
K0914 Correction Date: 02/04/2025 0914 -Based on documentation review, the facility failed to maintain electrical receptacles in patient sleeping areas in one instance. -Documentation will be implemented to ensure annual testing of non-hospital grade electrical receptacles (tension & continuity). -The Maintenance Director will be rein-serviced on preforming annual testing on non-hospital grade receptacles. -The Maintenance Director or designee will review and complete the annual testing to ensure the completion of the plan of corrections and report to the QA to ensure regulatory compliance.