Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
Federal CMS Precedents Shown for Indiana: CMS SOM § 7304 Plan-of-Correction rules apply nationwide. Below are verified Passed-Revisit examples you can adapt for Indiana, or view local county stats in
Indiana State Guides →
K0291 · Concordia at Rp Home (PA)
Surveyed 08/17/2026 · Spot-checks: weekly for 4 weeks
1) 90-Minute emergency test will be completed in September 2026 and then scheduled annually thereafter. Workorder on file with NHA 2) Maintenance Director re-educated to requirement for…
View Full Plan Text
K0291 Correction Date: 10/01/2026
1) 90-Minute emergency test will be completed in September 2026 and then scheduled annually thereafter. Workorder on file with NHA 2) Maintenance Director re-educated to requirement for 90-Minute emergency test for battery back-up. 3) Reported to QAPI Committee
K0291 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
0291: Emergency Lighting: The facility failed to provide documentation verifying monthly testing of battery back-up emergency lighting fixtures had occurred, within the previous twelve months.…
View Full Plan Text
K0291 Correction Date: 08/05/2026
0291: Emergency Lighting: The facility failed to provide documentation verifying monthly testing of battery back-up emergency lighting fixtures had occurred, within the previous twelve months. No residents were identified. All residents have the potential to be affected. A 90-minute test to reset the battery operated light testing cycle was completed by 05AUG2026 to confirm functioning. Facility wide audit was completed by the Maintenance Director/Designee on 09JUL2026 to ensure that all emergency lighting fixtures were operating during testing of the batter back up test. 21JUL2026, NHA educated the Maintenance Director on the importance of maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct quarterly compliance audits for 30 second testing monthly, and 90 minute testing annually to ensure that documentation of battery back-up emergency lighting fixtures meet the requirements. NHA/Designee will audit Life Safety Binder with Maintenance Director Quarterly to confirm test results have been scheduled and/or filed. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations
K0291 · Concordia at Spiritrust Luther Ridge (PA)
Surveyed 06/24/2026 · Spot-checks: weekly for 3 months
Immediately we implemented a section on our weekly generator testing sheet to include emergency lighting checks for monthly and yearly testing. Emergency lighting checks will be completed…
View Full Plan Text
K0291 Correction Date: 08/21/2026
Immediately we implemented a section on our weekly generator testing sheet to include emergency lighting checks for monthly and yearly testing. Emergency lighting checks will be completed every month within the beginning of the month. An audit will be conducted monthly for 3 months and quarterly thereafter. Any findings will be reported in QAPI.
K0291 · Woodhaven Health & Rehab Center (PA)
Surveyed 05/28/2026 · Spot-checks: weekly for 4 weeks
Director of Maintenance completed the annual 90 minute test of battery back-up emergency lighting. To prevent the reoccurrence the Director of Maintenance was educated on the importance of…
View Full Plan Text
K0291 Correction Date: 07/01/2026
Director of Maintenance completed the annual 90 minute test of battery back-up emergency lighting. To prevent the reoccurrence the Director of Maintenance was educated on the importance of completing the annual 90 minute test of battery back-up emergency lighting by the Nursing Home Administrator. To monitor and maintain on-going compliance the Director of Maintenance/designee will complete weekly audits x4 and monthly audits x1 to ensure the annual 90 minute test of battery back-up emergency lighting is maintained appropriately. Results will be taken to QAPI for review and revision as needed.
K0291 · Chambersburg Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/18/2026 · Spot-checks: weekly for 2 months
1. and2. Maintenance Director has completed monthly inspection of emergency lighting fixtures since April 2026 to current. 3. Maintenance department will be educated on the standards of…
View Full Plan Text
K0291 Correction Date: 06/19/2026
1.and2. Maintenance Director has completed monthly inspection of emergency lighting fixtures since April 2026 to current.
3. Maintenance department will be educated on the standards of ensuring the facility has completed the monthly inspection of emergency lighting fixtures.
4. Maintenance or facility designee will audit the facilities monthly inspection of emergency lighting weekly for 2 months, then every 60 days throughout the year and results of the audit will be reported to the QAPI committee.
K0291 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. The Zone 6 battery back-up emergency lighting fixture located across from the Women's Room was repaired or replaced and tested to verify proper operation for the required emergency…
View Full Plan Text
K0291 Correction Date: 06/25/2026
1. The Zone 6 battery back-up emergency lighting fixture located across from the Women's Room was repaired or replaced and tested to verify proper operation for the required emergency duration.
2. The Director of Plant Operations, or designee, conducted a facility-wide inspection and operational test of all battery back-up emergency lighting fixtures to verify proper operation. Any deficient fixtures identified during the inspection were repaired or replaced.
3. Maintenance staff were re-educated regarding emergency lighting inspection, testing, and documentation requirements.
4. The Director of Plant Operations, or designee, will: - Review monthly emergency lighting inspection logs for completeness and compliance. - Conduct periodic audits of emergency lighting fixtures and documentation. - Report findings through the facility's Quality Assurance and Performance Improvement (QAPI) process for a minimum of three months, then quarterly thereafter. Any identified deficiencies will be corrected immediately.
K0291 · Rose City Nursing and Rehab at Lancaster (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. Facility performed annual 90 minute test on the installed battery back up emergency lighting systems on May 22, 2026. 2. Maintenance Director, or designee, will perform annual testing when…
View Full Plan Text
K0291 Correction Date: 06/30/2026
1. Facility performed annual 90 minute test on the installed battery back up emergency lighting systems on May 22, 2026.
2. Maintenance Director, or designee, will perform annual testing when due. Record of testing will be entered into TELS system and placed in facility Life Safety Book for documentation. Record will be submitted to monthly for QAPI review and recommendations.
K0291 · Pleasant Acres Rehabilitation and Nursing Center (PA)
Surveyed 04/21/2026 · Spot-checks: monthly for 4 weeks
This provided submits the following plan of correction in good faith and to comply with Federal regulations. This plan is not an admission of wrong doing nor does it reflect agreement with the…
View Full Plan Text
K0291 Correction Date: 06/04/2026
This provided submits the following plan of correction in good faith and to comply with Federal regulations. This plan is not an admission of wrong doing nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies. On April 23rd, 2026 the emergency battery backup lighting in the Emergency Generator Building had its batteries changed and is now operational. The maintenance department will be in-serviced by NHA/designee on the importance of testing and ensuring emergency lighting is operational. A Monthly audit will be performed by the Maintenance Director or designee to test emergency lighting in Emergency Generator Building Results of the audits will be reviewed/reported to QA committee to determine trends, compliance. QA committee will determine need for continuance of audits.
K0291 · Pocopson Home (PA)
Surveyed 04/01/2026 · Spot-checks: weekly for 4 weeks
1. Maintenance installed new exit signage at the west end of the basement-level exit access corridor. The Maintenance department will monitor exit signage weekly during rounds. Audit results…
View Full Plan Text
K0291 Correction Date: 04/02/2026
1. Maintenance installed new exit signage at the west end of the basement-level exit access corridor. The Maintenance department will monitor exit signage weekly during rounds. Audit results will be reported to the Quality Improvement/Infection Control Committee. Preparation and submission of this Plan of Correction is required by State and Federal law. This Plan of Correction does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding.
K0291 · Immaculate Mary Center for Rehabilitation & Healthcare (PA)
Surveyed 04/01/2026 · Spot-checks: monthly for 4 weeks
It is the practice of the facility to have proper backup lighting on all exit discharge paths, and all residents had the potential to be affected by this deficiency. 1. Facility has replaced…
View Full Plan Text
K0291 Correction Date: 05/08/2026
It is the practice of the facility to have proper backup lighting on all exit discharge paths, and all residents had the potential to be affected by this deficiency.
1. Facility has replaced the battery backup light by the the alter exit door is now functioning as per the design.
2. All battery backup lighting has been tested on 4/02/2026 and is functioning as per the design. All resident areas are free from hazard, and all systems are operating as designed. 3.The Director of Maintenance has completed education and training with Maintenance staff on testing battery backup lighting for proper function.
4. Every quarter for a year the Maintenance Director or designee will complete testing of battery backup lights. This information will then be entered on a log and will be presented by the director to the monthly QAPI meeting for one year.
K0291 · Transitions Healthcare Washington PA (PA)
Surveyed 03/30/2026 · Spot-checks: weekly for 4 weeks
An annual 90-minute emergency lighting one instance test was completed on 4/6/2026 Education will be provided by the NHA to the Maintenance Director on 90-minute emergency lighting one…
View Full Plan Text
K0291 Correction Date: 04/21/2026
An annual 90-minute emergency lighting one instance test was completed on 4/6/2026 Education will be provided by the NHA to the Maintenance Director on 90-minute emergency lighting one instance test. This task will be added to the TELS system to ensure timely completion. An audit of annual 90-minute emergency lighting, one instance testing will be completed by the Maintenance director and taken to the safety committee meeting annually. Results of audits will be taken to QAPI for review of findings and further interventions if warranted
K0291 · Abbeyville Skilled Nursing and Rehabilitation Center (PA)
Surveyed 03/17/2026 · Spot-checks: weekly for 4 weeks
1. Education provided to maintenance department on requirements of K291 as it pertains to emergency lighting/battery back ups. The emergency lighting for boiler/transfer room transfer switch…
View Full Plan Text
K0291 Correction Date: 05/13/2026
1. Education provided to maintenance department on requirements of K291 as it pertains to emergency lighting/battery back ups. The emergency lighting for boiler/transfer room transfer switch and exterior generator will be re-wired into regular power supply with battery backups. 2.Audits of emergency lighting in these areas will be conducted weekly x 4 weeks and then monthly x 2 weeks to ensure proper function.
3. Audits will be brought to QAPI committee until substantial compliance is demonstrated.
4. Date of compliance: 5/13/2026
K0291 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: monthly for 4 weeks
The required annual 90-minute test and monthly 30-second tests, and documentation logs were implemented and updated. A tracking system has been established to ensure all required testing is…
View Full Plan Text
K0291 Correction Date: 04/27/2026
the required annual 90-minute test and monthly 30-second tests, and documentation logs were implemented and updated. A tracking system has been established to ensure all required testing is completed and documented timely. The Maintenance Director or designee will monitor compliance by reviewing emergency lighting testing logs monthly.
K0291 · Manatawny Center for Rehabilitation and Nursing (PA)
Surveyed 03/04/2026 · Spot-checks: monthly for 4 weeks
1. The Maintenance Director has scheduled and completed monthly and annual testing of all battery-powered emergency lighting sources throughout the Adult Day Care Building. Monthly 30-second…
View Full Plan Text
K0291 Correction Date: 03/31/2026
1.The Maintenance Director has scheduled and completed monthly and annual testing of all battery-powered emergency lighting sources throughout the Adult Day Care Building. Monthly 30-second functional tests and annual 90-minute tests will be performed going forward and documented in the Life Safety Book. 2.The Maintenance Director and relevant staff members will be educated on NFPA 101 Emergency Lighting requirements, with specific focus on the requirement for monthly 30-second tests and annual 90-minute tests of battery-powered emergency lighting units. 3.The Maintenance Director/designee will conduct monthly functional tests of all battery-powered emergency lighting units, documenting results in the Life Safety Book. The NHA/designee will review the documentation during monthly audits to verify compliance with testing requirements. 4.Findings will be reviewed at the Quality Assurance Performance Improvement meeting
K0291 · Rest Haven-York (PA)
Surveyed 02/26/2026 · Spot-checks: monthly for 4 weeks
Emergency battery back up and hard-wired lighting has been installed in the Electrical Room, transfer switch. Emergency battery back up and hard-wired lighting has been installed in the back…
View Full Plan Text
K0291 Correction Date: 04/17/2026
Emergency battery back up and hard-wired lighting has been installed in the Electrical Room, transfer switch. Emergency battery back up and hard-wired lighting has been installed in the back porch area, exterior generator. Director of Operations or designee will check all emergency lighting in the facility for proper lighting and installment. A QA tool will be developed to inspect all emergency lighting monthly to ensure they are in accordance with 7.9.18.2.9.1 and 19.2.9.1. All findings from the QAs will be reported to the Director of Operations for immediate resolution if needed. The QAPI Committee will review the reports at their quarterly meeting and make recommendations for any deficient patterns identified. Decreasing or elimination of this tool will not occur.