Corrective Action for the Finding: The facility reviewed the deficiency of Sprinkler System - Maintenance and Testing. The water storage tank will need to have temperature tested weekly to…
Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
2,041 Verified Plans
Browse 5,700+ State Guides →
K0353 · Majestic Care of McCordsville (IN)
Surveyed 08/11/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection
Use K0353 →
K0353
Completion Date: 09/30/2026
K353 Corrective Action for the Finding: The facility reviewed the deficiency of Sprinkler System - Maintenance and Testing. The water storage tank will need to have temperature tested weekly to ensure the proper water temperature. The storage tank interior shall be inspected every 3 -yrs for signs of pitting, corrosion, spalling, rot, and other forms of deterioration. Identification of Other Residents/Areas Potentially Affected: All residents, staff and visitors have the potential to be affected but none were identified. Systemic Correction: Pittsburgh Tank & Tower Group will complete an inspection of the tank on or before 9/30/2026. Documentation will be provided in TELS that service has been performed and completed. Monitoring:
K0353 · Richland Bean Blossom Health Care Center (IN)
Surveyed 04/27/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection
Use K0353 →
A maintenance records review was conducted for the timely completion of the weekly dry sprinkler gauge inspection documentation. All residents in the facility have the potential to be affected…
View Full Plan Text
K0353 A maintenance records review was conducted for the timely completion of the weekly dry sprinkler gauge inspection documentation. All residents in the facility have the potential to be affected by a deficiency in this practice. The TELS System will be utilized weekly for timely completion of all tasks with documentation completed and retained for records. Re-education has been conducted with the Maintenance Director and Maintenance Assistant. as well as confirmation that all suspended ceiling tiles are in place will be performed by the Maintenance Director or designee monthly x 6 months or until 100% compliance is achieved. Results of these audits will be presented to the QA committee, and any recommendations for changes or updates by the QA committee will be put into place as indicated. These systemic changes will be in place on or before 05/30/2026
K0353 · Brickyard Healthcare - Twelfth Street Care Center (IN)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection
Use K0353 →
A weekly wet sprinkler gauge check was initiated with 1 wet pressure gauge reading. A weekly wet sprinkler valve check was affected by this alleged deficient practice. A weekly TELS task was…
View Full Plan Text
K0353
Completion Date: 02/03/2026
A weekly wet sprinkler gauge check was initiated with 1 wet pressure gauge reading. A weekly wet sprinkler valve check was affected by this alleged deficient practice. A weekly TELS task was added to Ensure that the wet sprinkler system valve is in the open position. A weekly Task was added to TELS for a wet sprinkler gauge check with a log for the sprinkler gauge reading. A weekly task was added to TELS to Monitor and record the pressure readings on the gauges to ensure that normal air and water pressures are being maintained. Insert values on log. Inspect the condition of the gauges to verify there are no leaks or evidence of tampering. A weekly dry sprinkler gauge check was added to TELS to Verify dry system sprinkler valve is in the open position and free from defects. Closing this task is receipt of completion of inspection. Maintenance will report to QAPI no less than quarterly in perpetuity regarding life safety issues.
K0353 · The Waters of Huntington Skilled Nursing Facility (IN)
Surveyed 09/24/2026 · Spot-checks: monthly for 4 weeks
Approved Filing
Use K0353 →
It is the intent of the facility to ensure to maintain automatic sprinkler systems in accordance with NFPA 25 to meet set standards. 1. CORRECTIVE ACTIONS TAKEN: 1. On 10/15/2026 the…
View Full Plan Text
K353 It is the intent of the facility to ensure to maintain automatic sprinkler systems in accordance with NFPA 25 to meet set standards.
1. CORRECTIVE ACTIONS TAKEN:
1. On 10/15/2026 the facilities licensed elements dated 1980 and documented this in the life safety binder to meet set standards. The Administrator verified the work on 10/15/2026. ALL OTHERS WITH
2. POTENTIAL TO BE AFFECTED:
1. All residents and all staff and visitors have the potential to be affected but none were.
3. MEASURES TO PREVENT REOCCURRENCE:
1. On 10/15/2026 the Administrator in serviced the Maintenance Supervisor/designee to ensure the sprinkler system is maintained and sprinkler heads are tested/replaced to meet set standards. Maintenance
2. Supervisor/designee will ensure the sprinkler system is maintained and sprinkler heads are tested/replaced as a part of the facility's annual Preventive resolved immediately. The Maintenance Supervisor/designee will review with the Administrator the inspection results. The Administrator will 3. monitor adherence to the Preventative Maintenance schedule and validate the Preventative Maintenance documentation is in place.
4. MONITORING CORRECTIVE ACTION:
1. The inspection results will be presented by the Maintenance Supervisor/designee to the Administrator when required and the Administrator will present the inspection results at the monthly Quality Assurance/Performan ce Improvement (QA/PI) meeting. Inspection results and system components will be reviewed by the QA/PI Committee with subsequent plans of correction This plan of correction constitutes our credible allegation of compliance with all regulatory requirements. Our date of compliance is 10/15/2026.