K0911 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
The electrical wiring identified will be fixed before POC completion date. All other electrical wiring in boiler room were inspected and confirmed to be functioning. NHA or designee will…
View Full Plan Text
K0911 Correction Date: 09/16/2026
The electrical wiring identified will be fixed before POC completion date. All other electrical wiring in boiler room were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on electrical wiring requirements and routine inspections. Maintenance director or designee will boiler room electrical panel and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0911 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: monthly for 4 weeks
1) Electrical panels have been secured throughout the facility. 2) Maintenance director will be educated on securing electrical panels from unauthorized entry, in four smoke zones of the…
View Full Plan Text
K0911 Correction Date: 09/15/2026
1) Electrical panels have been secured throughout the facility. 2) Maintenance director will be educated on securing electrical panels from unauthorized entry, in four smoke zones of the component 3) NHA/designee will conduct random audits monthly and following any electrical work is completed to ensure electric panels are secure. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
K0911 · Germantown Home (PA)
Surveyed 07/01/2026 · Spot-checks: weekly for 4 weeks
During survey electrical panel was blocked by salon equipment and chair in the second-floor beauty salon. Items were immediately removed during survey. A large sign will be placed in this area…
View Full Plan Text
K0911 Correction Date: 08/25/2026
During survey electrical panel was blocked by salon equipment and chair in the second-floor beauty salon. Items were immediately removed during survey. A large sign will be placed in this area and hairdresser and housekeeping will be educated to not block this area and discuss the NFPA rule. Maintenance Director/Designee will check weekly for three months. Maintenance Director will report findings in QAPI meeting for three months.
K0911 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: weekly for 4 weeks
Approved protective cover plates were installed on the two open ceiling junction boxes in the second-floor Dining Room. - The Maintenance Director was re-educated on National Electric Code…
View Full Plan Text
K0911 Correction Date: 07/20/2026
- Approved protective cover plates were installed on the two open ceiling junction boxes in the second-floor Dining Room. - The Maintenance Director was re-educated on National Electric Code requirements regarding enclosing open electrical wiring. - The Director of Maintenance or designee will inspect dining area ceilings weekly x
4. Monthly audits times 3 will continue with results reported to the QA Committee.
K0911 · The Village at Penn State (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 4 weeks
1. A full cover plate will be installed over the old nurse call system wiring in the beauty shop by date of compliance. 2. Maintenance staff will complete a facility walk through to inspect…
View Full Plan Text
K0911 Correction Date: 06/30/2026
1. A full cover plate will be installed over the old nurse call system wiring in the beauty shop by date of compliance.
2. Maintenance staff will complete a facility walk through to inspect areas where call bells were replaced to ensure cover plates are present. Cover plates will be installed for exposed old system wiring discovered during audit. Date of compliance June 30, 2026
K0911 · Holy Family Home (PA)
Surveyed 04/06/2026 · Spot-checks: weekly for 4 weeks
1. All abandoned temporary lighting and wiring above ceiling spaces were removed. 2. The Maintenance Director will review electrical systems quarterly and document compliance with NFPA 70.
View Full Plan Text
K0911 Correction Date: 05/13/2026
1. All abandoned temporary lighting and wiring above ceiling spaces were removed.
2. The Maintenance Director will review electrical systems quarterly and document compliance with NFPA 70.
K0911 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
The facility has corrected the deficiency. On March 10, 2026, all items blocking access to the electrical panels in the transfer switch room were removed to ensure proper clearance. A…
View Full Plan Text
K0911 Correction Date: 04/27/2026
The facility has corrected the deficiency. On March 10, 2026, all items blocking access to the electrical panels in the transfer switch room were removed to ensure proper clearance. A facility-wide inspection was conducted to ensure all electrical panels are accessible and compliant. The Maintenance Director or designee will monitor compliance during routine environmental rounds to ensure electrical panels remain unobstructed. Completion date: March 10, 2026.
K0911 · Accela Rehab and Care Center at Somerton (PA)
Surveyed 02/24/2026 · Spot-checks: weekly for 4 weeks
Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies.…
View Full Plan Text
K0911 Correction Date: 04/21/2026
Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed with federal and state law requirements. Identification of other residents or areas having the potential to be affected due to the nature of the deficiency: The deficient practice has the potential to affect all residents. Corrective action 1.Missing light switch and cover replaced in laundry resident room.Maintenance director or designee to re-educate maintenance staff on the importance of maintaining light witches and covers 3.Maintenance director or designee to audit laundry rooms for missing light switches and covers. Weekly X4 monthly X2 4.Results will be reviewed at the quarterly QAPI meeting.
K0911 · Liberty Pointe Rehabilitation and Healthcare Center (PA)
Surveyed 01/20/2026 · Spot-checks: monthly for 4 weeks
A cover plate was placed on the junction box in the basement tank room. Open wires near the basement tank room were placed in a junction box. Junction box was placed above the exit sign on the…
View Full Plan Text
K0911 Correction Date: 02/23/2026
A cover plate was placed on the junction box in the basement tank room. Open wires near the basement tank room were placed in a junction box. Junction box was placed above the exit sign on the employee entrance ramp. First floor electric panel cover was repaired. Junction box plate cover repaired above the ceiling tiles at the first-floor nurse station. Maintenance to be educated on the NFPA 101 electrical system requirements. Maintenance to monitor monthly or until compliance is met. Findings will be brought to the QAPI committee.
K0911 · Fairview Rehab and Care Center (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
Maintenance team repaired the cover plates for the elevator room. Wiring to be placed in junction box that was on the second floor elevator. Emergency duplex outlet to be attached to the wall…
View Full Plan Text
K0911 Correction Date: 03/03/2026
K0911 Maintenance team repaired the cover plates for the elevator room. Wiring to be placed in junction box that was on the second floor elevator. Emergency duplex outlet to be attached to the wall near the supply room on 2nd floor corridor. Missing junction box cover plate near the laundry room above the ceiling tiles near the water heaters to be placed and repaired. Duplex outlet to get secured to the wall in the boiler room near the entrance of room. MC cable to have a juncture box added near the pipes of water in the third floor boiler room. The junction box to get a cover plate in the third floor boiler room. Maintenance to audit and replace any other Loose or broken wool mounts and wiring. Maintenance team educated on securing outlets to the walls by Regional Maintenance Director. Maintenance director to provide update at QAPI.
K0911 · Care Pavilion Nursing and Rehabilitation Center (PA)
Surveyed 12/15/2025 · Spot-checks: daily for 4 weeks
Correction: Obstructions were removed to ensure clear access. Systemic Changes: Clearance signage was installed. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks…
View Full Plan Text
K0911 Correction Date: 01/30/2026
Correction: Obstructions were removed to ensure clear access. Systemic Changes: Clearance signage was installed. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks and monthly x 2 months.
Completion Date: 1/30/26. UPDATE: Correction: Obstructions were removed to ensure clear access to community wide electrical access panels. Systemic Changes: Clearance signage was installed. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks and monthly x 2 months. The Audits will be brought to QAPI for review.
Completion Date: 1/30/26.
K0911 · Sarah Reed Senior Living (PA)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
1. Laundry carts were immediately removed to provide clear access to the electrical panels, restoring compliance and ensuring safe access in case of emergency. 2. Maintenance to conduct a full…
View Full Plan Text
K0911 Correction Date: 01/23/2026
1. Laundry carts were immediately removed to provide clear access to the electrical panels, restoring compliance and ensuring safe access in case of emergency.
2. Maintenance to conduct a full audit of all electrical panels in the facility to ensure none are blocked.
3. Staff will be educated to keep electrical panels clear at all times by putting caution tape on floors to show staff the area's that need be remain unobstructed.
4. This will be monitored and reported at next quarterly QAPI meeting by the maintenance supervisor.
K0911 · Chapel Manor (PA)
Surveyed 12/01/2025 · Spot-checks: weekly for 4 weeks
Electrical deficiencies cited inside IT room, (corridor) at A115, 2nd Fl. at 217, 2nd Fl. Soiled Utility room and basement elevator have been repaired to ensure electrical systems are…
View Full Plan Text
K0911 Correction Date: 01/07/2026
Electrical deficiencies cited inside IT room, (corridor) at A115, 2nd Fl. at 217, 2nd Fl. Soiled Utility room and basement elevator have been repaired to ensure electrical systems are maintained. NHA will educate the Maintenance department to ensure that the electrical system is inspected and maintained per regulations. NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that the electrical system is inspected and maintained per regulations Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0911 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
1. On 9/22/2025 the Maintenance Supervisor installed the protective cover plates on the two electrical panels in the elevator room. On 9/22/2025 the Maintenance Director mounted the quad box…
View Full Plan Text
K0911 Correction Date: 12/29/2025
1. On 9/22/2025 the Maintenance Supervisor installed the protective cover plates on the two electrical panels in the elevator room. On 9/22/2025 the Maintenance Director mounted the quad box receptacle in the laundry folding room.
2. On 9/22/2025 the maintenance team inspected all electrical panels and quad box receptacles to verify proper mounting.
3. On 9/22/2025 the Administrator educated the Maintenance Department on K-tag 911 regarding maintaining the protection of electrical wiring.
4. The Maintenance Director/Designee will conduct audits weekly for 4 weeks to ensure no exposed wiring or cover plates for electrical panels are missing. Audits will be reviewed at the QAPI meeting held monthly.
K0911 · West Chester Rehabilitation and Healthcare Center (PA)
Surveyed 10/28/2025 · Spot-checks: monthly for 2 months
1. The outlet in basement level employee breakroom was replaced and tested on GFCI outlet providing ground fault protection. 2. Maintenance staff were educated on GFCI regulations. 3. An Audit…
View Full Plan Text
K0911 Correction Date: 12/04/2025
1. The outlet in basement level employee breakroom was replaced and tested on GFCI outlet providing ground fault protection.
2. Maintenance staff were educated on GFCI regulations.
3. An Audit was conducted to all outlets within 18 inches of a water source to ensure proper ground fault protection was in place. Additional audits will be conducted monthly for 2 months to ensure proper ground fault protection is in place within 18 inches of a water source. Audit results will be submitted to Quality Assurance Performance Improvement Committee for additional review and recommendations as needed. Further audit frequency will be determined based on audit findings.