Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
K0353 · Concordia at Rp Home (PA)
Surveyed 08/17/2026 · Spot-checks: weekly for 4 weeks
1) Mongovi Fire Service to repair faulty control valve and 2 sprinklery switches on 8/28/26. Workorder on file with NHA. 2) Escutcheon Plates replaced on office area to reported locations.…
View Full Plan Text
K0353 Correction Date: 10/01/2026
1) Mongovi Fire Service to repair faulty control valve and 2 sprinklery switches on 8/28/26. Workorder on file with NHA. 2) Escutcheon Plates replaced on office area to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 3) Escutcheon Plates replaced on 3rd Floor nears front stairwell area to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 4) Escutcheon Plates replaced on foyer to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 5) All sprinkler head audited to ensure escutcheon places to ensure located in place. 6) Wires removed from the sprinkler line near resident room upon discovery. 7) Supply room on the third floor ceiling tile will be replaced to cover conduit. work order available.
8. Penetration in the electoral equipment room applied to meet requirement. Work order on file with NHA. 9_ QAPI Committee aware of citations and updates
K0353 · Graduate Post Acute (PA)
Surveyed 08/11/2026 · Spot-checks: monthly for 4 weeks
1. The required fire-pump run was completed and documented. 2. The Maintenance Director/designee audited the available fire-pump testing records for the previous 12 months. Missing…
View Full Plan Text
K0353 Correction Date: 09/23/2026
1. The required fire-pump run was completed and documented.
2. The Maintenance Director/designee audited the available fire-pump testing records for the previous 12 months. Missing documentation was identified, and the testing calendar was verified.
3. Maintenance staff were educated on the required frequency, duration, documentation, and retention of fire-pump testing records.
4. The Administrator/designee will audit fire-pump testing records monthly for three months. Missed testing or documentation will be immediately addressed. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
K0353 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
The automatic sprinkler system will be fixed before POC completion date. NHA or designee will educate maintenance director on sprinkler system requirements and routine inspections. Maintenance…
View Full Plan Text
K0353 Correction Date: 09/16/2026
The automatic sprinkler system will be fixed before POC completion date. NHA or designee will educate maintenance director on sprinkler system requirements and routine inspections. Maintenance director or designee will audit the sprinkler system and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0353 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: monthly for 4 weeks
1) Sprinkler head missing an escutcheon, in the Emergency Storage was repaired. Sprinkler assembly was below the level of the ceiling above the washer, in the Laundry Room has been repaired.…
View Full Plan Text
K0353 Correction Date: 09/15/2026
1) Sprinkler head missing an escutcheon, in the Emergency Storage was repaired. Sprinkler assembly was below the level of the ceiling above the washer, in the Laundry Room has been repaired. 2) Maintenance director to be educated in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained. 3) NHA/designee will conduct random audits monthly to ensure sprinkler heads and sprinkler assembly is maintained as required. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
K0353 · John J Kane Regional Center- Ross Township (PA)
Surveyed 07/21/2026 · Spot-checks: daily for 4 weeks
1. The three identified deficient items were corrected. Penetration in W-352 was filled and patched. Missing ceiling tile in W-250 replaced. Damaged escutcheon replaced outside supervisor…
View Full Plan Text
K0353 Correction Date: 08/14/2026
1. The three identified deficient items were corrected. Penetration in W-352 was filled and patched. Missing ceiling tile in W-250 replaced. Damaged escutcheon replaced outside supervisor office.
2. ESM or designee will audit for penetrations and damaged escutcheons throughout facility.
3. Maintenance and Housekeeping staff will be educated on identifying and reporting penetrations and damaged escutcheons.
4. ESM or designee will audit for penetrations and damaged escutcheon's during environmental rounds daily x1 business week, weekly x3 until substantial compliance is achieved.
5. Date of compliance: 8/14/2026
K0353 · John J Kane Regional Center - Glen Hazel (PA)
Surveyed 07/15/2026 · Spot-checks: weekly for 4 weeks
It is the policy of the facility to comply with NFPA 101 Life Safety Code: Sprinkler System-Maintenance and Testing. The facility had the five year obstruction completed on July 24, 2026. The…
View Full Plan Text
K0353 Correction Date: 08/13/2026
It is the policy of the facility to comply with NFPA 101 Life Safety Code: Sprinkler System-Maintenance and Testing. The facility had the five year obstruction completed on July 24,
2026. The boxes stored within 18 inches of a sprinkler head in the supply closet next to resident room were removed. The Environmental Services Manager (ESM) or designee will do routing monitoring to prevent reoccurrence.
K0353 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 07/15/2026 · Spot-checks: monthly for 4 weeks
The 5-year internal pipe and valve inspection was completed. Automatic sprinkler system components have the potential to be effected. Maintenance will be educated on maintaining automatic…
View Full Plan Text
K0353 Correction Date: 09/01/2026
The 5-year internal pipe and valve inspection was completed. Automatic sprinkler system components have the potential to be effected. Maintenance will be educated on maintaining automatic sprinkler system components. Random audits will be conducted by the Maintenance or designee to ensure automatic sprinkler system components are maintained Monthly x2 with reports to QAPI
K0353 · Delaware Valley Veterans' Home (PA)
Surveyed 07/13/2026 · Spot-checks: monthly for 4 weeks
Procurement Specialist removed items from the top shelf of the Basement Bulk Storage Room to allow for 18" clearance. Quarterly Basement Environmental Rounds were completed on Monday,…
View Full Plan Text
K0353 Correction Date: 09/11/2026
Procurement Specialist removed items from the top shelf of the Basement Bulk Storage Room to allow for 18" clearance. Quarterly Basement Environmental Rounds were completed on Monday, 07/20/2026, with no obstructions indicated. Facility Grounds Director/Designee will review and assess all storage rooms and clearly mark all walls or shelves appropriately for correct storage height limit. The Procurement specialist was reeducated by the Deputy Commandant related to clearance requirements with a focus on the 18-inch minimum clearance guideline for protected sprinkler spaces. Monthly environmental rounds checklist updated by the Facility Grounds Director/Designee to include verification of all sprinkler areas in storage rooms maintain proper clearance. Audits will be conducted by Procurement Specialist to ensure storage rooms do not contain any items beyond the appropriate height 1x/week for four (4) weeks, then 1x/month. Thereafter, quarterly Basement Environmental Rounds will include completing corrective actions within 7 days. Audit results will be reviewed in the Quality Assurance Performance Improvement (QAPI) meeting, and the Quality Assessment and Assurance (QAA) Committee will determine the need for additional audits/interventions for ongoing compliance.
K0353 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: weekly for 4 weeks
353: Sprinkler System - Maintenance and Testing: The facility failed to provide documentation verifying quarterly inspections of mechanical waterflow devices had occurred within the previous…
View Full Plan Text
K0353 Correction Date: 08/05/2026
353: Sprinkler System - Maintenance and Testing: The facility failed to provide documentation verifying quarterly inspections of mechanical waterflow devices had occurred within the previous twelve months, and to maintain the automatic sprinkler system in a continuously reliable operating condition, which serves the entire component. No residents were affected. All residents have the potential to be affected. Certified Sprinkler Vendor completed inspection of the water flow devices and supervisor switches on 10JUL2026. Facility wide visual audit of the facilities mechanical waterflow devices was completed by the Maintenance Director and documented on 17JUL2026 per regulatory requirements. The open area in the suspended ceiling of the salon was repaired by the Maintenance Director/designee on 21JUL2026. On 21JUL2026, NHA educated the Maintenance Director on the importance of maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits weekly x4 weeks then monthly x2 months, to ensure that documentation for mechanical waterflow devices meet the regulatory requirement. The Maintenance Director/Designee will conduct compliance audits weekly x4 weeks to ensure that there are no open areas in walls, then monthly x2 months and quarterly x 4 quarters. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to quarterly Quality Assurance Performance Improvement Committee for review and recommendations.
K0353 · Germantown Home (PA)
Surveyed 07/01/2026 · Spot-checks: daily for 3 months
1) In review of the annual inspection report it was identified the diesel fire pump/sprinkler system met the 100% but did not meet maximum capacity of 150%. Impact Fire was contacted and…
View Full Plan Text
K0353 Correction Date: 08/25/2026
1) In review of the annual inspection report it was identified the diesel fire pump/sprinkler system met the 100% but did not meet maximum capacity of 150%. Impact Fire was contacted and facility was referred to the Philadelphia Water Department (PWD). Impact identified it was not on the part of the facility but external factors with PWD. PWD was called and PWD has identified they have an obstructive valve box identified during inspection on July 2nd under the street and have an open ticket. Facility has informed PWD emergency department this has affected the diesel fire pump/sprinkler system and is not allowing the sprinkler system to meet the maximum of 150% capacity in case of a fire thus not meeting Life Safety NFPA standard. Facility has also informed PWD this is a nursing home with the capacity to house 180 seniors and employs 250+ staff. Systemic Changes: All Fire Sprinkler vendor reports that are due quarterly, annually, and monthly will be reviewed with the administrator to ensure recommendations are addressed timely to meet compliance and provide support for 3 months. The Maintenance Director will review monthly inspections and findings in QAPI monthly for 3 months. 2) Boxes stored with in 18 inches were removed immediately below 18 inches in central supply room. - Education will be provided Central Supply coordinator on stocking guidelines within NFPA?18 inches and safety. Systematic change: will include marking the walls to show representation of 18 inches stock level. Maintenance Director/Designee will monitor weekly for 3 months and report in QAPI monthly for three months. 3) The two gauges dated 2017 on the sprinkler riser, Ground Floor Sprinkler Riser / Fire Pump Room were identified. Sprinkler company have been scheduled to inspect the sprinkler riser/fire pump and provide updated tags after inspection. Systematic Change: Maintenance Director and Maintenance team will add the annual schedule to TELS maintenance system calendar for reminder to have annual sprinkler riser/fire pump inspection completed. Maintenance Director /Designee will report in QAPI the completion of sprinkler riser/fire pump inspection for two months. 4) Observed sprinkler cap covered with a medicine cup and it was removed immediately at time of survey. No residents or staff were affected. Systematic Changes: Maintenance Director/Designee will perform daily checks in back dining room/lounge area second floor daily for 1 month and weekly for 2 months to ensure sprinkler heads are not covered. Staff will be educated to report medicine cups obstructing sprinklers immediately to maintenance or supervisors. - Maintenance Director will report findings in QAPI for three months.
K0353 · Chapel Manor (PA)
Surveyed 06/30/2026 · Spot-checks: weekly for 4 weeks
1. A sprinkler gauge inspection has been scheduled. 2. NHA will educate the Maintenance department to ensure the automatic sprinkler system components are properly inspected and maintained. 3.…
View Full Plan Text
K0353 Correction Date: 08/12/2026
1.A sprinkler gauge inspection has been scheduled. 2.NHA will educate the Maintenance department to ensure the automatic sprinkler system components are properly inspected and maintained. 3.NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that the sprinkler system components are maintained and inspected. 4.Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0353 · Monticello House (PA)
Surveyed 06/24/2026 · Spot-checks: weekly for 4 weeks
The 5th floor elevator lobby sprinkler head will have an escutcheon installed. As a part of the Maintenance Supervisor's quarterly inspection protocol, the Facility Operations Department will…
View Full Plan Text
K0353 Correction Date: 07/20/2026
The 5th floor elevator lobby sprinkler head will have an escutcheon installed. As a part of the Maintenance Supervisor's quarterly inspection protocol, the Facility Operations Department will inspect all sprinkler heads to ensure escutcheons are in place where applicable. Those found without escutcheons in place will be addressed accordingly. Director of Facility Operations and/or delegate will report areas of concerns, findings, and corrections to the Quality Assurance Performance Improvement (QAPI) Committee for the next two quarters. Disclaimer: Preparation and/or execution of this entire Plan of Correction does not constitute admission or agreement by the Provider of the truth of the facts alleged or conclusion set forth in this Statement of Deficiencies. The entire Plan of Correction is prepared and/or executed solely because it is required by the provisions of Federal and State laws.
K0353 · Phoebe Allentown Health Care Center (PA)
Surveyed 06/23/2026 · Spot-checks: monthly for 4 weeks
1. Penetrations were sealed on 06/23/26. Educate staff on the correct procedures and usage of fire stopping to be completed by 08/03/2026. Perform monthly rounds for a quarter to make sure we…
View Full Plan Text
K0353 Correction Date: 08/03/2026
1. Penetrations were sealed on 06/23/26. Educate staff on the correct procedures and usage of fire stopping to be completed by 08/03/2026. Perform monthly rounds for a quarter to make sure we are compliant and report out on our findings in our monthly QAPI meeting.
2. Scheduled all sprinkler and suppression servicing and inspections with Comunale Fire systems on 4/17/26, PO#33210. We will audit this on a quarterly basis for the next quarter to make sure we are compliant with the inspections needed.
K0353 · Yorkview Nursing and Rehabilitation (PA)
Surveyed 06/09/2026 · Spot-checks: weekly for 4 weeks
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is…
View Full Plan Text
K0353 Correction Date: 07/24/2026
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is prepared and/or executed by provision of Federal or State Law.
1. Various wires identified in F West Wing and F East wing above the ceiling that were supported by the sprinkler piping system were removed.
2. Additional sprinkler heads in building 2 will be observed to ensure they are free from extraneous weight.
3. Maintenance Department will be educated by NHA to audit the area for items laying on the sprinkler pipes after above ceiling work is completed.
4. The Maintenance Director/designee will audit sprinkler heads in the facility to ensure they are free from obstruction weekly for 4 weeks. Trends will be reported to the QAPI committee for further action planning.
5. Date of compliance: 7/24/26
K0353 · Holy Family Manor (PA)
Surveyed 06/08/2026 · Spot-checks: weekly for 4 weeks
1. The unsealed penetrations have been sealed by the Maintenance Department. 2. Maintenance Director/Designee will conduct random audits to ensure all penetrations within the facility are…
View Full Plan Text
K0353 Correction Date: 07/31/2026
1. The unsealed penetrations have been sealed by the Maintenance Department.
2. Maintenance Director/Designee will conduct random audits to ensure all penetrations within the facility are sealed. Findings will be reported during our QAPI meeting.
K0353 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/01/2026 · Spot-checks: monthly for 4 weeks
1. The pump control valve has been repaired. The 6 inch OS&Y has been replaced. TheVK442 4 sidewall heads and VK302 4 pendant heads, VK 300 4-uprights received the 25 year testing. The 3…
View Full Plan Text
K0353 Correction Date: 07/31/2026
1.The pump control valve has been repaired. The 6 inch OS&Y has been replaced. TheVK442 4 sidewall heads and VK302 4 pendant heads, VK 300 4-uprights received the 25 year testing. The 3 dryheads were replaced (16.5", 14.5" and 22"). The 3 sidewall heads on the 4th floor dining room were replaced. 2.To ensure that no other pump control valve repairs are required, the maintenance director has inspected similar areas and noted no further infractions. To ensure there are no other sprinklers that need repair or replacement, the maintenance director inspected all sprinklers. Any sprinklers identified as needing repair or replacement were addressed immediately. The 25 year sprinkler testing has been completed.
3. The Maintenance Director has been educated on the regulations for proper maintenance of the pump control valves and sprinklers.
4. To prevent recurrence, the pump control valves and sprinklers will be inspected monthly X 3 months. The results will be reviewed monthly at QAPI. Date of compliance is July 31, 2026.
K0353 · Quality Life Services - New Castle (PA)
Surveyed 05/27/2026 · Spot-checks: weekly for 4 weeks
Maintenance Director educated on maintaining the fire sprinkler system. Maintenance Director or designee will audit Sprinkler system reports after receipt to ensure work orders completed…
View Full Plan Text
K0353 Correction Date: 07/14/2026
Maintenance Director educated on maintaining the fire sprinkler system. Maintenance Director or designee will audit Sprinkler system reports after receipt to ensure work orders completed timely. Johnson Controls is scheduled to come to facility 06/18/2026 to complete documented work order. Audits will be brought to Quality Assurance Performance Improvement meeting.
K0353 · Embassy of Scranton (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
The ceiling tile in the second-floor clean linen room has been replaced. The Maintenance Director/designee will audit random automatic sprinklers in the facility weekly x 4, then monthly to…
View Full Plan Text
K0353 Correction Date: 06/30/2026
The ceiling tile in the second-floor clean linen room has been replaced. The Maintenance Director/designee will audit random automatic sprinklers in the facility weekly x 4, then monthly to ensure ceiling tiles are in place as required. These audits will be brought to the monthly QAPI committee meeting for further review and recommendations.
K0353 · Luther Crest Nursing Facility (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 4 weeks
1. The items located within eighteen inches of an adjacent sprinkler head assembly in the Central supply closet were corrected by the maintenance director on 5/19/2026. 2. Central supplies…
View Full Plan Text
K0353 Correction Date: 06/05/2026
1. The items located within eighteen inches of an adjacent sprinkler head assembly in the Central supply closet were corrected by the maintenance director on 5/19/2026.
2. Central supplies staff was educated on the storage of the items within proper distance from the sprinkler head assembly.
3. Maintenance staff have marked the eighteen-inch line in all of central supply area walls to remain compliant by making a visual level for storage.
4. Maintenance director/ designee will inspect the central supply area weekly x 4 weeks and then monthly x 2 months.
K0353 · Lancaster Nursing and Rehabilitation Center (PA)
Surveyed 05/13/2026 · Spot-checks: weekly for 4 weeks
Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the…
View Full Plan Text
K0353 Correction Date: 07/02/2026
Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of Federal and State Law. The plan of correction represents the facility's credible allegation of compliance. K 0353 NFPA 101 sprinkler System Maintenance and testing
1. The wires over the sprinkler pipes were removed.
2. The maintenance director or designee will provide re-education to the facility maintenance team that nothing can be laying on the sprinkler pipes.
3. Maintenance director will complete random audits in random locations of units weekly for 4 weeks and then monthly for 2 months to ensure that the sprinkler pipes are free of anything laying on them.
4. Findings of the audit will be reported to the facility quality assurance performance improvement committee to determine the need for additional actions and or monitoring.
K0353 · Southmont of Presbyterian Seniorcare (PA)
Surveyed 05/13/2026 · Spot-checks: weekly for 4 weeks
The facility immediately cleaned the five sprinkler heads on the East Wing near the elevator lobby. Maintenance Director will educate maintenance staff that sprinkler heads cannot be…
View Full Plan Text
K0353 Correction Date: 06/15/2026
The facility immediately cleaned the five sprinkler heads on the East Wing near the elevator lobby. Maintenance Director will educate maintenance staff that sprinkler heads cannot be dirty/dusty. Maintenance Director or designee will audit five sprinkler heads once a month for the next three months and report his findings to the QA committee. The facility immediately removed the MC conduit from the sprinkler branch line near the ceiling in resident room. Maintenance Director will reeducate maintenance staff that no wires can be supported or in contact with sprinkler branch lines. Maintenance Director or designee will audit one location for any wires on sprinkler branch line once a month for the next three months and report his findings to the QA committee.
K0353 · Rose City Nursing and Rehab at Lancaster (PA)
Surveyed 05/06/2026 · Spot-checks: weekly for 4 weeks
1. The various wires that were laying across the sprinkler pipes at (a) 4th floor above ceiling by front stair tower, (b) 3rd floor above ceiling near resident room, (c) 2nd floor above…
View Full Plan Text
K0353 Correction Date: 06/30/2026
1. The various wires that were laying across the sprinkler pipes at (a) 4th floor above ceiling by front stair tower, (b) 3rd floor above ceiling near resident room, (c) 2nd floor above ceiling front stair tower, and (d) 1st floor above ceiling near resident room were secured off sprinkler pipes
2. Maintenance Director, or designee, will perform random location audits weekly x 2, then monthly x 2, then monthly ongoing to ensure no wires are laying on the sprinkler pipes. Audits will be submitted to monthly QAPI for review and recommendations.
K0353 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
1. a) The missing escutcheon plate and ceiling tile within D6 rear Solarium were installed. Facility staff will monitor all sprinkler escutcheons on a monthly basis for 3 months. Any…
View Full Plan Text
K0353 Correction Date: 06/09/2026
1. a) The missing escutcheon plate and ceiling tile within D6 rear Solarium were installed. Facility staff will monitor all sprinkler escutcheons on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee. b) All stored items within eighteen inches of the sprinkler head assembly in B2 Custodian Room were removed. The facility staff will be educated and will monitor to ensure the required distance between sprinkler head assembly and stored items are maintained on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee. c) The missing escutcheon plate and ceiling tile within D2 Resident resident room was installed. Facility staff will monitor all sprinkler escutcheons on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0353 · Riverstreet Manor (PA)
Surveyed 04/27/2026 · Spot-checks: weekly for 4 weeks
Facility signed contract and five- year obstruction and gauge replacement will be performed on May 11, 2026. All future inspections will be monitored through TELS work order system and…
View Full Plan Text
K0353 Correction Date: 06/26/2026
Facility signed contract and five- year obstruction and gauge replacement will be performed on May 11,
2026. All future inspections will be monitored through TELS work order system and documentation will be filed in Life Safety binder.
K0353 · Redstone Highlands Health Care Ctr (PA)
Surveyed 04/22/2026 · Spot-checks: monthly for 4 weeks
Fire caulking was immediately installed to fill the 4-inch hole, and the coax cables were sealed in the 1st floor Clean Utility Room to prevent the passage of heat and smoke. A full sweep of…
View Full Plan Text
K0353 Correction Date: 05/19/2026
Fire caulking was immediately installed to fill the 4-inch hole, and the coax cables were sealed in the 1st floor Clean Utility Room to prevent the passage of heat and smoke. A full sweep of all other smoke compartments was completed, and issues identified were addressed at the time of discovery. All maintenance staff were re-educated regarding K-Tag
353. Facility Support Manager or designee will complete audits of smoke compartments 1x per week for 4 weeks and then monthly for 3 months to ensure continued compliance. Any issues identified will be corrected at the time of discovery.