1. Maintenance will use an approved fire system through the wall penetrations system number W-L 3195 on resident room and resident room. 2. The Maintenance Director/designee inspected…

View Full Plan Text
K0372 Correction Date: 09/23/2026 1. Maintenance will use an approved fire system through the wall penetrations system number W-L 3195 on resident room and resident room. 2. The Maintenance Director/designee inspected smoke-barrier walls throughout the facility for additional open or improperly sealed penetrations. Identified deficiencies were corrected using approved systems. 3. Maintenance staff and contractors were educated on preserving smoke-barrier integrity and properly sealing penetrations following construction, electrical, plumbing, or cabling work. 4. The Maintenance Director/designee will audit smoke barriers monthly for three months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
K0372 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

0372: Subdivision of Building Spaces - Smoke Barrier: The facility failed to maintain the smoke resistance of smoke barrier doors, affecting two of seven smoke compartments within the…

View Full Plan Text
K0372 Correction Date: 08/05/2026 0372: Subdivision of Building Spaces - Smoke Barrier: The facility failed to maintain the smoke resistance of smoke barrier doors, affecting two of seven smoke compartments within the component. No residents were affected. All residents have the potential to be affected. The cross-corridor smoke barrier door, near Resident resident room, was adjusted on 08JUL2026 to latch and release from the magnetic hold-open device by the Maintenance Director/designee as designed. Maintenance Director/designee audited all smoke barrier doors on 10JUL2026 to ensure proper latch and release function per regulatory requirements. On 21JUL2026, NHA educated Director of Maintenance and maintenance staff on maintaining corridor doors to meet the requirement of smoke tight integrity and latch properly. The Maintenance Director/Designee will conduct audit monthly x 3, of corridor doors to check function and integrity. The audits will continue Quarterly. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to the quarterly Quality Assurance Performance Improvement Committee for review and recommendations.
K0372 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
✓ Passed Re-Inspection Use K0372 →

1. The penetration located above floor smoke door closest to resident resident room was sealed with fire rated material. Facility staff will monitor smoke barrier walls to ensure smoke barrier…

View Full Plan Text
K0372 Correction Date: 06/09/2026 1. The penetration located above floor smoke door closest to resident resident room was sealed with fire rated material. Facility staff will monitor smoke barrier walls to ensure smoke barrier integrity on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0372 · Riverstreet Manor (PA)
Surveyed 04/27/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

All smoke barrier walls within the facility will be initially inspected and repaired promptly as needed. Future inspections will occur quarterly and will be monitored through TELS work order…

View Full Plan Text
K0372 Correction Date: 06/26/2026 All smoke barrier walls within the facility will be initially inspected and repaired promptly as needed. Future inspections will occur quarterly and will be monitored through TELS work order system and documentation will be filed in Life Safety Binder.
K0372 · Pocopson Home (PA)
Surveyed 04/01/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

Smoke barrier separation walls, affecting two of five floors within the component have been repaired as follows: a. A penetration of the smoke barrier wall, located above the smoke barrier…

View Full Plan Text
K0372 Correction Date: 04/02/2026 Smoke barrier separation walls, affecting two of five floors within the component have been repaired as follows: a. A penetration of the smoke barrier wall, located above the smoke barrier doors, closest to resident room, within the West Wing was sealed with You must state that the repair was made using "an approved through penetration fire stop system. b. A penetration of the smoke barrier separation wall, located above the smoke barrier doors, closest to the Nursing Supervisor's Office, within the West Wing was sealed with an approved through penetration fire stop system. c. 2:22 PM, a penetration of the smoke barrier wall, located above the smoke barrier doors, closest to Admissions, at the 2nd floor level within the Jones Building was sealed with an approved through penetration fire stop system. The facility will maintain the rating of the smoke barriers. Maintenance director will audit smoke barrier separation walls monthly during rounds. Audit results will be reported to the Quality Improvement/Infection Control Committee. Preparation and submission of this Plan of Correction is required by State and Federal law. This Plan of Correction does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding.
K0372 · Immaculate Mary Center for Rehabilitation & Healthcare (PA)
Surveyed 04/01/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

It is the practice of the facility to ensure smoke, Fire and are free from penetrations, and all residents had the potential to be affected by this deficiency. 1. The penetration above the…

View Full Plan Text
K0372 Correction Date: 05/08/2026 It is the practice of the facility to ensure smoke, Fire and are free from penetrations, and all residents had the potential to be affected by this deficiency. 1. The penetration above the 4-floor dining side smoke doors has been sealed using UL rated approved fire caulk (W-L-3001). 2. Smoke Barrier walls throughout the facility have been inspected for penetration and are free from any penetration, all residents are free from hazards and all systems are operating. 3. Education completed with Maintenance staff regarding monitoring penetrations through smoke walls and following behind vendors as work is completed to close any penetrations using approved fire caulk. 4. Every quarter for a year the Maintenance Director or designee will check random smoke walls throughout the facility to ensure they are free from penetration. This information will then be entered on a log and will be presented to the monthly QAPI meeting.
K0372 · Homestead Village, Inc. (PA)
Surveyed 03/24/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

Facility failed to maintain the fire resistance of building separating common walls as evidenced by attic access panel located within the common wall was not equipped with self-closing…

View Full Plan Text
K0372 Correction Date: 04/30/2026 Facility failed to maintain the fire resistance of building separating common walls as evidenced by attic access panel located within the common wall was not equipped with self-closing hardware. Facility construction type (Type V (000) does not require does not require self-closing hatches per NFPA 101 chapter 19. Maintenance and Renovations staff educated on the importance of ensuring all access panels are closed when not in use. Maintenance Manager or his/her designee will complete an random audit of access panels on an ongoing monthly basis to confirm closure of panels. Identification of open access panels will be addressed and closed immediately. Director of Facilities and NHA will be notified of any closure issues of access panels.
K0372 · Linwood Nursing and Rehabilitation Center (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 3 months
✓ Passed Re-Inspection Use K0372 →

The unsealed penetration above the cross-corridor doors around the 2 black wires near the nurses' station has been sealed using NFPA approved materials. There were no other penetrations near…

View Full Plan Text
K0372 Correction Date: 04/21/2026 The unsealed penetration above the cross-corridor doors around the 2 black wires near the nurses' station has been sealed using NFPA approved materials. There were no other penetrations near the nurses' station. The Director of Maintenance/designee will audit the cross-corridor wall 1x/month for 3 months to ensure a tight fire seal exists. The results of the audit will be presented to the QA committee for review and recommendations.
K0372 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

All penetrations in the first floor mechanical room, above the electrical panel in the fire pump room, and the Nursing storage room to be sealed with 5/8" sheetrock and or intumescent caulk.…

View Full Plan Text
K0372 Correction Date: 05/15/2026 All penetrations in the first floor mechanical room, above the electrical panel in the fire pump room, and the Nursing storage room to be sealed with 5/8" sheetrock and or intumescent caulk. Materials used is in accordance with ATSM #814 (UL1479) Outside contractor policy developed to ensure that any outside vendors or in house personnel seal any created penetrations to NFPA 101 standards. Quarterly inspections on fire barriers placed into Maintenance program for documentation of compliance. This will be reviewed during quarterly Quality Assurance committee meeting that includes the Executive Director/Nursing Home Administrator, Directo of Nursing, and Director of Facility Operations.
K0372 · Onyx Nursing & Rehabilitation (PA)
Surveyed 03/11/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. NHA reviewed original building blue prints to confirm complete smoke barrier walls on the first and second floor East wing near Central bathrooms, NHA/designee conducted audits of first and…

View Full Plan Text
K0372 Correction Date: 04/08/2026 Preparation and submission of this Plan of Correction does not constitute an admission or agreement with the facts alleged or conclusions stated in the Statement of Deficiencies. This Plan of Correction is submitted solely because it is required by Federal and State regulations. 1. NHA reviewed original building blue prints to confirm complete smoke barrier walls on the first and second floor East wing near Central bathrooms, NHA/designee conducted audits of first and second floor East wing smoke barrier walls near central bathroom to ensure no penetrations in smoke barrier walls no issues were identified. 2. NHA/ designee educated maintenance staff on requirements to maintain fire resistance rating of smoke barrier separations. 3. NHA/designee will audit smoke barriers weekly X4 then monthly X2 or until substantial compliance is attained. to ensure no penetrations of smoke barrier so fire and smoke rating are maintained. results will be brought to QAPI for further evaluation and recommendations.
K0372 · Juniper Village at Brookline-Rehabilitation and Skilled Care (PA)
Surveyed 03/09/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

Penetrations located on 3rd floor and 2nd floor East cross-corridor doors have been sealed. - Nursing home administrator educated Maintenance staff on smoke barrier requirements and proper…

View Full Plan Text
K0372 Correction Date: 03/30/2026 - Penetrations located on 3rd floor and 2nd floor East cross-corridor doors have been sealed. - Nursing home administrator educated Maintenance staff on smoke barrier requirements and proper repair and maintenance and sealing penetrations. - Regular rounds of the ceiling tiles and potential penetrations of smoke barriers will be conducted in order to identify and correct any penetrations needing repair. - Maintenance Director will be responsible for this process.
K0372 · Greenfield Healthcare and Rehabilitation Center (PA)
Surveyed 01/28/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. Smoke barriers have been repaired throughout the building. Ceiling tiles have been replaced on the first floor. 2. Inspection of ceilings has been placed on a monthly TELS walkthrough to be…

View Full Plan Text
K0372 Correction Date: 02/24/2026 1. Smoke barriers have been repaired throughout the building. Ceiling tiles have been replaced on the first floor. 2. Inspection of ceilings has been placed on a monthly TELS walkthrough to be done by maintenance department. 3. Quality Assurance Committee will receive a monthly report from maintenance on status of building inspections. Monitored by the Administrator.
K0372 · Fairview Rehab and Care Center (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

Smoke barrier walls to be repaired with fire caulk3M Fire Barrier Sealant CP 25WB+ and 3m fire composite sheets cs-195+ from penetrations in the following places as needed 1. Above ceiling of…

View Full Plan Text
K0372 Correction Date: 03/03/2026 K0372 Smoke barrier walls to be repaired with fire caulk3M Fire Barrier Sealant CP 25WB+ and 3m fire composite sheets cs-195+ from penetrations in the following places as needed 1. Above ceiling of the double doors by the first-floor vending machine, 2 telephone room near elevator repaired. 3. Penetration surrounding wires above the double doors that lead to the laundry on the third floor also sealed with fire caulk 3M Fire Barrier Sealant CP 25WB+. Maintenance director educated on making sure vendors are aware of using the fire clock for all future visits by Regional Maintenance Director. Facility will be monitored for any other cause or places of penetrations. Maintenance director will present any other findings at Qapi.
K0372 · Lecom at Presque Isle, Inc. (PA)
Surveyed 01/13/2026 · Spot-checks: monthly for 4 months
✓ Passed Re-Inspection Use K0372 →

All non-fitting, broken, misaligned, stained, or unsealed ceiling tiles in the kitchen, laundry, storage rooms, and corridors were replaced or properly repositioned with clips to maintain the…

View Full Plan Text
K0372 Correction Date: 03/14/2026 All non-fitting, broken, misaligned, stained, or unsealed ceiling tiles in the kitchen, laundry, storage rooms, and corridors were replaced or properly repositioned with clips to maintain the integrity of the smoke barrier by 2/13/2026. A facility-wide ceiling inspection will be conducted by 1/31/2026 to ensure all smoke barrier ceiling membranes were intact and properly sealed. Ceiling tile integrity will be added to monthly Life Safety rounds. A work order protocol requires immediate replacement of damaged ceiling tiles within 4872 hours. Staff will be re-educated by Nursing Home Administrator or designee by 1/31/2026 to report missing or displaced ceiling tiles immediately. Monthly environmental rounds documentation by Maintenance Supervisor will be reviewed quarterly by Administrator or designee for 4 months through Quality Assurance and Performance Improvement Committee. The Administrator will review the Life Safety checklist during the quarterly Quality Assurance Performance Improvement Committee meeting.
K0372 · Bethany Village Retirement Center (PA)
Surveyed 01/06/2026 · Spot-checks: monthly for 3 months
✓ Passed Re-Inspection Use K0372 →

Following discovery the unprotected penetration of the smoke barrier wall was promptly sealed using an UL approved stop gap penetration system on January 9, 2026. Administrator or designee…

View Full Plan Text
K0372 Correction Date: 02/06/2026 Following discovery the unprotected penetration of the smoke barrier wall was promptly sealed using an UL approved stop gap penetration system on January 9, 2026. Administrator or designee will continue monthly inspections for 3 months; as well as quarterly for 1 year to identify, report, and repair any additional unprotected penetration of smoke barriers. Instances discovered will be tracked and corrected. Facilities staff were educated on the necessity of checking for unprotected penetrations following the work of any contractors, as well as the importance of protecting the integrity of all smoke barriers. Results of the inspections, additional discoveries addressed, and education of staff will be included in the facility's monthly 2026 Quality Assurance and Performance Improvement (QAPI) meetings for review and approval.
K0372 · Lecom at Village Square, LLC (PA)
Surveyed 12/11/2025 · Spot-checks: weekly for 3 months
✓ Passed Re-Inspection Use K0372 →

Ceiling tile was immediately replaced upon discovery on 12/11/2025. Maintenance Director will complete an initial whole house audit for all ceiling tiles to ensure a smoke-tight ceiling and…

View Full Plan Text
K0372 Correction Date: 01/16/2026 Ceiling tile was immediately replaced upon discovery on 12/11/2025. Maintenance Director will complete an initial whole house audit for all ceiling tiles to ensure a smoke-tight ceiling and compliance by 01/02/2026. Maintenance Director or designee will complete whole house audits for all ceiling tiles each month for 3 months and quarterly for 6 months. Nursing Home Administrator will complete audits of these inspections every 6 months for one year. Results of these audits will be reviewed at the quarterly QAA meetings. Nursing Home Administrator will review the Life Safety checklist during the quarterly QAPI meeting.
K0372 · Capitol Rehabilitation and Healthcare Center (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. The multiple unprotected penetrations of the smoke barrier wall, located above the suspended ceiling within the South Dining Room, around the electrical cables, conduits and a sprinkler…

View Full Plan Text
K0372 Correction Date: 01/13/2026 1. The multiple unprotected penetrations of the smoke barrier wall, located above the suspended ceiling within the South Dining Room, around the electrical cables, conduits and a sprinkler pipe have been closed using an approved through penetration fire stop system. The facility will maintain the rating of hte smoke barrier walls. 2. The Plant Operations staff will be educated on ensuring any penetrations are sealed to maintain the rating of hte smoke barrier walls. 3. Five random audits will be completed weekly for four weeks then monthly for six months then every six months to inspect for any uncaulked penetrations. All audits will be shared with the QAPI committee for further recommendations
K0372 · Graduate Post Acute (PA)
Surveyed 11/24/2025 · Spot-checks: monthly for 3 weeks
✓ Passed Re-Inspection Use K0372 →

Smoke wall penetrations were sealed. Penetration above smoke doors outside of elevator in basement with W-L 3195. Junction box removed and replaced with 5/8" drywall on both sides of doors…

View Full Plan Text
K0372 Correction Date: 01/15/2026 Smoke wall penetrations were sealed. Penetration above smoke doors outside of elevator in basement with W-L 3195. Junction box removed and replaced with 5/8" drywall on both sides of doors near 412. Maintenance removed junction box and replaced with 5/8" drywall on both sides of double smoke doors near 204. Maintenance will remove junction box and replace with 5/8" drywall on both sides of double smoke doors near resident room Maintenance director will audit all double smoke doors to ensure junction boxes are removed and functioning properly NHA/Designee will in service maintenance director on ensuring junction boxes are removed above double doors and doors are functioning properly NHA/Designee will audit double doors to ensure no junction boxes are present and penetrations are filled. Audits will be completed three times a week for 3 weeks and 2 times monthly for 2 months. Audits will be reviewed by the QAPI committee during Quality Assurance meetings, and any variances will be addressed.
K0372 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. On 9/23/2025 The Maintenance Assistant sealed the electrical conduit penetration above the smoke barrier doors outside of the copy/admin area using an UL approved stop gap penetration…

View Full Plan Text
K0372 Correction Date: 12/29/2025 1. On 9/23/2025 The Maintenance Assistant sealed the electrical conduit penetration above the smoke barrier doors outside of the copy/admin area using an UL approved stop gap penetration system. 2. The Maintenance team inspected all smoke barrier walls for penetration. Repairs were made as needed. 3. On 10/2/2025 the NHA educated the maintenance team on maintaining the integrity of smoke barrier walls. 4. The Maintenance Director and/designee will conduct audits of smoke barrier walls to check for penetrations weekly for 4 weeks. Results of the audits will be reviewed at the QAPI meeting held monthly.
K0372 · Kingston Court Skilled Nursing and Rehabilitation Center (PA)
Surveyed 09/23/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. Cannot be retroactively corrected. The attic smoke barrier wall was fire caulked around the black wire immediately post survey. 2. All residents had the potential to be affected. 3.…

View Full Plan Text
K0372 Correction Date: 10/21/2025 1. Cannot be retroactively corrected. The attic smoke barrier wall was fire caulked around the black wire immediately post survey. 2. All residents had the potential to be affected. 3. Education will be provided to maintenance department on the requirements of K372. 4. 3 Random audits of smoke barriers will be completed weekly x 4 weeks and then monthly x 2 months. Results will be presented to QAPI committee until substantial compliance is demonstrated. 5. Date of compliance: 10/21/2025
K0372 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 08/18/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

Smoke barrier doors next to resident room,210, 417, and 410 are sealed with fire resistant sealant with approved through penetration fire stop systems. All areas have the potential to be…

View Full Plan Text
K0372 Correction Date: 10/01/2025 Smoke barrier doors next to resident room,210, 417, and 410 are sealed with fire resistant sealant with approved through penetration fire stop systems. All areas have the potential to be affected. Maintenance staff will be educated ensuring that smoke barrier walls are complete and maintain free of unsealed penetrations. Random audits will be conducted by the maintenance director or designee Monthly x2 with reports to QAPI to ensure that smoke barrier walls are complete and maintain free of unsealed penetrations.
K0372 · Jewel Healthcare and Rehabilitation Center (PA)
Surveyed 08/14/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. Unsealed Penetration over smoke doors near employee lounge has been filled. 2. Maintenance director and or designee will conduct random audits ensuring penetrations in walls are sealed . 3.…

View Full Plan Text
K0372 Correction Date: 09/25/2025 1. Unsealed Penetration over smoke doors near employee lounge has been filled. 2. Maintenance director and or designee will conduct random audits ensuring penetrations in walls are sealed . 3. Maintenance director and or designee will be educated ensuring penetrations in walls are sealed. 4. Maintenance director and or designee will conduct random weekly audits , then monthly x3 ensuring penetrations in walls are sealed per NFPA code. Findings to be discussed in qapi.
K0372 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/17/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

The two open penetrations were sealed with approved through penetration fire stop systems to seal the penetrations through the rated partition. fire-rated material. Maintenance Staff will be…

View Full Plan Text
K0372 Correction Date: 08/01/2025 The two open penetrations were sealed with approved through penetration fire stop systems to seal the penetrations through the rated partition. fire-rated material. Maintenance Staff will be re-educated on proper fire barrier sealing. The Director of Maintenance or designee will audit for compliance. Monthly audits times 3 will continue thereafter with results reported to the QA Committee by the Director of Maintenance or designee for the next three months
K0372 · Luther Crest Nursing Facility (PA)
Surveyed 06/16/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

1. Two penetrations of the smoke barrier wall, located within the exit access corridor, closest to resident resident room were corrected by the maintenance director on 06/17/2025. 2. The…

View Full Plan Text
K0372 Correction Date: 07/03/2025 1. Two penetrations of the smoke barrier wall, located within the exit access corridor, closest to resident resident room were corrected by the maintenance director on 06/17/2025. 2. The penetration of the smoke barrier wall, located within the exit access corridor, closest to the PT entrance (lower level) was corrected by the maintenance director on 06/17/2025. 3. A conduit penetration of the smoke barrier wall, located within the exit access corridor, closet to storage (lower level) was corrected by the maintenance director on 06/17/2025.
K0372 · Marywood Heights (PA)
Surveyed 05/19/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0372 →

Unsealed penetration around MC cable above ceiling to right of doors near resident resident room has been corrected. Director of Maintenance or designee will conduct random audits monthly…

View Full Plan Text
K0372 Correction Date: 05/23/2025 Unsealed penetration around MC cable above ceiling to right of doors near resident resident room has been corrected. Director of Maintenance or designee will conduct random audits monthly times 2 months to ensure areas are sealed with no penetration.