K0362 · The Gardens at Easton (PA)
Surveyed 05/21/2026 · Spot-checks: weekly for 4 weeks
NFPA 101 Corridors- Construction of Walls 1. Maintenance fixed hole found in Annex resident room. 2. Housewide education to all staff- when maintenance issues are seen such as holes, etc. put…
View Full Plan Text
K0362 Correction Date: 06/29/2026
K 0362- NFPA 101 Corridors- Construction of Walls
1. Maintenance fixed hole found in Annex resident room.
2. Housewide education to all staff- when maintenance issues are seen such as holes, etc. put in TELS system and report to maintenance.
3. Room audits to be done weekly x4 weeks then monthly x2 months to ensure no holes in room walls. Repairs to be done with any findings.
4. Report findings to QAPI.
K0362 · Chambersburg Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/18/2026 · Spot-checks: weekly for 2 months
1. and2. Maintenance Director has fixed the unprotected penetration of the corridor wall behind the handrail between A hall janitor's closet/soiled utility room and completed facility wide…
View Full Plan Text
K0362 Correction Date: 06/19/2026
1.and2. Maintenance Director has fixed the unprotected penetration of the corridor wall behind the handrail between A hall janitor's closet/soiled utility room and completed facility wide audit for unprotected penetration of corridor walls.
3. Maintenance department will be educated on the standards of ensuring the facility does not have unprotected penetrations of corridor walls.
4. Maintenance or facility designee will audit the facilities corridor walls weekly for 2 months, then every 60 days throughout the year to ensure no unprotected penetration of corridor walls and results of the audit will be reported to the QAPI committee.
K0362 · Chapel Manor (PA)
Surveyed 12/01/2025 · Spot-checks: weekly for 4 weeks
Unsealed penetrations around the duct work and alongside the wall in the IT room were sealed to ensure smoke resistance using 3M Fire Barrier Sealant CP 25WB+ (4 hrs). NHA will educate the…
View Full Plan Text
K0362 Correction Date: 01/07/2026
Unsealed penetrations around the duct work and alongside the wall in the IT room were sealed to ensure smoke resistance using 3M Fire Barrier Sealant CP 25WB+ (4 hrs). NHA will educate the Maintenance department to ensure that unsealed penetrations throughout the facility are sealed to ensure smoke resistance. NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that unsealed penetrations are sealed. Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0362 · Embassy of East Mountain (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
Unsealed corridor wall penetration across from resident room was repaired. All staff reeducated on use of TELS system to notify Maintenance of any unsealed wall penetrations Random weekly…
View Full Plan Text
K0362 Correction Date: 05/05/2025
Unsealed corridor wall penetration across from resident room was repaired. All staff reeducated on use of TELS system to notify Maintenance of any unsealed wall penetrations Random weekly environmental rounds will be completed.
K0362 · Abbeyville Skilled Nursing and Rehabilitation Center (PA)
Surveyed 02/19/2025 · Spot-checks: weekly for 4 weeks
1. Maintenance repaired unprotected penetrations near rooms 83, 85, and 15. 2. Maintenance and staff will be educated on K0362 Unprotected penetrations. 3. When facility has a project that…
View Full Plan Text
K0362 Correction Date: 04/04/2025
1.Maintenance repaired unprotected penetrations near rooms 83, 85, and 15.
2. Maintenance and staff will be educated on K0362 Unprotected penetrations. 3.When facility has a project that impacts the corridor walls, the maintenance director and/or Administrator must conduct an audit and sign off on the work order that all holes have been repaired with the appropriate material for that wall. 4.Results of audit reported to QA committee
K0362 · Kingston Court Skilled Nursing and Rehabilitation Center (PA)
Surveyed 09/24/2026 · Spot-checks: weekly for 4 weeks
1. Dining Room door latching hardware was repaired by the Maintenance Director on 9/29/2026. 2. An audit for all dining room doors inspected for required closure was conducted by the…
View Full Plan Text
K0362 Correction Date: 10/30/2026
1.Dining Room door latching hardware was repaired by the Maintenance Director on 9/29/2026. 2.An audit for all dining room doors inspected for required closure was conducted by the Maintenance Director on 10/01/2026. 3.Maintenance staff were re-educated on 9/28/2026 on Corridors; including closures of smoke barrier doors. 4.Weekly Dining room doors audits will be conducted by the Maintenance Director for 4 weeks, and monthly after for three months. Findings reported monthly to the QAPI Committee. 5.Date of Completion:10/30/2026
K0362 · Hamilton Arms Center (PA)
Surveyed 09/22/2026 · Spot-checks: weekly for 4 weeks
1. Two unprotected penetrations of the corridor wall between resident resident room and resident resident room, each located behind the handrail have been repaired. 2. Walls have been…
View Full Plan Text
K0362 Correction Date: 11/03/2026
1. Two unprotected penetrations of the corridor wall between resident resident room and resident resident room, each located behind the handrail have been repaired.
2. Walls have been inspected behind all hand rails throughout the facility. Any holes found will be repaired. 3.Education will be provided to all staff on reporting maintenance issues.
4. Weekly audits will occur for 1 month. Audits will be conducted by the maintenance director or designee. A different floor will be chosen each week.
5. Results of the audits will be reviewed by the QAPI committee.
6. Date Certain is 11-3-26