SA SurveyAnchor

Past Winning Plans

Real state-approved Plans of Correction and their spot-check schedules.

Browse State Guides →
Clear
K0324 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1. Semi-annual kitchen exhaust ductwork cleaning was completed as required on January 29th, 2026 and July 28th, 2026. 2. Proper documentation indicating the required cleaning has been added to…

View Full Plan Text
K0324 Correction Date: 09/30/2026 1. Semi-annual kitchen exhaust ductwork cleaning was completed as required on January 29th, 2026 and July 28th, 2026. 2. Proper documentation indicating the required cleaning has been added to the Annual Life Safety Documentation book. 3. Director of Environmental Services or designee will audit the kitchen exhaust ductwork cleaning documentation semi-annually for 1 year to ensure it has been completed. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0324 · Forestview (PA)
Surveyed 08/18/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

The monthly observation inspection for the kitchen hood system has been completed 8-24-2026 and added to the preventative maintenance task. The supervisor will re-educate the techs and inspect…

View Full Plan Text
K0324 Correction Date: 08/24/2026 The monthly observation inspection for the kitchen hood system has been completed 8-24-2026 and added to the preventative maintenance task. The supervisor will re-educate the techs and inspect their work each month
K0324 · Graduate Post Acute (PA)
Surveyed 08/11/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1. Facility completed a clean kitchen suppression system report. Updated documentation confirming the system's compliant condition was obtained and placed in the Life Safety binder. 2. The…

View Full Plan Text
K0324 Correction Date: 09/23/2026 1.Facility completed a clean kitchen suppression system report. Updated documentation confirming the system's compliant condition was obtained and placed in the Life Safety binder. 2.The Maintenance Director/designee reviewed all kitchen suppression inspection, testing, maintenance, and repair records. Unresolved deficiencies and missing documentation were identified and corrected. 3.Maintenance staff were educated on reviewing vendor reports, tracking deficiencies through completion, and maintaining final corrective-action documentation. 4.The Maintenance Director/designee will audit the Life Safety binder and Kitchen Suppression Inspections monthly for three months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
K0324 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1) Annual kitchen hood cleaning was completed on 7/27/26. . Documentation was placed in life safety book. 2) Maintenance director to be educated on maintaining paperwork of completed…

View Full Plan Text
K0324 Correction Date: 09/15/2026 1) Annual kitchen hood cleaning was completed on 7/27/26. . Documentation was placed in life safety book. 2) Maintenance director to be educated on maintaining paperwork of completed regulatory requirements. 3) NHA/designee will audit life safety books for required regulatory documentation semi-annually. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations
K0324 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

0324: Cooking Facilities: The facility failed to provide documentation verifying semi-annual cleanings of kitchen exhaust ductwork and monthly inspections of the kitchen fixed fire suppression…

View Full Plan Text
K0324 Correction Date: 08/05/2026 0324: Cooking Facilities: The facility failed to provide documentation verifying semi-annual cleanings of kitchen exhaust ductwork and monthly inspections of the kitchen fixed fire suppression system had been performed within the previous twelve months, affecting one of seven smoke compartments within the component. No residents were affected by this deficient practice. All residents have the potential to be affected. Maintenance Director confirmed certified vendor to perform semi-annual cleaning and inspection of kitchen exhaust ductwork and kitchen fixed fire suppression system prior to 05AUG2026. On 21JUL2026, NHA educated the Maintenance Director on the importance of maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits monthly x six months, to ensure that documentation verifying semi-annual cleanings of kitchen exhaust ductwork and kitchen fixed fire suppression system inspection meet the requirement per regulation. NHA/Designee will Life Safety Binder with Maintenance Director to ensure compliance semi-annual inspection and cleaning schedule. Results will be submitted to the quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
K0324 · Germantown Home (PA)
Surveyed 07/01/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

The Maintenance Director and Food & Nutrition Director/ Designee will review the preventive maintenance schedule monthly to verify that all required inspections, testing, for required…

View Full Plan Text
K0324 Correction Date: 08/25/2026 The Maintenance Director and Food & Nutrition Director/ Designee will review the preventive maintenance schedule monthly to verify that all required inspections, testing, for required semiannual kitchen exhaust hood cleaning is current and supportive documentation is in place. The Maintenance Director will implement a preventive maintenance schedule that includes the required semiannual kitchen exhaust hood cleaning. A tracking log and TELS calendar reminder will be maintained to ensure cleanings are scheduled and completed within the required timeframes. Education with Maintenance Director and Food & Nutrition Director on Kitchen Hood Cleaning schedule compliance will be done. Maintenance Director will report on semi-annual inspections for 2 QAPI meetings reflective of semi-annual kitchen hood cleanings.
K0324 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

A certified hydrostatic test was conducted and documented for the Class K kitchen hood suppression cylinder. - The Maintenance Director was re-educated on tracking hood suppression reports and…

View Full Plan Text
K0324 Correction Date: 07/20/2026 - A certified hydrostatic test was conducted and documented for the Class K kitchen hood suppression cylinder. - The Maintenance Director was re-educated on tracking hood suppression reports and resolving listed deficiencies immediately. - The Director of Maintenance or designee will review vendor compliance schedules monthly. Monthly audits times 3 will continue with results reported to the QA Committee.
K0324 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/01/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1. The mesh filters for the kitchen exhaust hood suppression system have been ordered and will be installed by the vendor. 2 & 3. There are no other kitchen exhaust hood suppression systems in…

View Full Plan Text
K0324 Correction Date: 07/31/2026 1. The mesh filters for the kitchen exhaust hood suppression system have been ordered and will be installed by the vendor. 2 & 3. There are no other kitchen exhaust hood suppression systems in the facility. The Maintenance Director and staff have been educated on the requirement to have the kitchen exhaust hood suppression system inspected and repaired to maintain safe function. 4. To prevent recurrence, the kitchen exhaust hood suppression system will be inspected weekly by the Maintenance Director to ensure safe functioning until repairs are made by the vendor and are complete. Results will be reviewed monthly at QAPI. 5. Date of compliance is 7/31/2026.
K0324 · Quality Life Services - New Castle (PA)
Surveyed 05/27/2026 · Spot-checks: monthly for 2 months
✓ Passed Re-Inspection Use K0324 →

Kitchen suppression system was inspected 05/27/2026. Maintenance Director educated on NFPA 96 Audits will be completed by Maintenance Director or designee monthly times 2 for 2 months. Results…

View Full Plan Text
K0324 Correction Date: 07/16/2026 Kitchen suppression system was inspected 05/27/2026. Maintenance Director educated on NFPA 96 Audits will be completed by Maintenance Director or designee monthly times 2 for 2 months. Results will be brought to Quality Assurance Performance Improvement Committee.
K0324 · The Gardens at Easton (PA)
Surveyed 05/21/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

NFPA 101 Cooking Facilities 1. Kitchen hood baffles ordered for replacement of loose kitchen hood baffles. 7 new baffles to be replaced. 2. Education done with Maintenance department- Kitchen…

View Full Plan Text
K0324 Correction Date: 06/29/2026 K 0324- NFPA 101 Cooking Facilities 1. Kitchen hood baffles ordered for replacement of loose kitchen hood baffles. 7 new baffles to be replaced. 2. Education done with Maintenance department- Kitchen hood baffles should be tight fitting and replaced if found not tight fitting. 3. Weekly audits of kitchen hood baffles to be done x4 weeks then monthly x2 months to ensure proper tight fit. 4. Report findings to QAPI
K0324 · Abbeyville Skilled Nursing and Rehabilitation Center (PA)
Surveyed 03/17/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1. Education provided to maintenance department on requirements of K324 and related documentation. Quick check of fixed chemical fire suppression completed . Semi annual maintenance and…

View Full Plan Text
K0324 Correction Date: 05/13/2026 1. Education provided to maintenance department on requirements of K324 and related documentation. Quick check of fixed chemical fire suppression completed . Semi annual maintenance and testing of fixed chemical fire suppression will be completed. 2. Audits to ensure required testing is completed will be done monthly x 3 months and quarterly thereafter for monthly quick checks. Additionally, audit to be completed monthly x 6 months to ensure that the semi annual maintenance and testing of fixed system is complete and all reports received and filed and next inspection scheduled. 3. Results of audits will be presented to QAPI committee until substantial compliance is demonstrated. 4. Date of compliance 5/13/2026
K0324 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Proposal signed on 2/20/2026 to have the RG-6 Range Guard Tank replaced by Wesley Enhanced Living's Fire Safety vendor. Proper documentation procured stating replacement, and inspection of…

View Full Plan Text
K0324 Correction Date: 05/15/2026 Proposal signed on 2/20/2026 to have the RG-6 Range Guard Tank replaced by Wesley Enhanced Living's Fire Safety vendor. Proper documentation procured stating replacement, and inspection of tank is completed by 5/5/2026. Monitored by the Director of Facility Operations during semi-annual inspections of the kitchen fire suppression system. This will be reviewed during quarterly Quality Assurance committee meeting that includes the Executive Director/Nursing Home Administrator, Director of Nursing, and Director of Facility Operations.
K0324 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

The required kitchen fire suppression system inspection and kitchen hood cleaning were completed by qualified vendors, and documentation has been maintained on-site. A tracking system has been…

View Full Plan Text
K0324 Correction Date: 04/27/2026 the required kitchen fire suppression system inspection and kitchen hood cleaning were completed by qualified vendors, and documentation has been maintained on-site. A tracking system has been implemented to ensure all semi-annual inspections and cleanings are completed timely. The Maintenance Director or designee will monitor compliance by reviewing service records and schedules to ensure ongoing compliance.
K0324 · Accela Rehab and Care Center at Somerton (PA)
Surveyed 02/24/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies.…

View Full Plan Text
K0324 Correction Date: 04/21/2026 Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed with federal and state law requirements. Identification of other residents or areas having the potential to be affected due to the nature of the deficiency: The deficient practice has the potential to affect all residents. Corrective action 1.Ansul extinguishing system was inspected and provider educated on completing quick check tag 2.Maintenance director or designee to re-educate maintenance staff on the importance of maintaining documentation for the kitchen Ansul extinguishing system monthly quick check 3.Maintenance director or designee to audit kitchen Ansul extinguishing system monthly quick check. Weekly X4 monthly x2 4.Results will be reviewed at the quarterly QAPI meeting.
K0324 · Fairview Rehab and Care Center (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

The kitchen hoods suppression system to have scheduled semiannual cleaning report done. Maintenance director to set up and audit future visits that they occur timely. Maintenance director…

View Full Plan Text
K0324 Correction Date: 03/03/2026 K0324 The kitchen hoods suppression system to have scheduled semiannual cleaning report done. Maintenance director to set up and audit future visits that they occur timely. Maintenance director educated on timely requirements by Regional Maintenance director. Maintenance Director to present update on report at QAPI.
K0324 · The Williamsport Home (PA)
Surveyed 01/05/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1) The deficient practice could not be corrected. A hood cleaning schedule has been scheduled with the contractor with an annual schedule to ensure ongoing compliance. A cleaning is scheduled…

View Full Plan Text
K0324 Correction Date: 02/10/2026 1) The deficient practice could not be corrected. A hood cleaning schedule has been scheduled with the contractor with an annual schedule to ensure ongoing compliance. A cleaning is scheduled for February 2) The Maintenance will review documentation to ensure the exhaust cleaning is occurring per the schedule and regulation. 3) The results will be reviewed at the Quality Assurance meeting to ensure documentation compliance is noted.
K0324 · Heritage Care Center (PA)
Surveyed 11/25/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1. Corrective Action for Residents Affected The facility has ordered and will install a NFPA 96-compliant restraint system ensuring the unit cannot be moved away from the hood or gas…

View Full Plan Text
K0324 Correction Date: 01/20/2026 1. Corrective Action for Residents Affected The facility has ordered and will install a NFPA 96-compliant restraint system ensuring the unit cannot be moved away from the hood or gas connection. 2. Identification of Other Residents Potentially Affected All residents could be potentially affected by non-compliant commercial cooking equipment. A complete inspection of all kitchen appliances was completed and no other unsecured or improperly aligned appliances were identified. 3. Systemic Changes The facility will include monthly verification that all gas-fired or movable commercial cooking appliances are properly tethered and aligned under hood suppression systems. The Maintenance Director and Dietary Manager were re-educated on NFPA 96 requirements, equipment tethering, and documentation procedures. 4. Monitoring / QA The Maintenance Director or designee will audit the kitchen hood area weekly for four weeks, then monthly for six months. Findings will be documented on the "Kitchen Appliance Alignment Audit Tool" and reviewed monthly by the Safety Committee and quarterly by QAPI. Continued non-compliance will result in retraining.
K0324 · Ivory Nursing & Rehabilitation (PA)
Surveyed 11/24/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

On 12/9/2025 the hood cleaning company performed the semi-annual hood cleaning. The mechanical company has performed the semi-annual inspection on the kitchen suppression system on 12/19/2025.…

View Full Plan Text
K0324 Correction Date: 12/30/2025 On 12/9/2025 the hood cleaning company performed the semi-annual hood cleaning. The mechanical company has performed the semi-annual inspection on the kitchen suppression system on 12/19/2025. The facility has also signed the proposal to relocate the fire pull station in the dish room. On 5/27/25 the mechanical company performed the repairs as stated: a) System Cylinder that was due for hydrostatic testing or replacement. b) System Cartridge that was due for replacement c) Pipe Integrity. d) SVA (System Valve Actuator) replaced. Paperwork was obtained indicating the aforementioned repairs. All residents may be affected by this deficient practice. The maintenance director or designee will audit the facility required inspections monthly x 3 months to ensure inspections and repairs are done timely and the paperwork is available for viewing. Findings of these audits will be presented at the facility's QAPI meeting. It will be determined at that time if continued audits are necessary.
K0324 · Twin Lakes Rehabilitation and Healthcare Center (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Gas fired range was secured with a chain to ensure the appliance returned to an approved design location after cleaning. Maintenance director was re-educated by Administrator on regulatory…

View Full Plan Text
K0324 Correction Date: 01/07/2026 Gas fired range was secured with a chain to ensure the appliance returned to an approved design location after cleaning. Maintenance director was re-educated by Administrator on regulatory requirements regarding securing of appliances. An audit will be conducted by maintenance director or designee on 2 appliances weekly times for four weeks and monthly times two months to ensure movable appliances are returned to their designed location. Results of the audit will be reviewed in QAPI.
K0324 · Harborview Rehabilitation and Care Center at Doylestown (PA)
Surveyed 10/20/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

1- Going forward, the facility will ensure that the hood cleaning vendor will perform and document the required bi-annual cleaning of the kitchen exhaust system. 2-Maintenance and Dietary…

View Full Plan Text
K0324 Correction Date: 11/26/2025 1- Going forward, the facility will ensure that the hood cleaning vendor will perform and document the required bi-annual cleaning of the kitchen exhaust system. 2-Maintenance and Dietary staff were re-educated on NFPA 96 requirements and maintaining cleaning documentation. 3-Maintenance Director /designee will conduct audits of cleaning logs to ensure compliance with required frequency. 4-All results will be reported to the QAPI Committee.
K0324 · Lecom at Asbury Ridge DBA Saint Mary's Asbury Ridge (PA)
Surveyed 09/17/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Dietary staff member involved in deficiency with uncertainty of the location and operation of the hood fire suppression system's manual activation was counseled on 09/17/2025 by the…

View Full Plan Text
K0324 Correction Date: 11/10/2025 Dietary staff member involved in deficiency with uncertainty of the location and operation of the hood fire suppression system's manual activation was counseled on 09/17/2025 by the Maintenance Supervisor and the Nursing Home Administrator. 09/17/2025 All Dietary staff members will be educated on use, location and operation of the hood fire suppression system's manual activation by the Maintenance Supervisor and or the Director of Dietary. 10/31/2025 The Maintenance Supervisor and or designee will complete a Quality Assurance monitor to assure that dietary staff are accurately educated on the hood fire suppression system's manual activation. 10/31/2025 The Quality Assurance monitor will be completed monthly on random employees (a minimum of 4 employees a month). If the Quality Assurance monitor reflects 100% compliance for three consecutive months, then the monitor will be completed on a quarterly basis. 10/31/2025
K0324 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 08/26/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of facts alleged or conclusions set forth in the statement of…

View Full Plan Text
K0324 Correction Date: 10/01/2025 Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared solely because the provisions of state and Federal law require it. 1. Documentation was located for the bi-annual hood inspection. The inspection occurred on October 14, 2024. Documentation was put into the Life Safety book maintained by maintenance. 2. Maintenance Director was educated on maintaining paperwork of completed regulatory requirements. 3. Administrator/designee will audit the Life survey book for required regulatory documentation semi-annually. 4. A summary of the audit findings will be submitted to the QA Committee for recommendations.
K0324 · Sanatoga Center (PA)
Surveyed 07/30/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Kitchen exhaust hood/duct cleaned on 8/12/2025 by Cintas Documentation sent to surveyor and placed in life safety binder Maintenance Director and kitchen staff will be in-serviced on K0324…

View Full Plan Text
K0324 Correction Date: 09/18/2025 Kitchen exhaust hood/duct cleaned on 8/12/2025 by Cintas Documentation sent to surveyor and placed in life safety binder Maintenance Director and kitchen staff will be in-serviced on K0324 with focus on the importance of ensuring deficiencies noted on the inspection report are followed up on and corrected and location of fire suppression system manual pull station. Maintenance director will also be educated on continued cleaning schedule of the kitchen exhaust hood/duct. Education to be completed by the NHA/Designee. Monthly audits X 4 to be completed to ensure kitchen exhaust hood/duct is clean. Maintenance Director/ Designee will report findings of the inspection report to the QAPI meeting.
K0324 · Delaware Valley Veterans' Home (PA)
Surveyed 07/28/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

The kitchen hood suppression system recommendations for the Cartridge LT20R and cylinder R102 3G hydrotest had been scheduled on July 7th to be completed on July 30 2025. Hydrotest was…

View Full Plan Text
K0324 Correction Date: 09/22/2025 The kitchen hood suppression system recommendations for the Cartridge LT20R and cylinder R102 3G hydrotest had been scheduled on July 7th to be completed on July 30 2025. Hydrotest was completed on July 30th. Moving forward the Maintenance Director will continue to review the semi-annual kitchen suppression inspection report and schedule the vendor to fix any deficiencies found during the semi annual inspections. The results of the audit will be reviewed at the Quality Assurance & Performance Improvement meetings. The Quality Assurance Committee will determine the need for additional audits/ interventions for ongoing compliance.
K0324 · Sunnyview Nursing and Rehabilitation Center (PA)
Surveyed 07/24/2025 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0324 →

Hold an education for all staff in the dietary department. Topics will be fire safety and fire suppression system. Monthly audit will be held to ensure all staff has had education and any new…

View Full Plan Text
K0324 Correction Date: 09/07/2025 Hold an education for all staff in the dietary department. Topics will be fire safety and fire suppression system. Monthly audit will be held to ensure all staff has had education and any new staff to the department Results of the audit will be brought to the monthly meeting and added to the minutes to ensure compliance and further need for education.