K0321 · Margaret E. Moul Home (PA)
Surveyed 08/24/2026 · Spot-checks: monthly for 3 months
1. Self-closures have been ordered by Susquehanna Door for all 7 cited hazardous area doors. As soon as the closures are in stock, they will be installed. 2. All facility hazardous area doors…
View Full Plan Text
K0321 Correction Date: 09/30/2026
1. Self-closures have been ordered by Susquehanna Door for all 7 cited hazardous area doors. As soon as the closures are in stock, they will be installed.
2. All facility hazardous area doors will be inspected to ensure proper functioning self-closures are in place and latching properly.
3. Director of Environmental Services or designee will audit hazardous area doors for proper self-closure monthly for 3 months, and then quarterly for 3 quarters. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
K0321 · Concordia at Rp Home (PA)
Surveyed 08/17/2026 · Spot-checks: weekly for 4 weeks
1) Clean Linen Door in Laundry room was repaired by maintenance on day of discovery. Workorder on file with NHA. 2) Doorknob replaced to kitchen storage room on day of discovery. Workorder on…
View Full Plan Text
K0321 Correction Date: 10/01/2026
1) Clean Linen Door in Laundry room was repaired by maintenance on day of discovery. Workorder on file with NHA. 2) Doorknob replaced to kitchen storage room on day of discovery. Workorder on file with NHA. 3) Items removed upon discovery. Dining Service Staff re-educated to requirement. Proof of education on file with NHA. 4) Prop removed from door at mechanical room. Staff re-educated to not prop doors open. Signature sheets on file with NHA of proof of education. 5) QAPI notified of citation and repairs.
K0321 · Asbury Health Center (PA)
Surveyed 08/10/2026 · Spot-checks: weekly for 4 weeks
The boiler room self-closing device will be repaired by POC completion date. All other self-closing doors boiler room doors were inspected and confirmed to be functioning. NHA or designee will…
View Full Plan Text
K0321 Correction Date: 09/16/2026
The boiler room self-closing device will be repaired by POC completion date. All other self-closing doors boiler room doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on boiler door requirements and routine inspections. Maintenance director or designee will audit self-closing boiler doors and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
K0321 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: monthly for 4 weeks
1) The hole in the ceiling, on the Laundry-Dryer side has been repaired. The unsealed penetration of the sprinkler pipe through the wall, in Mechanical resident room has been repaired by an…
View Full Plan Text
K0321 Correction Date: 09/15/2026
1) The hole in the ceiling, on the Laundry-Dryer side has been repaired. The unsealed penetration of the sprinkler pipe through the wall, in Mechanical resident room has been repaired by an approved through penetration fire stop system. 2) Maintenance director to be educated on maintaining the rating of the hazardous areas to be smoke tight, to be in conjunction with the sprinkler heads, in two of four smoke zones within the component. 3) NHA/designee will audit smoke zones to ensure no penetrations are found in hazardous areas; monthly. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
K0321 · John J Kane Regional Center- Ross Township (PA)
Surveyed 07/21/2026 · Spot-checks: daily for 4 weeks
1. The three identified door closure concern areas were corrected. Door E-297 and laundry room closures were readjusted. Cafeteria/Kitchen door closure was replaced. 2. ESM or designee will…
View Full Plan Text
K0321 Correction Date: 08/14/2026
1. The three identified door closure concern areas were corrected. Door E-297 and laundry room closures were readjusted. Cafeteria/Kitchen door closure was replaced.
2. ESM or designee will audit all hazardous area enclosures to ensure proper closure.
3. Staff will be educated on identifying and reporting door closures by staff educator or designee.
4. ESM or designee will audit hazardous area enclosures during environmental rounds daily x1 business week, weekly x3 until substantial compliance is achieved.
5. Date of compliance: 8/14/2026
K0321 · Providence Point Healthcare Residence (PA)
Surveyed 07/06/2026 · Spot-checks: weekly for 8 weeks
1. Penetration in transfer switch room was appropriately sealed on 7/6/2026. 2. All hazardous rooms will be audited each week for 8 weeks to ensure all penetrations are properly sealed. 3.…
View Full Plan Text
K0321 Correction Date: 07/31/2026
1. Penetration in transfer switch room was appropriately sealed on 7/6/2026.
2. All hazardous rooms will be audited each week for 8 weeks to ensure all penetrations are properly sealed.
3. Results of audits will be reported at quarterly QA meetings.
4. EVS Director will be responsible for this plan of correction.
K0321 · Chapel Manor (PA)
Surveyed 06/30/2026 · Spot-checks: weekly for 4 weeks
CHAPEL MANOR HAS REQUESTED A TIME LIMITED WAIVOR FOR BASEMENT LAUNDRY ROOM DOOR WITH A COMPLETION DATE OF 12/29/2026 1. Basement laundry room door (TLW REQUESTED), C wing - Soiled Utility Room…
View Full Plan Text
K0321 Correction Date: 08/12/2026
CHAPEL MANOR HAS REQUESTED A TIME LIMITED WAIVOR FOR BASEMENT LAUNDRY ROOM DOOR WITH A COMPLETION DATE OF 12/29/2026 1.Basement laundry room door (TLW REQUESTED), C wing - Soiled Utility Room doors,D wing - Storage Room, Environmental storage closet and Soiled linen room doors have been repaired to ensure the doors close and latch as designed. Self-closing hardware was installed in the basement storage room doors. 2.NHA will educate the Maintenance department on ensuring that all hazardous area doors close and latch, and have proper hardware installed. 3.NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 monthly to ensure that hazardous area doors close and latch. 4.Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0321 · York South Skilled Nursing and Rehabilitation Center (PA)
Surveyed 06/30/2026 · Spot-checks: monthly for 4 weeks
Time Limited Waiver requested for time to order door and secure vendor. Date for the Time Limited Waiver requested to be 12/31/2026. Locksets have been replaced on the Maintenance Door and…
View Full Plan Text
K0321 Correction Date: 08/26/2026
Time Limited Waiver requested for time to order door and secure vendor. Date for the Time Limited Waiver requested to be 12/31/2026. Locksets have been replaced on the Maintenance Door and Environmental Room Door. Fire rated label/door ordered/replaced by certified personnel. #1 The Maintenance Director will conduct and document an initial facility wide audit and then monthly door/fire door inspections using the facility's standardized checklist to ensure no missing/faulty locksets and fire rated labels in place. The Administrator will review all completed inspection checklists on a monthly basis to verify compliance and ensure that any identified issues are addressed promptly. Findings and corrective actions will be tracked and trended to identify any patterns or recurring concerns. #2 Monthly fire door inspection reports will be submitted to the QAPI Committee for review at each quarterly meeting. The QAPI Committee will review trends, evaluate the effectiveness of corrective actions, and make recommendations for further improvement as needed.
K0321 · Phoebe Allentown Health Care Center (PA)
Surveyed 06/23/2026 · Spot-checks: monthly for 4 weeks
Rear door of the Generator Set room was adjusted to fully latch within the door frame assembly on 07/01/2026. Perform monthly rounds for a quarter to make sure we are compliant and report out…
View Full Plan Text
K0321 Correction Date: 08/03/2026
Rear door of the Generator Set room was adjusted to fully latch within the door frame assembly on 07/01/2026. Perform monthly rounds for a quarter to make sure we are compliant and report out on our findings in our monthly QAPI meeting.
K0321 · Yorkview Nursing and Rehabilitation (PA)
Surveyed 06/09/2026 · Spot-checks: weekly for 4 weeks
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is…
View Full Plan Text
K0321 Correction Date: 07/24/2026
Development and/or execution of this plan of correction does not constitute admission or agreement by this provider of the truth in the statement of deficiency. This plan of correction is prepared and/or executed by provision of Federal or State Law.
1. The 2nd floor Human Resources Payroll Office is no longer used for storage.
2. Additional rated hazardous doors in this smoke compartment will be assessed to ensure the hazardous area doors fully close.
3. The Maintenance Director will complete a quarterly door audit on hazardous area doors to ensure they maintain the allowed gap margin and that they fully close.
4. The Maintenance Director/Designee will audit doors quarterly within this smoke compartment to ensure they fully close. Trends will be reported to the QAPI committee for further action planning.
5. Date of compliance: 7/24/26
K0321 · The Gardens at West Shore (PA)
Surveyed 05/28/2026 · Spot-checks: monthly for 12 months
1. The 2nd floor storage items were discarded and/or removed from the floor. Doors were closed and ceiling tiles were replaced. The 2nd floor will no longer be used as a storage area and…
View Full Plan Text
K0321 Correction Date: 06/19/2026
K0321
1. The 2nd floor storage items were discarded and/or removed from the floor. Doors were closed and ceiling tiles were replaced. The 2nd floor will no longer be used as a storage area and access has been limited to maintenance and security.
2. Maintenance Director/Designee will conduct a walkthrough audit of the 2nd floor to confirm that ceiling tiles are intact, doors are closed, and that no one has placed any storage items on the 2nd floor monthly for 12 months. Results to QAPI.
3. Date of Compliance 6/19/26
K0321 · Embassy of Scranton (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
Storage in rooms 113 and 114 has been removed, and self-closing devices are no longer necessary. The Maintenance Director/designee will audit random resident rooms weekly x 4, then monthly to…
View Full Plan Text
K0321 Correction Date: 06/30/2026
Storage in rooms 113 and 114 has been removed, and self-closing devices are no longer necessary. The Maintenance Director/designee will audit random resident rooms weekly x 4, then monthly to ensure that the rooms are not being used for storage and do not require a self-closing device. These audits will be brought to the monthly QAPI committee meeting for further review and recommendations.
K0321 · Park Lane Post Acute LLC (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
1. The Kitchen Dry Storage door self-closer was repaired. 2. Inspection Audit for self-closer was completed for all doors. 3. The staff will be educated by the Director of Environmental /…
View Full Plan Text
K0321 Correction Date: 06/30/2026
1. The Kitchen Dry Storage door self-closer was repaired.
2. Inspection Audit for self-closer was completed for all doors.
3. The staff will be educated by the Director of Environmental / designee on policy and procedures on how to maintain self-closing doors.
4. Maintenance Director or designee will perform random audits of self-closing doors to ensure they are properly working. Audits will occur weekly x 4 weeks, then monthly thereafter or until compliance is achieved. Any issues with the audits will be presented to QAPI committee for follow-up as needed.
K0321 · The Gardens at Easton (PA)
Surveyed 05/21/2026 · Spot-checks: weekly for 4 weeks
NFPA 101 Hazardous Areas Enclosure 1. New closure system ordered for Annex storage door. Closure system will be replaced and door adjusted to ensure positive latching. 2. Education done with…
View Full Plan Text
K0321 Correction Date: 06/29/2026
K 0321- NFPA 101 Hazardous Areas Enclosure
1. New closure system ordered for Annex storage door. Closure system will be replaced and door adjusted to ensure positive latching.
2. Education done with maintenance department- All doors must be positive latching in compliance with NFPA 101
3. Weekly audit of facility doors x4 weeks then monthly x2 months to ensure positive latching.
4. Report findings to QAPI
K0321 · Luther Crest Nursing Facility (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 4 weeks
1. The Housekeeping storage room door was adjusted to fully latch by the maintenance director on 5/19/2026.
View Full Plan Text
K0321 Correction Date: 06/05/2026
1. The Housekeeping storage room door was adjusted to fully latch by the maintenance director on 5/19/2026.