K0345 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
Fire alarm system will be repaired before POC completion date. NHA or designee will educate maintenance director on fire system requirements and routine inspections. Maintenance director or…
View Full Plan Text
K0345 Correction Date: 09/16/2026
Fire alarm system will be repaired before POC completion date. NHA or designee will educate maintenance director on fire system requirements and routine inspections. Maintenance director or designee will audit the fire alarm system and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0345 · Markley Rehabilitation and Healthcare Center (PA)
Surveyed 07/23/2026 · Spot-checks: weekly for 2 months
1. The facility fire alarm service provider is scheduled to troubleshoot and clear all trouble signals on the fire panel. Acknowledgement buttons replaced annunciators on the 2nd and 3rd…
View Full Plan Text
K0345 Correction Date: 09/21/2026
1. The facility fire alarm service provider is scheduled to troubleshoot and clear all trouble signals on the fire panel. Acknowledgement buttons replaced annunciators on the 2nd and 3rd floors.
2. Maintenance staff checked the fire panel for additional issues and found that the fire panel was operating correctly except for the trouble signals that were indicated.
3. NHA/Maintenance Director/Designee will in-service managers on duty, receptionists, and nursing supervisors on the importance of not having trouble signals on the fire panels and directions to use when one is identified.
4. The Maintenance Director/Designee will check the panel 3x a week for four weeks, then once a week for 2 months thereafter to make sure the panel is functioning appropriately. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendations needed. TLW: Markley Rehabilitation and healthcare center would like to request a Time Limited Waiver (TLW) For deficiency K0345 Fire Alarm Testing and Maintenance as the facility failed to correct the deficiencies on the fire alarm system for troubles on our panel this was identified on the recent Department of Health Life Safety Survey completed on July 23,
2026. Markley Rehabilitation and Healthcare Center called our provider to clear troubles on panel. they need to order new smoke heads and have Siemens reprogram panel which will take several weeks to obtain. The vendor has a projected due date of September 15, 2026 for parts to arrive. Once this is completed and cleared, we will immediately notify the division of life safety and the local field office. Because of vendor limitations, Markley rehabilitation and Healthcare Center is requesting a TLW until September 30, 2026, we will gladly notify you if the project is completed sooner than the date requested. Thank you for your time and consideration in this matter. If you have any questions, please contact Dean McGroaty at 856-912-6141 or at dmcgroatry@Markleyrehab.com
K0345 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: weekly for 4 weeks
0345: Fire Alarm System - Testing and Maintenance: The facility failed to provide documentation verifying semi-annual inspections of the automatic fire alarm system occurred, and to maintain…
View Full Plan Text
K0345 Correction Date: 08/05/2026
0345: Fire Alarm System - Testing and Maintenance: The facility failed to provide documentation verifying semi-annual inspections of the automatic fire alarm system occurred, and to maintain the automatic fire alarm system in a continuously reliable operating manner, which serves the entire component. No residents were affected by this deficient practice. All residents have the potential to be affected.
1. A semi-annual visual inspection of the fire alarm system to be completed and documented by 05AUG2026.
2. Certified Vendor to service Zone 1 smoke detector in generator room by 05AUG2026. Fire alarm system, including smoke detectors, audited by the Maintenance Director/Designee by 05AUG2026 to ensure compliance with the regulation requirements and documented. On 21JUL2026, the Maintenance Director was educated by the Administrator on the importance of completing semi-annual visual inspection of the fire alarm systems per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits semi-annually on ongoing basis to ensure that a semi-annual visual inspection of the fire alarm system is completed. NHA/Designee will audit Life Safety Binder with Maintenance Director to ensure compliance with semi-annual inspection and testing schedule. Results of audits will be reviewed at Quarterly Quality Assurance and Performance Improvement Committee Meeting over the duration of the audit process. Based on the results of these audits, a decision will be made regarding the need for continued submission and reporting.
K0345 · York South Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/30/2026 · Spot-checks: monthly for 4 weeks
Sensitivity Test had been completed 4/29/2026. Paperwork updated. Annual and Semi Annual Inspections of the Installed Fire Alarm Systems have been completed. #1 The Maintenance Director…
View Full Plan Text
K0345 Correction Date: 08/26/2026
Sensitivity Test had been completed 4/29/2026. Paperwork updated. Annual and Semi Annual Inspections of the Installed Fire Alarm Systems have been completed. #1 The Maintenance Director reviewed the Master Fire Alarm Inspection and Testing Schedule upon LSI and will conduct reviews on a monthly basis to verify that all upcoming inspections and tests are properly scheduled and that completed inspections are documented and filed. The Administrator will conduct a quarterly review of all fire alarm inspection and testing records to confirm ongoing compliance with required schedules. Completed inspection reports provided by the licensed contractor will be reviewed upon receipt, filed in the facility's Life Safety binder, and made available for regulatory review at any time. Any lapses in scheduling or documentation will be immediately reported to the Administrator and corrected within 2448 hours of identification. #2 The Maintenance Director will prepare a monthly Fire Alarm Compliance Report documenting the status of all required inspections, completed tests, contractor visits, and any identified deficiencies and their resolutions. Monthly compliance reports will be submitted to the QAPI Committee for review at each quarterly meeting. The QAPI Committee will evaluate the effectiveness of the corrective actions, review trends in compliance, and make recommendations for further process improvements as needed.
K0345 · Lakeland Rehab and Healthcare Center (IN)
Surveyed 06/18/2026 · Spot-checks: monthly for 6 months
Fire Alarm System - Testing and Maintenance The facility requests paper compliance for this citation. This plan of correction is the facility's credible allegation of compliance. Preparation…
View Full Plan Text
K0345
Completion Date: 07/20/2026
K0345 - Fire Alarm System - Testing and Maintenance The facility requests paper compliance for this citation. This plan of correction is the facility's credible allegation of compliance. Preparation and/or execution of this plan of correction does not constitute admission or it is required by the provisions of federal and state law. 1)Immediate actions taken for those residents identified: No resident was found to be affected by the finding. 2)How the facility identified other residents: Visitors, staff, and residents that reside in the community have the potential to be affected by the alleged deficient practice. 3)Measures put into place/System changes Fire Alarm System Contractor was contacted. Quote for repair was received and approved. 4)How the corrective action will be monitored: The Maintenance Director/Designee will check and document in TELS the status of the Fire Alarm Panel Monthly and will present to the QAPI Committee for 6 months during the next QAPI Meeting to ensure completion of any new necessary updates and compliance. The QA Committee 2026
K0345 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/01/2026 · Spot-checks: monthly for 4 weeks
1. The semi-annual inspection was conducted. The "first 4-inch coupling above the test header control valve was repaired so that it would not leak. 2. & 3. There are no other pumps requiring a…
View Full Plan Text
K0345 Correction Date: 07/31/2026
1. The semi-annual inspection was conducted. The "first 4-inch coupling above the test header control valve was repaired so that it would not leak. 2. &
3. There are no other pumps requiring a 4-inch coupling in the facility. The Maintenance Director and staff have been educated on the regulatory requirements for conducting the semi-annual inspection and ensuring the header control valves are in good condition.
4. To prevent recurrence, the Life Safety manual will be reviewed monthly with the Maintenance Director to ensure that inspections are completed in a timely manner.
5. Date of compliance is July 31, 2026.
K0345 · Walnut Creek Nursing and Rehab (PA)
Surveyed 05/20/2026 · Spot-checks: daily for 4 weeks
Facility Maintenance Director has been in contact with vendors to have Jockey pump and controller replacement options quoted. Facility Maintenance Director completes daily fire alarm system…
View Full Plan Text
K0345 Correction Date: 07/16/2026
Facility Maintenance Director has been in contact with vendors to have Jockey pump and controller replacement options quoted. Facility Maintenance Director completes daily fire alarm system panel checks to ensure system functionality. Facility Maintenance Director will ensure Jocky Pump and Controller are replaced and that no other trouble signals are displayed on the fire alarm system panel. Maintenance Director will conduct weekly Audits of the fire alarm panel for trouble signals for twelve weeks to ensure compliance. The results of these audits will be reviewed by the facility quality assurance and process improvement committee until substantial compliance is achieved.
K0345 · Riverstreet Manor (PA)
Surveyed 04/27/2026 · Spot-checks: weekly for 4 weeks
Semi-annual, visual inspection of facility fire alarm system, and sensitivity will be conducted on May 7, 2026. Functional inspection will be performed on May 12, 2026. Future inspections will…
View Full Plan Text
K0345 Correction Date: 06/26/2026
Semi-annual, visual inspection of facility fire alarm system, and sensitivity will be conducted on May 7,
2026. Functional inspection will be performed on May 12,
2026. Future inspections will be monitored through TELS work order system and documentation will be filed in Life Safety Binder
K0345 · Suburban Woods Health & Rehabilitation Center (PA)
Surveyed 03/25/2026 · Spot-checks: monthly for 4 weeks
1. Contractor was contacted immediately to obtain a quote to replace strobe in hall and battery 2. NHA reviewed all Tustin Fire reports in past 30 days to ensure no other deficiencies…
View Full Plan Text
K0345 Correction Date: 05/22/2026
1. Contractor was contacted immediately to obtain a quote to replace strobe in hall and battery
2. NHA reviewed all Tustin Fire reports in past 30 days to ensure no other deficiencies identified on reports were unmet
3. Maintenance Director was educated on ensuring follow up with all inspection reports.
4. All Tustin Fire Service reports will be reviewed monthly x2 for3 months by NHA/designee for any deficiencies. Results will be reviewed and addressed as needed during monthly QAPI.
K0345 · Abbeyville Skilled Nursing and Rehabilitation Center (PA)
Surveyed 03/17/2026 · Spot-checks: monthly for 4 weeks
1. Education provided to the maintenance department on requirements of K345. Sensitivity test, semi annual and annual inspection will be completed by vendor. 2. Audits will be completed…
View Full Plan Text
K0345 Correction Date: 05/13/2026
1. Education provided to the maintenance department on requirements of K345. Sensitivity test, semi annual and annual inspection will be completed by vendor.
2. Audits will be completed monthly x 6 months to ensure required semi-annual testing is complete and all reports received and filed in life safety book.
3. Results of audits will be presented to QAPI committee until substantial compliance is demonstrated.
4. Date of compliance: 5/13/2026
K0345 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
Duct detector head replaced with new by Wesley Enhanced Living's Fire Safety vendor. Device to be rewired, reprogrammed, and tested. Documentation of completion to be procured. Monitored by…
View Full Plan Text
K0345 Correction Date: 05/15/2026
Duct detector head replaced with new by Wesley Enhanced Living's Fire Safety vendor. Device to be rewired, reprogrammed, and tested. Documentation of completion to be procured. Monitored by the Director of Facility Operations during semi-annual inspections of the fire alarm system. This will be reviewed during quarterly Quality Assurance committee meeting that includes the Executive Director/Nursing Home Administrator, Director of Nursing, and Director of Facility Operations.
K0345 · York North Skilled Nursing and Rehabilitation Center (PA)
Surveyed 03/12/2026 · Spot-checks: monthly for 4 weeks
1. Unable to retroactively provide semi-annual fire alarm system reports as reports were not completed. 2. Audit of required semi-annual fire alarm system reports completed to determine if any…
View Full Plan Text
K0345 Correction Date: 03/31/2026
1. Unable to retroactively provide semi-annual fire alarm system reports as reports were not completed.
2. Audit of required semi-annual fire alarm system reports completed to determine if any reports were missing.
3. Education to be completed with Maintenance Director and Maintenance Assistant related to semi-annual fire alarm system reports.
4. Maintenance Director/Designee will conduct monthly audits x 3 quarters to ensure facility system reports are maintained timely. Results will be forwarded to the QAPI committee to determine the need for future follow up/monitoring.
K0345 · Onyx Nursing & Rehabilitation (PA)
Surveyed 03/11/2026 · Spot-checks: weekly for 4 weeks
1. Facility purchased replacement heat senser that was causing the fire alarm panel trouble code. Heat senser was programmed and installed by technician and trouble code cleared on alarm…
View Full Plan Text
K0345 Correction Date: 04/08/2026
Preparation and submission of this Plan of Correction does not constitute an admission or agreement with the facts alleged or conclusions stated in the Statement of Deficiencies. This Plan of Correction is submitted solely because it is required by Federal and State regulations.
1. Facility purchased replacement heat senser that was causing the fire alarm panel trouble code. Heat senser was programmed and installed by technician and trouble code cleared on alarm panel.
2. NHA Educated Maintenance staff on requirements to ensure fire alarm panel is working properly and all trouble codes are addressed as soon as possible.
3. NHA / Designee will conduct audits of fire alarm panel weekly x4 then monthly x2 or until substantial compliance is obtained. ensuring no trouble codes are present and if system has a trouble code it is addressed promptly results will be brought to qapi for further evaluation and recommendation.
K0345 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
The required fire alarm system inspections and testing, including the semi-annual visual inspection and biennial smoke detector sensitivity testing, were completed by a qualified vendor, and…
View Full Plan Text
K0345 Correction Date: 04/27/2026
The required fire alarm system inspections and testing, including the semi-annual visual inspection and biennial smoke detector sensitivity testing, were completed by a qualified vendor, and documentation has been maintained on-site. The ground fault trouble condition on the main fire alarm panel was investigated and repaired, restoring the system to normal operation. A tracking system has been implemented to ensure all required inspections and testing are completed timely. The Maintenance Director or designee will monitor compliance by reviewing fire alarm system service reports and panel status regularly. was completed on march 20, 2026
K0345 · Rest Haven-York (PA)
Surveyed 02/26/2026 · Spot-checks: weekly for 4 weeks
A visual inspection of the fire alarm system has been completed. Director of Operations will inspect the visual inspection of the fire alarm system for compliance maintaining documentation in…
View Full Plan Text
K0345 Correction Date: 04/17/2026
A visual inspection of the fire alarm system has been completed. Director of Operations will inspect the visual inspection of the fire alarm system for compliance maintaining documentation in accordance with an approved program complying with requirements of NFPA 70, National Electric Code, and NFPA 72 National Fire Alarm and Signaling Code. Semi-annual visual inspections have been scheduled. A QA tool will be developed to inspect all semi-annual visual inspections of the fire alarm system to ensure they maintain documentation in accordance with an approved program complying with requirements of NFPA 70, National Electric Code, and NFPA 72 National Fire Alarm and Signaling Code. All findings from the QAs will be reported to the Director of Operations for immediate resolution if needed. The QAPI Committee will review the reports at their quarterly meeting and make recommendations for any deficient patterns identified. Decreasing or elimination of this tool will not occur.