K0232 · Williamsport Nursing and Rehabilitation (IN)
Surveyed 08/11/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0232 →

We respectfully request consideration for a desk review for this plan of correction due to the low number of deficiencies cited and low scope and severity associated with this survey. Any…

View Full Plan Text
K0232 Completion Date: 08/28/2026 We respectfully request consideration for a desk review for this plan of correction due to the low number of deficiencies cited and low scope and severity associated with this survey. Any residents on the 1. a-wing (100 hall) could have been affected by this deficiency. The two benches were removed from the facility. 2. No other residents were ensure that all staff are aware of the need to keep corridors clear and free from obstructions. Maintenance supervisor, 4. or designee, will complete a weekly audit using the "corridor clearance" QAPI tool (see attachment A) to ensure that the corridor remain clear and free from obstructions.Any issues will be corrected immediately, and the audit results will be brought to the QAPI meeting ongoing for discussion and/or resolution. 5. This will be completed by 8/28/26.
K0232 · Majestic Care of McCordsville (IN)
Surveyed 08/11/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0232 →

Corrective Action for the Finding: The facility reviewed the deficiency for Aisle, Corridor or Ramp Width. The facility was found to not have the required corridor width of 48 inches serving…

View Full Plan Text
K0232 Completion Date: 09/30/2026 K232 Corrective Action for the Finding: The facility reviewed the deficiency for Aisle, Corridor or Ramp Width. The facility was found to not have the required corridor width of 48 inches serving as a means of egress. An FSEF evaluation will be conducted for the deficiency in question. Identification of Other Residents/Areas Potentially Affected: An FSES evaluation was conducted on 9/04/2026to ensure the facility receives a passing score with the aisle, corridor, and ramp width. An FSES evaluation will be conducted yearly to determine if the facility is in compliance. Monitoring: The QAPI committee will monitor monthly X 12 months the on-going implementation of current facility policy and procedures to ensure appropriate and consistent implementation, which meet the standards and quality of care needs for the facility and the residents.
K0232 · Arbor Grove Village (IN)
Surveyed 05/27/2026 · Spot-checks: daily for 4 weeks
✓ Passed Re-Inspection Use K0232 →

1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice.…

View Full Plan Text
K0232 Completion Date: 06/25/2026 1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. Bookcase and 2 chairs have been removed from corridor near RR#109 on 5/28/26. (See attachment A) 2. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action will be taken; All residents could potentially be affected by this alleged deficient practice. All staff in-serviced on aisle, corridor or ramp width requirements and securing furniture located in aisleways. into place and what systemic changes will be made to ensure that the deficient practice does not recur; Maintenance director/designee will complete an audit of all corridors using Life Safety Audit/QAPI tool for aisle, corridor and ramps, to ensure areas remain unobstructed and deficient practice will not recur. 4. How the corrective action will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place. Maintenance Director will audit daily (5x week) for 4 weeks, monthly x 6 months, using Life Safety/QAPI Audit tool and thereafter QAPI committee will determine need for further review. The results of these audits will be reviewed by the QAPI committee, if threshold of 100% is not achieved an action plan will be revised/completed.
K0232 · Inglis House (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0232 →

Inglis House is requesting the Pa Division of Life Safety to update the F.S.E.S. for this facility. The Engineering Director or designee will monitor this plan.

View Full Plan Text
K0232 Correction Date: 05/06/2025 Inglis House is requesting the Pa Division of Life Safety to update the F.S.E.S. for this facility. The Engineering Director or designee will monitor this plan.