K0761 · Yorkview Nursing and Rehabilitation (PA)
Surveyed 06/09/2026 · Spot-checks: monthly for 4 weeks
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is…
View Full Plan Text
K0761 Correction Date: 07/24/2026
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is prepared and/or executed by provision of Federal or State Law.
1. The Maintenance Department conducted an annual inspection of all rated/labeled doors in the facility.
2. Completion date 7/13/26.
3. The Maintenance Department has been educated to visually inspect all facility fire doors and to complete documentation.
4. NHA/Designee will audit life safety book semi-annually to confirm the annual fire door inspection has been filed, and any deficiencies have been addressed, and scheduled date of the next inspection. Findings will be reviewed at the monthly Quality Assurance and Performance Improvement Committee to address further action planning or the need for further review.
5. Date of compliance: 7/24/26
K0761 · Arbor Grove Village (IN)
Surveyed 05/27/2026 · Spot-checks: daily for 4 weeks
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; Some residents could potentially 2. How other residents having the…
View Full Plan Text
K0761
Completion Date: 06/25/2026
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; Some residents could potentially
2. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action will be taken; Some residents could potentially be affected by this alleged deficient practice. Maintenance director in-serviced on 5/28/26 on conducting annual fire door testing to 400 hall door, 200 hall door and Oxygen Transfilling room door and include on report.
3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur; Maintenance director or designee will use Life safety code/QAPI tool to audit annual fire door testing to 400 hall door, 200 hall door and Oxygen Transfilling room door and include on report. Maintenance Director or designee will complete ongoing monitoring via QAPI program with meetings held bi-monthly and is overseen by the Executive Director. The Maintenance Director will audit daily (5x week) for 4 weeks, monthly x 6 months, using Life Safety/QAPI Audit tool and thereafter QAPI committee will determine need for further review. The results of these audits will be reviewed by the QAPI committee, if threshold of 100% is not achieved an action plan will be revised/completed.
K0761 · Lancaster Nursing and Rehabilitation Center (PA)
Surveyed 05/13/2026 · Spot-checks: monthly for 4 weeks
Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the…
View Full Plan Text
K0761 Correction Date: 07/02/2026
Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of Federal and State Law. The plan of correction represents the facility's credible allegation of compliance. K 0761 NFPA 101 Maintenance, Inspection and Testing Doors
1. Annual fire door inspection cannot be retroactively corrected. Annual fire door inspection was completed.
2. Maintenance director or designee will re-educate the facility maintenance staff regarding annual fire door inspection is to be completed yearly. Results of annual fire door inspections are to be placed in the life safety book.
3. Maintenance or designee will audit yearly that the annual fire door inspection is completed. Maintenance director or designee will also audit annual fire door inspection results are in the life safety binder monthly x 6 months.
4. Findings of the audit will be reported to the facility quality assurance performance improvement committee to determine the need for additional actions and monitoring.
K0761 · The Ball Pavilion (PA)
Surveyed 03/31/2026 · Spot-checks: weekly for 4 weeks
The facility identified deficiencies with fire-rated door assemblies during the annual inspection. Builder's Hardware has been scheduled to complete necessary repairs, including installation…
View Full Plan Text
K0761 Correction Date: 04/09/2026
The facility identified deficiencies with fire-rated door assemblies during the annual inspection. Builder's Hardware has been scheduled to complete necessary repairs, including installation of required materials, on 4/10/26. All identified doors will be brought into compliance at that time. Staff have been made aware of the importance of maintaining fire door integrity and increased monitoring of door function has been implemented until repairs are completed. Upon completion of repairs, documentation will be maintained to reflect correction of all identified deficiencies. Maintenance Director is responsible for ensuring completion of repairs and will provide documentation to the Administrator.
K0761 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
The facility has corrected the deficiency. On March 26, 2026, an annual fire door assembly inspection was completed by a qualified vendor, and documentation has been maintained on-site. A…
View Full Plan Text
K0761 Correction Date: 04/27/2026
The facility has corrected the deficiency. On March 26, 2026, an annual fire door assembly inspection was completed by a qualified vendor, and documentation has been maintained on-site. A tracking system has been implemented to ensure annual inspections are completed timely. The Maintenance Director or designee will monitor compliance by reviewing fire door inspection records annually. Completion date: March 26, 2026
K0761 · Embassy of Hearthside (PA)
Surveyed 02/09/2026 · Spot-checks: weekly for 4 weeks
On 2/27/2026 the maintenance director was trained on proper inspection of fire door functional and visual testing. Forms for inspection of each door will be maintained in maintenance. Annual…
View Full Plan Text
K0761 Correction Date: 03/30/2026
On 2/27/2026 the maintenance director was trained on proper inspection of fire door functional and visual testing. Forms for inspection of each door will be maintained in maintenance. Annual testing of fire door functional and visual testing has been scheduled in the facilities preventive maintenance system, TELS. Maintenance will report findings at QAPI.
K0761 · Care Pavilion Nursing and Rehabilitation Center (PA)
Surveyed 12/15/2025 · Spot-checks: daily for 4 weeks
Correction: The fire-rated door was repaired to ensure proper latching. Systemic Changes: Annual fire door inspections were scheduled. Monitoring: Maintenance Director/Designee will round…
View Full Plan Text
K0761 Correction Date: 01/30/2026
Correction: The fire-rated door was repaired to ensure proper latching. Systemic Changes: Annual fire door inspections were scheduled. Monitoring: Maintenance Director/Designee will round community daily x 2 weeks and monthly x 2 months.
Completion Date: 1/30/26.
K0761 · Heritage Care Center (PA)
Surveyed 11/25/2025 · Spot-checks: weekly for 4 weeks
1. Corrective Action for Residents Affected A certified fire door inspection vendor was contracted and completed all required NFPA 80 annual fire door assembly inspections. 2. Identification…
View Full Plan Text
K0761 Correction Date: 01/20/2026
1. Corrective Action for Residents Affected A certified fire door inspection vendor was contracted and completed all required NFPA 80 annual fire door assembly inspections.
2. Identification of Other Residents Potentially Affected All residents are potentially impacted due to fire door assemblies not being inspected. The vendor-provided inspection confirmed all fire doors have now been evaluated and necessary corrective actions completed.
3. Systemic Changes The vendor contract now includes automatic annual scheduling with reminders 60 days prior to due dates. The Fire Door Compliance Calendar was added to the Life Safety Binder. The Maintenance Director was re-educated on NFPA 80 inspection documentation requirements and vendor oversight.
4. Monitoring / QA The Maintenance Director will verify annually that all fire door inspections are completed and filed. Verification will be reviewed by the Safety Committee and QAPI annually.
K0761 · Monroeville Post Acute (PA)
Surveyed 11/19/2025 · Spot-checks: monthly for 4 weeks
1. Facility immediately conducted a facility wide audit of all fire door assemblies. Any deficiencies were immediately corrected. 2. Maintenance staff were re-educated on NFPA 80 requirements…
View Full Plan Text
K0761 Correction Date: 12/03/2025
1. Facility immediately conducted a facility wide audit of all fire door assemblies. Any deficiencies were immediately corrected.
2. Maintenance staff were re-educated on NFPA 80 requirements
3. Monitoring & Quality Assurance Plan: The Maintenance Director will perform and document monthly visual checks of all fire doors for six months. The Administrator or designee will conduct quarterly spot-checks of at least five randomly selected fire doors. All fire door compliance, vendor reports, and corrective actions will be reviewed monthly in the Safety Committee and QAPI meetings.Any deficiencies or repeat issues will trigger immediate re-education and corrective action planning
4. The facility will achieve full compliance by 12/5/2025.
K0761 · Germantown Home (PA)
Surveyed 08/19/2025 · Spot-checks: weekly for 3 months
The Maintenance Team will audit fire doors weekly to ensure doors are latching and repaired as needed; for doors that cannot be fixed by the maintenance team, a door company will be called in…
View Full Plan Text
K0761 Correction Date: 10/18/2025
- The Maintenance Team will audit fire doors weekly to ensure doors are latching and repaired as needed; for doors that cannot be fixed by the maintenance team, a door company will be called in to repair doors. Audit will be done weekly for one month and biweekly for two months. - Doors will be monitored by the Maintenance Director and/or Designee. - The fire doors audit will be reviewed/monitored in QAPI monthly for 3 months. Corrective action was completed on October 18, 2025.
K0761 · Country Meadows Nursing Center of Bethlehem (PA)
Surveyed 07/24/2025 · Spot-checks: weekly for 4 weeks
1. Annual Inspection of Swinging Fire Door Assemblies, NFPA 80, 2010 Edition Form was located online and downloaded for use. A onetime annual inspection of all swinging will be completed. 2.…
View Full Plan Text
K0761 Correction Date: 09/10/2025
1. Annual Inspection of Swinging Fire Door Assemblies, NFPA 80, 2010 Edition Form was located online and downloaded for use. A onetime annual inspection of all swinging will be completed.
2. Administrator or designee will provide education to Director of Maintenance/designee on the requirement to inspect and test all fire door assemblies annually.
3. A process will be initiated to inspect all swinging fire doors annually moving forward.
K0761 · Sunnyview Nursing and Rehabilitation Center (PA)
Surveyed 07/24/2025 · Spot-checks: monthly for 4 weeks
Adjust the door closure to ensure self positive latching to frame. Audit door monthly to ensure door has positive latching to frame. Results of audit will be brought to monthly meeting and…
View Full Plan Text
K0761 Correction Date: 09/07/2025
Adjust the door closure to ensure self positive latching to frame. Audit door monthly to ensure door has positive latching to frame. Results of audit will be brought to monthly meeting and added to the minutes to ensure compliance and further need of audits.
K0761 · The Gardens at Camp Hill (PA)
Surveyed 07/21/2025 · Spot-checks: monthly for 4 weeks
All facility fire doors were inspected, and documentation was filed in the Life Safety compliance binder. Maintenance Director educated on completing monthly door inspections with…
View Full Plan Text
K0761 Correction Date: 08/15/2025
All facility fire doors were inspected, and documentation was filed in the Life Safety compliance binder. Maintenance Director educated on completing monthly door inspections with documentation. Fire door inspections will be completed annually, with doors scheduled in rotating groups to ensure all are inspected within each 12-month period. The Director of Maintenance will verify that each inspection report is filed in the Life Safety binder, and the Administrator or designee will conduct quarterly audits to confirm compliance, with results reported to QAPI
K0761 · Riverstreet Manor (PA)
Surveyed 06/09/2025 · Spot-checks: monthly for 4 weeks
Facility will complete fire door inspection and provide documentation of same. Facility will continue to complete fire door inspections and have documentation of same annually. Maintenance…
View Full Plan Text
K0761 Correction Date: 07/22/2025
Facility will complete fire door inspection and provide documentation of same. Facility will continue to complete fire door inspections and have documentation of same annually. Maintenance will complete an audit monthly to ensure the facility has completed fire door inspections and can provide proof of documentation annually. Results of the audits will be discussed during the monthly QAPI Meetings for review and/or recommendations.
K0761 · Walnut Creek Nursing and Rehab (PA)
Surveyed 05/28/2025 · Spot-checks: weekly for 10 weeks
Maintenance Director Identified fire door deficiency on 3/3/2025 during an audit. Immediately contacted vendor for replacement. Vendor provided quote on replacement 3/8/2025, and quote was…
View Full Plan Text
K0761 Correction Date: 06/25/2025
Maintenance Director Identified fire door deficiency on 3/3/2025 during an audit. Immediately contacted vendor for replacement. Vendor provided quote on replacement 3/8/2025, and quote was approved on 3/13/2025, check for 50% deposit was given to vendor on 3/18/2025. Fire door inspection by contractor completed on 5/15/2025 noted door to be out of compliance during annual inspection. Replacement door has been ordered from the manufacturer by the vendor with an anticipated delivery and installation in August due to manufacturing lead time. Facility will audit fire doors once a week for 10 weeks to ensure fire doors are in compliance.