K0131 · Phoebe Allentown Health Care Center (PA)
Surveyed 06/23/2026 · Spot-checks: monthly for 4 weeks
Door latching was corrected on 07/01/2026 and is fully latching within the door frame assembly. Education for staff in procedures for inspecting fire and smoke door assemblies to be completed…
View Full Plan Text
K0131 Correction Date: 08/03/2026
Door latching was corrected on 07/01/2026 and is fully latching within the door frame assembly. Education for staff in procedures for inspecting fire and smoke door assemblies to be completed by 8/03/26. Perform monthly rounds for a quarter to make sure we are compliant and report out on our findings in our monthly QAPI meeting.
K0131 · Holy Family Home (PA)
Surveyed 04/06/2026 · Spot-checks: weekly for 4 weeks
1. The facility corrected the deficient penetrations by installing a UL-listed through-penetration firestop system (UL System No. W-L-3001), tested in accordance with UL 1479, appropriate for…
View Full Plan Text
K0131 Correction Date: 05/13/2026
1. The facility corrected the deficient penetrations by installing a UL-listed through-penetration firestop system (UL System No. W-L-3001), tested in accordance with UL 1479, appropriate for the construction of concrete wall and penetrating cable bundles. Installation was completed in accordance with the manufacturer's instructions and UL design specifications.
2. The Maintenance Director will ensure a full inspection of any work done where fire wall is penetrated to ensure penetration is properly sealed.
K0131 · Champion City Nursing and Rehabilitation Center (PA)
Surveyed 03/30/2026 · Spot-checks: weekly for 4 weeks
Door closer reinstalled on the door that separates the Skilled Nursing and Personal Care Home. All door closers will be checked weekly x 3 and monthly x 12. Findings will be reported to QAA…
View Full Plan Text
K0131 Correction Date: 05/01/2026
Door closer reinstalled on the door that separates the Skilled Nursing and Personal Care Home. All door closers will be checked weekly x 3 and monthly x
12. Findings will be reported to QAA for further review and monitoring.
K0131 · Homestead Village, Inc. (PA)
Surveyed 03/24/2026 · Spot-checks: monthly for 4 weeks
Facility failed to maintain the smoke resistance of the smoke barrier wall within the Radcliffe bathing Spa around fire alarm wiring and administrative area. Fire barrier non-compliance was…
View Full Plan Text
K0131 Correction Date: 04/30/2026
Facility failed to maintain the smoke resistance of the smoke barrier wall within the Radcliffe bathing Spa around fire alarm wiring and administrative area. Fire barrier non-compliance was corrected and repairs have been completed to seal the penetrations with an approved through penetration fire stop system to maintain the rating of the smoke barrier walls. Maintenance and Renovations staff are being educated on the importance of sealing penetrations with an approved through penetration fire stop system to maintain rating of the smoke farrier wall and the need to communicate this requirement to authorized contractors. Maintenance Manager or his/her designee will complete ongoing monthly audits to 4 various sections of the ceiling through the facility and any projects within the facility ceiling prior to completion of project to ensure compliance. Discovered penetrations will be addressed immediately. Findings of the monthly audit and ending project audit will be reported to and reviewed by Director of Facilities and Nursing Home Administrator.
K0131 · Embassy of Hearthside (PA)
Surveyed 02/09/2026 · Spot-checks: monthly for 4 weeks
The common wall door gap was reduced to less than 1/8 inch by adjusting the door latch. Subsequent inspections will be scheduled and monitored via TELS preventive maintenance system. Results…
View Full Plan Text
K0131 Correction Date: 03/30/2026
The common wall door gap was reduced to less than 1/8 inch by adjusting the door latch. Subsequent inspections will be scheduled and monitored via TELS preventive maintenance system. Results will be shared at the next monthly QAPI meeting.
K0131 · Riverton Rehabilitation and Healthcare Center (PA)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
1) Third floor common room sign was corrected. 2) An initial audit was completed of signage on 3rd floor. Variances were addressed at the time of the audit and placed on the facility audit…
View Full Plan Text
K0131 Correction Date: 01/06/2026
1) Third floor common room sign was corrected. 2) An initial audit was completed of signage on 3rd floor. Variances were addressed at the time of the audit and placed on the facility audit tool. 3) The Maintenance Director/Designee re-educated maintenance staff of the Policy and Procedure for facility signage. 4) The Maintenance Director/Designee will complete random audits of 3rd floor signage three times per week for two weeks, weekly for four weeks and monthly for two months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendations as needed.
K0131 · Capitol Rehabilitation and Healthcare Center (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
1. The fire exit hardware will be installed on the double doors within the building separating the common wall. 2. The Plant Operations staff will be educated on the need for completeness and…
View Full Plan Text
K0131 Correction Date: 01/13/2026
1. The fire exit hardware will be installed on the double doors within the building separating the common wall.
2. The Plant Operations staff will be educated on the need for completeness and installation of fire exit hardware.
3. Five random audits will be completed weekly for four weeks then monthly for three months and then quarterly for a full year on the installation and completeness of fire exit hardware. All audits will be shared with the QAPI committee for further recommendations.
K0131 · Homeland Center (PA)
Surveyed 08/05/2025 · Spot-checks: weekly for 4 weeks
Preparation and submission of this Plan of Correction is required by state and federal law. This plan does not constitute admission for purposes of general liability, professional malpractice,…
View Full Plan Text
K0131 Correction Date: 09/15/2025
Preparation and submission of this Plan of Correction is required by state and federal law. This plan does not constitute admission for purposes of general liability, professional malpractice, or any other court proceeding. The observation on August 5, 2025, revealed the first-floor door, within the building separating common wall, by the Admission's Office, failed to positively latch in the frame due to a misaligned door catch in top of door frame. The door catch at top of door frame was adjusted on August 5, 2025, resulting in door positively latching, and is now confirmed to be functioning as designed. Qualified maintenance staff will perform inspection of all facility doors that maintain the fire resistance of building separating common walls monthly, documenting the results, to ensure compliance. This will occur on a permanent basis. Quality Assurance Performance Improvement (QAPI) Performance Improvement Plan (PIP) will be created to ensure, on an on-going basis, all doors positively latch in the frame associated to facility doors that maintain the fire resistance of building separating common walls. This will occur monthly by inspecting the documentation completed by the maintenance staff, and inspecting all associated doors throughout the facility. The results of the plan will be provided at the weekly QAPI meeting. If it is determined the plan is not accomplishing compliance, the plan will be modified to achieve compliance. This will occur on a permanent basis. The Administrator, Director of Maintenance/Emergency Preparedness/Purchasing, and Director of QAPI will be responsible for on-going compliance.
K0131 · Holy Family Manor (PA)
Surveyed 07/28/2025 · Spot-checks: weekly for 4 weeks
Common wall door was re-adjusted to fully latch and is working properly. A team member from the maintenance department will audit the doors for proper working order for the next month and the…
View Full Plan Text
K0131 Correction Date: 08/16/2025
Common wall door was re-adjusted to fully latch and is working properly. A team member from the maintenance department will audit the doors for proper working order for the next month and the Maintenance director will then report out on the findings during our QAPI meeting.
K0131 · Country Meadows Nursing Center of Bethlehem (PA)
Surveyed 07/24/2025 · Spot-checks: weekly for 4 weeks
1. The common wall between 5-2 and 4-2 was sealed with an approved UL stop gap penetration system on 7/25/25. The dish room door's spring loaded hinges will be adjusted to create a positive…
View Full Plan Text
K0131 Correction Date: 09/10/2025
1. The common wall between 5-2 and 4-2 was sealed with an approved UL stop gap penetration system on 7/25/25. The dish room door's spring loaded hinges will be adjusted to create a positive latch.
2. Director of Maintenance or designee will provide education to maintenance team and dietary team on requirements of common walls to maintain a minimum two-hour fire resistance rating.
3. General Maintenance or designee will complete a onetime audit of all common walls that must maintain a minimum two-hour fire resistance rating to identify any other deficiencies. Any additional identified deficiencies will be repaired.
K0131 · Asbury Health Center (PA)
Surveyed 06/17/2025 · Spot-checks: monthly for 2 months
The door latch was repaired on 6/18/25. An astragal was attached to the door to close the gap properly. Maintenance Director or designee will perform an audit to ensure the door closes…
View Full Plan Text
K0131 Correction Date: 07/08/2025
The door latch was repaired on 6/18/25. An astragal was attached to the door to close the gap properly. Maintenance Director or designee will perform an audit to ensure the door closes properly monthly for 2 months.
K0131 · Accela Rehab and Care Center at Somerton (PA)
Surveyed 03/18/2025 · Spot-checks: weekly for 4 weeks
Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies.…
View Full Plan Text
K0131 Correction Date: 05/12/2025
Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed with federal and state law requirements. Identification of other residents or areas having the potential to be affected due to the nature of the deficiency: The deficient practice has the potential to affect all residents. Corrective action
1. Fire door on D wing bottom latching device repaired.
2. Maintenance director or designee to re-educate maintenance staff on the importance of maintaining fire resistance rating of fire doors.
3. Maintenance director or designee to audit D wing fire doors for bottom latching devices.
4. Results will be reviewed at the quarterly QAPI meeting.
K0131 · Care Pavilion Nursing and Rehabilitation Center (PA)
Surveyed 02/18/2025 · Spot-checks: weekly for 4 weeks
Lower-level fire door #4 repaired to ensure proper closure and function. Lower-level conduit penetration above fire door #4 was repaired with UL system W-L -3195 around conduit. An audit was…
View Full Plan Text
K0131 Correction Date: 04/04/2025
Lower-level fire door #4 repaired to ensure proper closure and function. Lower-level conduit penetration above fire door #4 was repaired with UL system W-L -3195 around conduit. An audit was completed of lower-level fire doors to ensure proper closure and function. Where lower-level fire doors were found not to properly close and function, they were repaired to ensure proper closure and function. An audit was completed above all lower-level fire doors to ensure identification of any conduit penetrations with non-UL systems. Where any conduit penetrations were identified with non-UL systems, they were repaired with UL system W-L -3195. Maintenance staff were educated to ensure they know how to assess proper fire door closure and function and how to repair fire doors when they find them not to properly close and function. Maintenance staff were educated to ensure that they know how to identify non-UL systems for penetrations and that they must use UL systems to seal any penetrations. Lower-level fire doors will be tested for proper closure and function weekly x 4 weeks and then monthly x 2 months and results of test will be reported during the monthly Safety Committee Meeting for any necessary recommendations for improvement. If any non-UL systems are identified x 3 months, the findings will be reported during the monthly Safety Meeting for necessary recommendations for improvements.
K0131 · Country Meadows Nursing Center of Bethlehem (PA)
Surveyed 08/27/2026 · Spot-checks: weekly for 4 weeks
1. A door sweep will be installed to the bottom of the common wall door with the Dietary Building, to maintain the minimum two-hour fire resistance rating. 2. The maintenance director will…
View Full Plan Text
K0131 Correction Date: 10/06/2026
1. A door sweep will be installed to the bottom of the common wall door with the Dietary Building, to maintain the minimum two-hour fire resistance rating.
2. The maintenance director will provide education to the maintenance department on maintaining common walls between multiple occupancies.
3. The maintenance designee will conduct a onetime inspection of the entire facilities' common wall doors will be conducted to determine if any other like areas are not maintained. If any other like areas are identified, they will be repaired therein.
K0131 · Conemaugh Memorial Medical Center Transitional Care Unit (PA)
Surveyed 02/26/2025 · Spot-checks: weekly for 4 weeks
Sustainability will be achieved through Facility rounding. An example of expectations include verifying Door Program. All smoke and Fire Doors will be check quarterly to clearance issues.…
View Full Plan Text
K0131 Correction Date: 02/27/2025
Sustainability will be achieved through Facility rounding. An example of expectations include verifying Door Program. All smoke and Fire Doors will be check quarterly to clearance issues. Verification and follow-up will occur on the next scheduled rounds. Rounds are expected quarterly. Status will be reported at TCU Quality Assurance and Performance Improvement Committee meeting. This work was completed 2/27/2025.