F0689 · Heritage Care Center (PA)
Surveyed 08/13/2026 · Spot-checks: weekly for 4 weeks
1. Areas identified in 2567 discarded and secured. No negative outcome to residents found. 2. A whole house audit to identify any other areas of risk including open chemicals/unsecured O2…
View Full Plan Text
F0689 Correction Date: 09/16/2026
1. Areas identified in 2567 discarded and secured. No negative outcome to residents found.
2. A whole house audit to identify any other areas of risk including open chemicals/unsecured O2 tanks/janitor closet doors will be conducted by NHA or designee.
3. Education on accidents/hazards will be conducted to nursing and housekeeping staff. This will be provided by NHA/designee.
4. Weekly audits of accidents/hazardous materials will be conducted weekly x 3 weeks, monthly x 2 months.
5. Results of audits will be submitted to QA for review.
F0689 · Wyomissing Health and Rehabilitation Center (PA)
Surveyed 07/23/2026 · Spot-checks: daily for 4 weeks
1) Resident 1 did not suffer any ill effects from the deficient practice. 2) To identify other residents who have the potential to be affected, an audit of Elopement Assessments was conducted…
View Full Plan Text
F0689 Correction Date: 08/04/2026
1) Resident 1 did not suffer any ill effects from the deficient practice. 2) To identify other residents who have the potential to be affected, an audit of Elopement Assessments was conducted by the DON to identify residents who have been recognized with the potential for elopement/wandering. 3) To prevent from this repeating, the DON/designee will complete education with nursing personnel on requirements for accurately completing the Elopement Assessment, incident investigation, and ensuring all residents at risk are adequately supervised throughout the shift. 4) To monitor ongoing compliance, DON/designee will audit new residents for accurate Elopement Assessments, ensure elopement investigation is completed if necessary, and ensure at risk residents are adequately supervised throughout the shift daily x5, weekly x4, monthly x2. Findings we be reviewed at QAPI to endure effectiveness of plan of correction.
F0689 · Burgh Care Center (PA)
Surveyed 07/09/2026 · Spot-checks: weekly for 4 weeks
1. Interim Leave of Absence/Out on Pass Policy implemented on 07/6/2026, suspending all prior Leave of Absence/pass practice facility wide. 2. All residents who have standing Leave of Absence…
View Full Plan Text
F0689 Correction Date: 07/31/2026
1. Interim Leave of Absence/Out on Pass Policy implemented on 07/6/2026, suspending all prior Leave of Absence/pass practice facility wide.
2. All residents who have standing Leave of Absence orders with supervision have the potential to be affected. Review of all residents with unsupervised Leave of Absence order completed.
3. Interim Leave of Absence policy will become permanent effective 7/23/2026. All staff, residents and responsible parties will educated on this.
4. Ongoing 12 week audit will continue (began 7/7/2026) covering new admissions, residents with Leave of Absence orders, and any resident with a change of condition or significant event, with findings reported to the Quality Assurance Improvement Committee. The facility's direct in-service training will be conducted by Masters Crafted in Healthcare. The training is titled "F-689 Accidents, Burgh Care Center" and will be conducted at the facility on 7/31/2026.
F0689 · Hempfield Manor (PA)
Surveyed 06/30/2026 · Spot-checks: weekly for 4 weeks
The resident was assessed by RN for injury and change in condition by Assist Director of Nursing on 6/12/26. The resident was not harmed and alert and oriented. MD and family made aware of…
View Full Plan Text
F0689 Correction Date: 07/09/2026
The resident was assessed by RN for injury and change in condition by Assist Director of Nursing on 6/12/26. The resident was not harmed and alert and oriented. MD and family made aware of elopement. MD ordered therapy evaluation Psych evaluation and Med review which have been completed. Resident was ordered Secure Care Device and removed resident from power wheelchair until therapy could evaluate, Standard wheelchair put in place. All recommendations are put into place. Assessments completed for skin, BIMs, Elopement, and Nursing Physical Device by RN on 6/12/26. Therapy evaluation completed for motorized wheelchair on 6/16/26 by Therapy Manger. Resident's plan of care updated with all findings and appropriate interventions. Care plan meeting was held and reviewed with family and IDT team on 6/17/26. Immediately following elopement-all residents were accounted for by the completion of a head count and elopement drill on 6/12/26 by Assist Director of Nursing at 7:45pm. Elopement binder and photos of residents at risk for elopement updated immediately following elopement by ADON on 6/12/26. Elopement evaluation assessment and Care plans were completed on all residents on or before 6/30/26 at 9:00am by the Interdisciplinary Team to ensure all residents were evaluated for elopement risk, and appropriate interventions were in place. Re-admission elopement assessments reviewed by IDT team during Clinical report meeting following elopement on 6/12/26 and ongoing to ensure accuracy with orders and assessments. IDT team will review Behaviors during clinical report on-going, and Activities Director will update Elopement Binders as needed. Education to registered nurses for accuracy in elopement assessment completion completed by Nursing Home Administrator or designee by 6/30/26 at 11 :25am. Elopement drills were conducted weekly x 1 week all 3 shifts by Environmental Service Supervisor by 6/25/26 at 7:00am. Elopement drills will be completed monthly thereafter by ESS. All staff Educated on elopement policy by Director of Nursing or Designee on 6/30/26 by 4pm. Directed In-service imposed by state agency will be completed by Masters Crafted in Healthcare titled Elopement for Hempfield Manor. Presentation present to local DOH-approved on 7/8. Audits completed to ensure Elopement Drills were completed weekly x 1 weeks by NHA or designee before 6/30/26 at 9:00am, monthly audits thereafter x 6 months. Audit results of audits will be presented and reviewed during QAPI meetings. Date of Compliance 7/9
F0689 · Transitions Healthcare Washington PA (PA)
Surveyed 06/22/2026 · Spot-checks: weekly for 4 weeks
1. Resident R 1 was treated at the facility per Son's request. Resident R 1 Point of Care task bar was checked and has the correct transfer status for the C.N.A. to follow. The C.N.A.…
View Full Plan Text
F0689 Correction Date: 07/21/2026
1. Resident R 1 was treated at the facility per Son's request. Resident R 1 Point of Care task bar was checked and has the correct transfer status for the C.N.A. to follow. The C.N.A. assignment sheet had the correct transfer status. The resident care plan was updated on 6/1/26 to reflect new physician orders: Transfer as per MD order, resident will not be transferred out of bed due to right femur fracture. Resident will be reassessed by therapy services once the fracture is healed. Care plan was checked for bed mobility, and was correct, dated 3/4/26 Bed mobility: The resident requires extensive assistance by 2 staff to turn and reposition in bed.
2. Audit of incident reports back 60 days was completed and there have been no other residents with injury from not following the plan of care. Employee 1 was an agency employee. The Agency was notified of the incident, and employee was placed on the do not return list.
3. Nursing staff including current agency aides received education on accident/hazard prevention. Nursing staff will receive directed in-servicing by AAE Services on F689 accident/hazard prevention on 7/15/26.
4. The Director of Nursing/designee completed random transfer audits on five residents a week for four weeks resulting in staff observed following resident transfer orders.
5. Audits will be taken to QAPI for review/discussion.
F0689 · Champion City Nursing and Rehabilitation Center (PA)
Surveyed 05/19/2026 · Spot-checks: monthly for 4 weeks
The facility is unable to rectify post fall documentation for R3. Director of Nursing (DON)/Designee will audit 7 days of fall documentation to ensure post-fall assessment and documentation…
View Full Plan Text
F0689 Correction Date: 06/16/2026
The facility is unable to rectify post fall documentation for R3. Director of Nursing (DON)/Designee will audit 7 days of fall documentation to ensure post-fall assessment and documentation was completed. DON/Designee will re-educate Registered Nurses on the facility protocol for post fall documentation and RN assessments. DON/Designee will re-educate all staff regarding not moving a resident who has fallen until a complete assessment is completed by an RN. Don/Designee will monitor post-fall documentation 2x per week x 3 weeks to ensure residents are assessed by registered nurses post fall and post fall documentation is in the medical record. Results of audits will be reported by the DON monthly to the Quality Improvement Committee (QIC) for review and recommendations then randomly thereafter as determined by the QIC committee.
F0689 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/17/2026 · Spot-checks: weekly for 4 weeks
R83 immediately assessed on April 6, 2026 with no bruise identified. Skin was intact with no complaint of pain or discomfort. Secure Dementia units checked for personal care items, including…
View Full Plan Text
F0689 Correction Date: 06/02/2026
R83 immediately assessed on April 6, 2026 with no bruise identified. Skin was intact with no complaint of pain or discomfort. Secure Dementia units checked for personal care items, including razors, to ensure they were locked/secured, in resident rooms. Director of Education Services or designee will educate direct care staff that personal care items are to be locked in resident rooms on secured units. Director of Nursing or designee will conduct random audits of the secured unit rooms to ensure personal care items, including razors, are secured. Audits will be completed weekly x4 then monthly x2. Results of the audits will be reviewed by the QAPI committee.
F0689 · The Gardens for Memory Care at Easton (PA)
Surveyed 04/10/2026 · Spot-checks: daily for 4 weeks
1. R90 stop sign placed. 2. Audits of current residents for stop signs to ensure care planned and in place. 3. Education for all staff on ensuring stop signs are in place and secure. 4.…
View Full Plan Text
F0689 Correction Date: 05/12/2026
F0689
1. R90 stop sign placed.
2. Audits of current residents for stop signs to ensure care planned and in place.
3. Education for all staff on ensuring stop signs are in place and secure.
4. DON/designee will complete audits daily x5, weekly x3 and then month x1 and reported to QAPI.
5. Date of compliance is May 12, 2026
F0689 · Little Sisters of the Poor (PA)
Surveyed 01/22/2026 · Spot-checks: daily for 4 weeks
Following the incident, Resident R35 received immediate assessment, hospital transfer, and follow-up monitoring as indicated. The staff member responsible for the unsafe transfer was…
View Full Plan Text
F0689 Correction Date: 03/05/2026
Following the incident, Resident R35 received immediate assessment, hospital transfer, and follow-up monitoring as indicated. The staff member responsible for the unsafe transfer was immediately removed from duty and terminated following investigation. Licensed nursing staff were re-educated on accident prevention, appropriate supervision, and proper use of assistive devices. To identify other residents at risk, the facility completed a facility-wide fall and transfer risk assessment for all residents. Care plans were reviewed and updated to ensure accurate supervision levels, appropriate assistive devices, and correct transfer methods were identified. Staff were re-educated on each resident's individualized supervision and transfer needs. Systemic changes were implemented to prevent recurrence, including review and reinforcement of the Accident Prevention Policy with all staff. Mechanical lift competency validation is now required upon hire and annually thereafter. Supervisory staff conduct random observational rounds during resident transfers. Staff were educated that failure to follow supervision or assistive device requirements will result in disciplinary action. To monitor ongoing compliance, transfer and supervision audits are conducted by Unit Managers and the Director of Nursing on a daily basis for seven days, weekly for two weeks, and monthly for two months. Audit findings and follow-up actions are reviewed during Quality Assurance and Performance Improvement meetings. The date of completion for this corrective action is March 5,
2026. Audits are being done: Daily x 7 days=7 Weekly x 2 weeks=2 Monthly x 2 months=2 Total Audits =11
F0689 · Concordia at Spiritrust Luther Ridge (PA)
Surveyed 06/11/2025 · Spot-checks: weekly for 2 months
1. Resident #1's Broda chair will be tilted at all times except full upright position during mealtimes. 2. All residents currently using Broda chairs have been identified and care plans…
View Full Plan Text
F0689 Correction Date: 07/17/2025
1.Resident #1's Broda chair will be tilted at all times except full upright position during mealtimes. 2.All residents currently using Broda chairs have been identified and care plans reviewed for individualized instructions. 3.All staff is receiving in-service education on proper use of Broda chair tilt mechanisms and the specific care plan for chair use. This in-service will be completed no later than 6/30/25 An audit was conducted of all residents' individualized care plans to ensure that appropriate instructions regarding Broda chair usage, including tilt settings are documented. 4.Broda chair audit that include tilt settings will be conducted weekly X4 then 2 times a month for 2 months. The results of these audits will be reviewed monthly by the QAPI committee to identify any trends or patterns and make recommendations for further intervention.
F0689 · Lehigh Valley Hospital Transitional Skilled Unit (PA)
Surveyed 04/16/2025 · Spot-checks: daily for 4 weeks
1. Water bypass valve was that was left in the open position was moved to the closed position on 4/15/25. Water temperatures for residents 33, 35, 83 and 84 were checked and were in acceptable…
View Full Plan Text
F0689 Correction Date: 05/05/2025
1. Water bypass valve was that was left in the open position was moved to the closed position on 4/15/25. Water temperatures for residents 33, 35, 83 and 84 were checked and were in acceptable range.
2. All sinks and showers that are accessible to residents were checked on 4/15/25 and are within range.
3. A lock out tag out was placed on the bypass valves to prevent it from being left in the open position. All nursing staff were educated on acceptable water ranges before the end of their next scheduled shift. Thermometers were made available for staff to use to check shower temperatures. Policy review was completed, and a new "Water Temperature Monitoring Policy" was created. Employees in the engineering department were educated on water temperature monitoring and documentation. Directed inservices will begin for all licensed nurses on 4/29/25 by state approved provider RKL. Training will be provided in person on 4/29/25 and will be recorded to be used for staff that are unable to attend the live version. Attendance and competency will be tracked by DON or designee.
4. A daily log will be completed by Facilities Director or designee daily for 4 weeks with visual inspection of the lock out tag out being in place. The Facilities Director or designee will conduct random audits of a minimum of 10 sinks/showers daily for 4 weeks. The logs (temperature and visual inspection) will be audited by the Nursing Home administrator or designee weekly for 4 weeks. If there are no issues, the team will review the findings with the Quality Assurance Performance Improvement Committee for recommendations.
F0689 · Kadima Rehabilitation & Nursing at Pottstown (PA)
Surveyed 10/09/2026 · Spot-checks: weekly for 4 weeks
1.) Resident 22 was re-assed to confirm a safe transfer status. Resident 22s care plan was updated to reflect. 2.) A facility wide audit was completed to ensure residents who require…
View Full Plan Text
F0689 Correction Date: 11/11/2026
1.) Resident 22 was re-assed to confirm a safe transfer status. Resident 22s care plan was updated to reflect. 2.) A facility wide audit was completed to ensure residents who require mechanical lift transfers to verify that transfer orders, and care plans reflect correct lift specifications. 3.) The nursing department was re-educated on ensuring safe mechanical lift techniques. 4.) The DON or Designee will conduct weekly audits x 4 weeks then monthly x 2 months to conduct visual audits of resident transfers. The results will be submitted to QAPI Committee for review and analysis for ongoing monitoring
F0689 · Alpine Valley Post Acute and Healthcare Center (PA)
Surveyed 09/18/2026 · Spot-checks: weekly for 4 weeks
1. Resident 112 is no longer a resident in facility 2. An audit will be completed of fall incidents in common areas for the last 60 days to ensure interventions were implemented for impulsive…
View Full Plan Text
F0689 Correction Date: 10/14/2026
1. Resident 112 is no longer a resident in facility
2. An audit will be completed of fall incidents in common areas for the last 60 days to ensure interventions were implemented for impulsive residents related to supervision.
3. Director of Nursing or designee will provide re-education to facility licensed staff that when a resident is impulsive and or restless, interventions need to be identified to reduce risk of falls.
4. A Quality Assurance and Performance Improvement plan will be developed. DON or designee will complete random audits of 5 fall incidents weekly for 4 weeks and then monthly for 2 months to ensure if fall was related to impulsive residents in common area that interventions were in place to reduce risk of falls. Audit findings will be reported to the monthly QAA for review and recommendations.
F0689 · Independence Rehab and Nursing (PA)
Surveyed 09/08/2026 · Spot-checks: weekly for 4 weeks
1. Resident 244 no longer a resident 2. Review resident out on LOA for past 14 days to ensure LOA policy was followed 3. Educated S.S, Nsg, and receptionist on the facility's LOA policy and…
View Full Plan Text
F0689 Correction Date: 10/09/2026
1.Resident 244 no longer a resident
2. Review resident out on LOA for past 14 days to ensure LOA policy was followed
3. Educated S.S, Nsg, and receptionist on the facility's LOA policy and procedure.
4. LOA logs will be audited by admin or designee weekly x4 followed by monthly x2 to ensure compliance with policy
1. Resident 148 call bell was repaired
2. Review house for proper functioning call bells. Any call bell identified broken will be repaired.
3. Educated maintenance and NSG on the procedure for when broken call bells are identified.
4. Weekly x4 followed by monthly x2 of call bells to review functionality Results of both audits will be reported to monthly QAPI
F0689 · Kingston Court Skilled Nursing and Rehabilitation Center (PA)
Surveyed 09/03/2026 · Spot-checks: weekly for 4 weeks
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies. To remain in compliance with all federal and state…
View Full Plan Text
F0689 Correction Date: 10/06/2026
The statements made on this plan of correction are not an admission to and do not constitute an agreement with the alleged deficiencies. To remain in compliance with all federal and state regulations, the facility has taken or will take actions set forth in the following plan of correction. 1.Resident #13's care plan intervention of signs on her bedside table and walker were put into place during the survey. The pill found on the floor during the survey was disposed of in the drug buster. The Director of Nursing was unable to determine who's Lexapro it was. 2.An initial audit will be conducted by the Director of Nursing or designee of current facility residents' fall care plans for an intervention for signage and ensure the sign(s) is in place. An initial audit will be completed of the facility hallways by the Director of Nursing or designee for any medications laying on the floor. Corrections will be made as needed. 3.Education will be provided to the facility nursing staff on policy NSG215 Falls management section of interventions to reduce risk and minimize injury will be implemented as appropriate to ensure fall care plan interventions of signage are in place. Education will be completed with the facility licensed nursing staff regarding how to handle a dropped medication. 4.Five random audits by the Director of Nursing or designee will be conducted of current facility residents' fall care plans for an intervention for signage and ensure the sign(s) is in place. A weekly audit x four weeks will be completed of the facility hallways by the Director of Nursing or designee for any medications laying on the floor. Corrections will be made as necessary and results of audits will be reported at the Quality Assurance Performance Improvement meetings. Date of compliance 10/06 /2026
F0689 · Maybrook Hills Rehabilitation and Healthcare Center (PA)
Surveyed 09/03/2026 · Spot-checks: weekly for 4 weeks
As presented during the time of the Annual Survey, the staff member involved was re-educated at the time of the incident regarding the need to verify that the wheelchair brakes are locked.…
View Full Plan Text
F0689 Correction Date: 10/21/2026
As presented during the time of the Annual Survey, the staff member involved was re-educated at the time of the incident regarding the need to verify that the wheelchair brakes are locked. This is an isolated incident and no other residents were affected. Director of Nursing provided a 2nd education to the staff member involved in this incident. Staff received education during the facility's Annual Competency Fair on ensuring that wheelchair brakes are locked prior to performing transfers. The facility holds both a weekly Risk and Accidents and Injury meeting to review and identify concerns. The facility will continue to meet weekly to audit for concerns with resident safety. The Director of Nursing or designee will complete a random audit on 3 incidents weekly x 4 then monthly x 2 to ensure compliance is being met. Findings will be reviewed at the monthly facility Quality Assurance and Performance Improvement meeting to determine continued frequency of audits.
F0689 · Messiah Lifeways at Messiah Village (PA)
Surveyed 09/02/2026 · Spot-checks: weekly for 4 weeks
Preparation and submission of this plan of correction is required by state and federal law. This plan of correction does not constitute an admission for purposes of general liability,…
View Full Plan Text
F0689 Correction Date: 09/27/2026
Preparation and submission of this plan of correction is required by state and federal law. This plan of correction does not constitute an admission for purposes of general liability, professional malpractice, administrative proceedings or other court proceedings.
1. For all affected residents, incident investigations were reopened and reviewed to ensure all available information was completed and appropriate corrective actions were implemented.
2. A whole-house audit was completed for all residents requiring stand lift transfers to verify transfer assessment is completed and transfer instructions are appropriately reflected in the care plan. Any identified concerns will be addressed.
3. The facility revised its procedures to include that staff will downgrade to maxi-lift and not stand lift until the resident is assessed by therapy and approved for stand lift. The facility also revised its incident investigation process to require two witness statements for all mechanical lift incidents are obtained and reviewed, follow-up interviews are completed when indicated, and appropriate corrective action and education are documented. The facility will re-educate licensed nurses and CNAs on updated policies, adhering to resident-specific transfer requirements, reporting and documenting incidents appropriately.
4. Nursing administration or designee will complete audits of 4 mechanical stand lift transfers 2x per week for 4 weeks then weekly for 4 weeks to verify transfer assessment is completed, transfer instructions are appropriately reflected in the care plan, and required number of staff are present. Nursing administration or designee will complete audits of all transfer-related incident investigations weekly for 2 months to ensure investigations are completed thoroughly and include appropriate follow-up. Results of the audits will be reported to the QAPI committee.
F0689 · Bethlehem North Skilled Nursing and Rehabilitation Center (PA)
Surveyed 08/25/2026 · Spot-checks: daily for 4 weeks
Free of Accident Hazards / Supervision / Elopement Resident 1 was immediately assessed for injury/change in condition following the elopement event, elopement assessment was updated, Leave of…
View Full Plan Text
F0689 Correction Date: 09/25/2026
F689 - Free of Accident Hazards / Supervision / Elopement Resident 1 was immediately assessed for injury/change in condition following the elopement event, elopement assessment was updated, Leave of absence (LOA) privileges/orders were reviewed and updated, appropriate safety interventions were implemented, and the care plan was updated. Resident 2,3,4,5,7, and 8 were also reassessed for elopement risk and LOA privileges. Physician orders were clarified to specify supervised/unsupervised LOA/PASS, restrictions and safety needs. Care plans and elopement assessments were updated as indicated.
1. DON/Designee will complete an initial audit of all current residents with LOA privileges and/or elopement risk to ensure physician orders are complete, supervision status is clearly identified, assessments and care plans are current, and the sign-out process is followed.
2. All staff will be re-educated on elopement process and Leave of Absence/Out on Pass process. All newly identified elopement risks/ LOA/Pass orders will be reviewed in clinical meetings daily to ensure the elopement and LOA/Pass process is followed, orders are accurate, and care plans reflect accurately.
3. DON/Designee will complete weekly audits of all newly identified elopement risks to ensure process is followed, including LOA/pass process x4 wks, then monthly x2months to ensure continued compliance. DON/Designee will report audit findings to the QAPI Committee x3 months. Syllabus sent via email, in-service scheduled for 9/23/26
F0689 · Oak Hill Rehabilitation & Healthcare Center (PA)
Surveyed 08/12/2026 · Spot-checks: weekly for 4 weeks
At the time of the incident Resident (R1) was assessed for injury and sent to the hospital for treatment. The 2 certified nursing assistants were educated at the time for ensuring breaks were…
View Full Plan Text
F0689 Correction Date: 08/26/2026
At the time of the incident Resident (R1) was assessed for injury and sent to the hospital for treatment. The 2 certified nursing assistants were educated at the time for ensuring breaks were locked on shower chairs. An audit was performed at the time of the incident on shower chairs in the facility to ensure proper locking mechanisms. Nursing staff at the time of incident education initiated to ensure shower chairs are properly locked when in use by the assistant director of nursing. An additional audit to include bed and wheelchair locking mechanisms to be completed by Maintenance/Designee. Directed in-service scheduled for 8/24/2026 title F689 Accidents/Hazards/Supervision/Devices. Beginning 8/26/2026, no staff will be able to work until education is completed. The Director of Nursing/Designee will complete a random shower audit 5 times a week x2 weeks then weekly x 2 weeks then monthly x 1 month to ensure that residents shower chair/shower beds are locked during showers. The results will be reviewed at the Quality Assurance and Process Improvement meetings until substantial compliance has been met.
F0689 · Graduate Post Acute (PA)
Surveyed 07/31/2026 · Spot-checks: weekly for 4 weeks
1. The two fluticasone nasal sprays were immediately removed from Resident R139's bedside and properly secured. Resident R139 was assessed for any adverse effects, and physician orders and…
View Full Plan Text
F0689 Correction Date: 09/09/2026
1. The two fluticasone nasal sprays were immediately removed from Resident R139's bedside and properly secured. Resident R139 was assessed for any adverse effects, and physician orders and self-administration status were reviewed. The responsible staff member was immediately counseled regarding proper medication administration and supervision.
2. The Director of Nursing/Designee completed an initial facility-wide audit of resident rooms for unsecured medications. Residents with bedside or self-administered medications were reviewed to ensure appropriate authorization, assessment, and care planning were in place. Any identified concerns were immediately corrected.
3. The Director of Nursing/Designee re-educated licensed nursing staff on the facility's medication administration policy, including proper medication storage, supervision during medication administration, and requirements for residents authorized to self-administer medications.
4. The Director of Nursing/Designee will audit 5 resident rooms and 5 medication administration observations weekly for 4 weeks, then monthly for 2 months to ensure medications are properly secured and residents are appropriately supervised during medication administration. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendations as needed.
F0689 · St. Anne Home (PA)
Surveyed 07/30/2026 · Spot-checks: daily for 4 weeks
Free of Accident Hazards/Supervision/Devices 1. R4 was discharged from the facility. R13 had dycem applied per order. R100 had an air mattress assessment completed. 2. Director of…
View Full Plan Text
F0689 Correction Date: 09/15/2026
F0689 Free of Accident Hazards/Supervision/Devices
1. R4 was discharged from the facility. R13 had dycem applied per order. R100 had an air mattress assessment completed.
2. Director of Nursing/designee will audit facility residents for current physical fall interventions and proper placement and residents with air mattresses to ensure devices and assessments are in place.
3. Director of Nursing/designee will educate clinical nursing staff on monitoring of physical fall interventions. Director of Nursing/designee will educate licensed nursing staff on completion of air mattress assessments. Director of Nursing/designee will audit 24-hour report and order recap daily 5 times per week for 4 weeks to capture additions of fall interventions and air mattresses ensuring the interventions are in place and that air mattresses have been assessed.
4. The results of the audits will be reviewed in the monthly Quality Assurance and Process Improvement meetings for 3 months.
F0689 · Aventura at Pembrooke (PA)
Surveyed 07/29/2026 · Spot-checks: weekly for 4 weeks
Based on observation, interview, and record review, the facility failed to prevent the risk of accident by leaving patient medication unattended at the bedside for one out of eight residents…
View Full Plan Text
F0689 Correction Date: 09/11/2026
Based on observation, interview, and record review, the facility failed to prevent the risk of accident by leaving patient medication unattended at the bedside for one out of eight residents reviewed (Resident 46). Resident 46 was assessed with no adverse effects. All residents have the potential to be affected. Director Of Nursing/designee to complete house wide audit by 11SEP2026 to identify meds at bedside. No meds identified. Director Of Nursing/designee to educate Registered Nurses and Licensed Practical Nurses not to leave meds at bedside by 11SEP2026. Director Of Nursing/Designee to audit randomly weekly x4weeks and monthly x2months. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
F0689 · Markley Rehabilitation and Healthcare Center (PA)
Surveyed 07/10/2026 · Spot-checks: monthly for 4 weeks
Resident R10 was assessed by the nurse following the incident, and the physician and responsible party were notified. Appropriate post-fall assessments and monitoring were completed in…
View Full Plan Text
F0689 Correction Date: 08/24/2026
Resident R10 was assessed by the nurse following the incident, and the physician and responsible party were notified. Appropriate post-fall assessments and monitoring were completed in accordance with facility policy. DON/Designee re-educated nursing staff on how to properly supervise residents who require 2x assistance with ADLs and ensure that there is constant communication between the staff members in the room. DON/Designee provided education to nursing staff regarding how to provide care for residents who are totally dependent on their mobility and repositioning. The DON/Designee will perform audits with random staff members to ensure they are providing sufficient supervision while providing care for residents who require assistance with ADLs. Audits will be conducted 3 times a week for 4 weeks, then monthly for 3 months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendations needed.
F0689 · Chapel Manor (PA)
Surveyed 06/26/2026 · Spot-checks: weekly for 4 weeks
1. Resident R163's care plan was immediately reviewed and the required L-side floor mat was placed. Trash can placed next to the PTAC unit in identified rooms were corrected. 2. NHA/Designee…
View Full Plan Text
F0689 Correction Date: 08/12/2026
1.Resident R163's care plan was immediately reviewed and the required L-side floor mat was placed. Trash can placed next to the PTAC unit in identified rooms were corrected. 2.NHA/Designee completed an initial audit for all residents with floor mats as a fall intervention to ensure the mats are in place and also inspected all residents rooms for trash cans placed near PTAC units. 3.NPE/designee will educate nursing staff on compliance with proper placement of floor mats and maintaining trash cans away from PTAC units. 4.DON/designee will conduct weekly audits x 4 of 4 residents with fall mat intervention to ensure proper placement. And trash cans away from PTAC units. then monthly X 2 Results of audits will be reviewed with the QAPI committee monthly X 3.
F0689 · Cliveden Nursing and Rehabilitation Center (PA)
Surveyed 06/12/2026 · Spot-checks: weekly for 4 weeks
Immediate corrective Action: Transport company employee has not returned back to this facility after the incident. The van that was used for this transport was new and had different securing…
View Full Plan Text
F0689 Correction Date: 07/20/2026
Immediate corrective Action: Transport company employee has not returned back to this facility after the incident. The van that was used for this transport was new and had different securing procedures than what the driver was accustomed to with the old van. The Ambulance Company reinserviced with their driver the importance of proper securing of wheelchairs for this new van. (4 straps instead of 2) Facility will ensure that transportation companies that service the facility implement appropriate education to thier employees regarding transport safety, during initiation of contract. Medications were administered to R32. House wide corrective action: Current residents' rooms will be audited to ensure medications are not left at bedside. Education: Current licensed nursing staff will be re-educated to ensure medications are not left at the bedside. Performance Monitoring: DON or designee will complete weekly audits x 4 weeks of 10 residents' room to ensure medications are not left at the bedside. The results of the audits will be reviewed during the facilities monthly QAPI meeting. The QA committee will determine the need for continued monthly auditing.