K0918 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: monthly for 3 months
1. Maintenance and testing of the generator and transfer switches will be performed in accordance with NFPA 110. One year monthly conductance testing and 30 minute load testing with transfer…
View Full Plan Text
K0918 Correction Date: 09/30/2026
1. Maintenance and testing of the generator and transfer switches will be performed in accordance with NFPA
110. One year monthly conductance testing and 30 minute load testing with transfer switch was completed and will continue to be completed each month by Director of Environmental Services or designee. Facility has also added an additional line on its monthly generator testing documentation form, to now include the actual number of minutes that the emergency generator runs for during required testing.
2. The emergency generator documentation form will be maintained according to the NFPA 101 standards.
3. Director of Environmental Services or designee will audit the emergency generator documentation monthly for 3 months, and then quarterly for 3 quarters. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0918 · Majestic Care of McCordsville (IN)
Surveyed 08/11/2026 · Spot-checks: weekly for 4 weeks
Corrective Action for the Finding: The facility reviewed the weekly exercising documentation cannot be retroactively completed. Any required generator exercising, testing, inspection,…
View Full Plan Text
K0918
Completion Date: 09/30/2026
K0918 Corrective Action for the Finding: The facility reviewed the weekly exercising documentation cannot be retroactively completed. Any required generator exercising, testing, inspection, maintenance, or documentation that was non-compliant was reviewed, along with identifying corrective steps to maintain full compliance moving forward. Identification of Other Residents/Areas Potentially affected: The facility recognizes that a deficiency involving the generator and related essential electrical system components may potentially affect all residents, staff, and visitors during a power interruption or emergency. The facility therefore reviewed its exercise and testing schedule and documentation process to ensure compliance with this mandatory requirement. Systemic Correction: Tutorial with the Maintenance Director regarding documentation for monthly generator and essential testing results, generator logs, and other applicable records will be maintained in the facility's Life Safety/ Generator records and in TELS. The Maintenance Director will provide monthly testing of the generator starting battery before 9/30/2026. The Maintenance Director will work with Generator Systems to complete the 3-year, 4-hour testing on or before 9/30/2026. Monitoring: The QAPI Committee will monitor the monthly generator battery testing X 6 months to ensure we are in compliance with monthly testing. The QAPI Committee will review the 3-year, 4-hour generator testing yearly in January to schedule Generator Systems for the 3-year, 4-hour test when needed. The ED/Designee will oversee.
K0918 · Graduate Post Acute (PA)
Surveyed 08/11/2026 · Spot-checks: monthly for 4 weeks
1. An appropriate battery conductance tester was obtained. The generator's maintenance-free batteries were tested, and the required conductance results were recorded in the generator…
View Full Plan Text
K0918 Correction Date: 09/23/2026
1. An appropriate battery conductance tester was obtained. The generator's maintenance-free batteries were tested, and the required conductance results were recorded in the generator maintenance records.
2. The Maintenance Director/designee reviewed the generator maintenance records. Missing battery tests and maintenance documentation were identified and corrected.
3. Maintenance staff were educated on generator battery conductance testing, required frequency, proper documentation, and record-retention requirements.
4. The Administrator/designee will audit generator maintenance records monthly for three months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
K0918 · Manchester Commons of Presbyterian Seniorcare (PA)
Surveyed 07/22/2026 · Spot-checks: weekly for 4 weeks
1. The new equipment for the maintenance free battery testing was received .The four hour load tests have been scheduled with Cleveland Brothers and will be completed by 8/6/2026, as will the…
View Full Plan Text
K0918 Correction Date: 09/14/2026
1. The new equipment for the maintenance free battery testing was received .The four hour load tests have been scheduled with Cleveland Brothers and will be completed by 8/6/2026, as will the battery conductance tests. The four hour load test has been entered into Worxhub so that the work orders will generate at the required cadence to assure this is not missed in the future. The battery conductance testing has been added to the Cummings monthly report and will be completed and reported to NHA monthly.
2. The survey results will be reviewed at our weekly and quarterly quality meeting, as will dates when corrective action will be completed.
K0918 · St. Anne Home (PA)
Surveyed 07/20/2026 · Spot-checks: monthly for 4 weeks
1. The generator inspection vendor under contract with St. Anne Home did not respond timely to the facility after repeated calls to schedule an inspection for the cited areas. A contract with…
View Full Plan Text
K0918 Correction Date: 08/07/2026
1. The generator inspection vendor under contract with St. Anne Home did not respond timely to the facility after repeated calls to schedule an inspection for the cited areas. A contract with a new vendor was established by the Director of Plant Operations to inspect the Annual Preventative Maintenance Test, Annual Load Bank Test, and the Annual Fuel Quality Test.
2. The inspection for the Annual Preventative Maintenance Test, Annual Load Bank Test, and Annual Fuel Quality Test was scheduled for August 5 and 6 by the Director of Plant Operations.
3. The Nursing Home Administrator educated the Director of Plant Operations to obtain a back-up contract with another generator inspection vendor to prevent this situation from recurring.
4. The schedule for these facility annual tests with due dates for the tests will be reviewed by the Director of Plant Operations at the monthly QAPI meeting on 7/31/26, to add generator audits as a standing agenda item in the QAPI meetings.
K0918 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
0918: Electrical Systems - Essential Electric System: The facility failed to provide documentation verifying a four-hour exercise, under load, of the emergency generator had occurred, within…
View Full Plan Text
K0918 Correction Date: 08/05/2026
0918: Electrical Systems - Essential Electric System: The facility failed to provide documentation verifying a four-hour exercise, under load, of the emergency generator had occurred, within the previous 36 months, and to provide documentation verifying the quality of the diesel fuel servicing the emergency generator had been tested. No residents were affected. All residents have the potential to be affected. A four-hour exercise, under load, of the emergency generator was performed per regulation and documented by the Maintenance Director on 15JUL2026. Diesel fuel servicing the generator was tested and documented per regulatory requirements on 15JUL2026 by the Maintenance Director. On 21JUL2026, NHA educated the Maintenance Director on the importance of performing required generator testing every 36 months and diesel fuel testing monthly, while maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits monthly, to ensure that documentation for generator testing and diesel fuel testing meet the regulatory requirement. NHA/Designee will audit annually Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to the quarterly Quality Assurance Performance Improvement Committee for review and recommendations.
K0918 · Germantown Home (PA)
Surveyed 07/01/2026 · Spot-checks: weekly for 4 weeks
During Life Safety Survey it was identified that one out of nine generator reports the Annual 90-minute load bank test documentation could not be identified as being completed. The maintenance…
View Full Plan Text
K0918 Correction Date: 08/25/2026
During Life Safety Survey it was identified that one out of nine generator reports the Annual 90-minute load bank test documentation could not be identified as being completed. The maintenance director has scheduled the 90-minute load bank test to be completed. Education with maintenance team on importance of generator testing and scheduling to be completed. Maintenance Director will place the annual 90-minute load bank test for the generator in the TEL's maintenance calendar as a reminder for maintenance team. Maintenance Director will report in QAPI confirmed 90-minute load bank test for 1 month. Corrective Action Date- 08/25/2026
K0918 · Scranton Health Care Center (PA)
Surveyed 06/24/2026 · Spot-checks: monthly for 4 weeks
Step 1: The facility has confirmed that Mechanical Services will be on site at the building on 7/15/2026 to do a Generator Fuel Test. Step 2: To identify like situations, facility will monitor…
View Full Plan Text
K0918 Correction Date: 07/21/2026
Step 1: The facility has confirmed that Mechanical Services will be on site at the building on 7/15/2026 to do a Generator Fuel Test. Step 2: To identify like situations, facility will monitor the maintenance documentation of the generator Step 3: To prevent this from happening again, the Maintenance Director will educate the company that services the generator on follow through of documentation and results that need attention. Step 4 To monitor and maintain ongoing compliance Maintenance Director will audit all documentation related to the generator monthly x 6 to ensure compliance. The results of the audits will be forwarded to the facility QAPI committee for further review and recommendations.
K0918 · Avalon Care Center (PA)
Surveyed 06/16/2026 · Spot-checks: weekly for 4 weeks
Maintenance Department will be reeducated on essential electric system maintenance and testing for emergency generators by the Nursing Home Administrator. Education will include monthly…
View Full Plan Text
K0918 Correction Date: 07/16/2026
Maintenance Department will be reeducated on essential electric system maintenance and testing for emergency generators by the Nursing Home Administrator. Education will include monthly 30-minute load testing, monthly battery testing, weekly battery voltage and visual inspection. Maintenance department will review all documentation monthly with the Nursing Home Administrator.
K0918 · Yorkview Nursing and Rehabilitation (PA)
Surveyed 06/09/2026 · Spot-checks: weekly for 2 months
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is…
View Full Plan Text
K0918 Correction Date: 07/24/2026
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is prepared and/or executed by provision of Federal or State Law.
1. The weekly battery voltage inspection and the 3 year, 4hr generator load test was completed.
2. Completion date 6/18/26.
3. The Maintenance Director has been educated on conducting and documenting weekly visual inspections of the battery voltage on the emergency generator log and scheduling in advance the 3 year, 4hr generator load test.
4. Maintenance Director/designee will audit weekly the battery voltage and report for 2 months the completions of the weekly visual inspections of the battery voltage and the scheduling plan for the 3 year, 4hr generator load test at the monthly Quality Assurance and Performance Improvement Committee to address any trends or patterns for further review and/or recommendations.
5. Date of compliance: 7/24/26
K0918 · Holy Family Manor (PA)
Surveyed 06/08/2026 · Spot-checks: weekly for 4 weeks
1. The emergency fuel reserve was verified and sampled by Albarell Electric Inc. on June 11th, 2026. The remote generator annunciator was assessed by Albarell Electric Inc. and is working…
View Full Plan Text
K0918 Correction Date: 07/31/2026
1. The emergency fuel reserve was verified and sampled by Albarell Electric Inc. on June 11th,
2026. The remote generator annunciator was assessed by Albarell Electric Inc. and is working properly. Facility Maintenance will ensure this testing is completed annually.
2. Maintenance Director/Designee will conduct random generator and line power audits to ensure generator and line power are working properly. Findings will be reported during our QAPI meeting.
K0918 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: daily for 4 weeks
The emergency generator block heater, oil cooler, and valve covers were repaired/replaced, and the front desk annunciator panel trouble mode was cleared. - The Maintenance Director was…
View Full Plan Text
K0918 Correction Date: 07/20/2026
- The emergency generator block heater, oil cooler, and valve covers were repaired/replaced, and the front desk annunciator panel trouble mode was cleared. - The Maintenance Director was re-educated on tracking generator service report deficiencies and monitoring annunciator errors. - The Director of Maintenance or designee will inspect the annunciator panel daily and verify logs weekly. Monthly audits times 3 will continue with results reported to the QA Committee.
K0918 · Quality Life Services - New Castle (PA)
Surveyed 05/27/2026 · Spot-checks: monthly for 3 months
Revision cannot be made to prior documentation. Maintenance Director Educated on Electrical Systems requirements. Audits will be completed monthly times 3 for 3 months. Results will be brought…
View Full Plan Text
K0918 Correction Date: 07/14/2026
Revision cannot be made to prior documentation. Maintenance Director Educated on Electrical Systems requirements. Audits will be completed monthly times 3 for 3 months. Results will be brought to QAPI
K0918 · Luther Crest Nursing Facility (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 4 weeks
1. Curtis Power Solutions, the contractor performing facility generator p.m.'s, has been notified to take a fuel quality sample during the next scheduled maintenance/filter change that is…
View Full Plan Text
K0918 Correction Date: 06/05/2026
1. Curtis Power Solutions, the contractor performing facility generator p.m.'s, has been notified to take a fuel quality sample during the next scheduled maintenance/filter change that is pending completion June 2026.
2. Maintenance Director/Designee will ensure that the diesel generator has a fuel quality sample done and recorded for the preceding twelve-month period.
K0918 · Chambersburg Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/18/2026 · Spot-checks: weekly for 2 months
1. and2. Maintenance Director has completed weekly and monthly inspection/testing of facilities emergency generator since April 2026 to current. 3. Maintenance department will be educated on…
View Full Plan Text
K0918 Correction Date: 06/19/2026
1.and2. Maintenance Director has completed weekly and monthly inspection/testing of facilities emergency generator since April 2026 to current.
3. Maintenance department will be educated on the standards of ensuring the facility has completed the weekly/monthly inspection/testing of facilities emergency generator.
4. Maintenance or facility designee will audit the facilities weekly/monthly inspection/testing of the facilities emergency generator weekly for 2 months, then every 60 days throughout the year and results of the audit will be reported to the QAPI committee.