K0271 · Country Meadows Nursing Center of Bethlehem (PA)
Surveyed 07/24/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0271 →

1. EciService was onsite 7/29/2025 to conduct minor repairs to the A hall door for the time being, to allow the door to open with little force as it normally should. Repairs included sanding…

View Full Plan Text
K0271 Correction Date: 09/10/2025 1. EciService was onsite 7/29/2025 to conduct minor repairs to the A hall door for the time being, to allow the door to open with little force as it normally should. Repairs included sanding the top of the door as well as the bottom sides of the frame where the rust had accumulated heavier. The door is now working freely. EciService reports the A Hall Door replacement should deliver within the next 2-3 weeks. Upon receival, EciService will come back onsite to replace the door completely. 2. Director of Maintenance or designee will provide education to maintenance team on requirements of exits being maintained free of obstruction. 3. General Maintenance or designee will complete a onetime audit of all exits to identify any other deficiencies regarding obstructions. Any additional identified deficiencies will be repaired.
K0271 · Onyx Nursing & Rehabilitation (PA)
Surveyed 05/27/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0271 →

1. Maintenance Director Locked Door and added proper directional Signage to direct traffic to proper discharging door. 2. Facility wide audit was completed ensuring that all emergency egresses…

View Full Plan Text
K0271 Correction Date: 07/01/2025 1. Maintenance Director Locked Door and added proper directional Signage to direct traffic to proper discharging door. 2. Facility wide audit was completed ensuring that all emergency egresses are free of obstructions. 3. Maintenance Director was educated on requirements to ensure emergency egresses are free of obstruction. 4. Maintenance Director/ Designee will audit emergency egresses Weekly x 4 then monthly x 2 to ensure emergency egresses have directional signage posted and are free from obstructions.
K0271 · Quality Life Services - New Castle (PA)
Surveyed 05/15/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0271 →

Facility completed weekly visual inspection and signs placed on doors making it a non emergency exist. Maintenance Director educated on egress. Maintenance director or designee will audit…

View Full Plan Text
K0271 Correction Date: 07/01/2025 Facility completed weekly visual inspection and signs placed on doors making it a non emergency exist. Maintenance Director educated on egress. Maintenance director or designee will audit Emergency exists once a week for 4 weeks. Results will be brought to QAPI for review.
K0271 · Kadima Rehabilitation & Nursing at New Castle (PA)
Surveyed 05/12/2026 · Spot-checks: monthly for 4 weeks
Approved Filing Use K0271 →

Corrective Action The cited deficiencies were corrected immediately following identification. A. The broken concrete and wood debris obstructing the kitchen exit discharge were removed, and…

View Full Plan Text
K0271 Correction Date: 07/07/2026 Corrective Action The cited deficiencies were corrected immediately following identification. A. The broken concrete and wood debris obstructing the kitchen exit discharge were removed, and the exit discharge pathway was restored to provide a clear, unobstructed all-weather, hard-packed travel surface. B. The uneven transition at the west resident corridor exit discharge was repaired, eliminating the drop-off and restoring a safe, even all-weather, hard-packed travel surface suitable for emergency egress. Both exit discharge locations were inspected following repairs and verified to provide unobstructed and safe passage to the public way by the facility administrator and director of maintenance. Identification of Other Areas The Maintenance Director conducted a review of all facility exit discharge pathways, ramps, sidewalks, and designated egress routes to identify any additional conditions that could impede emergency evacuation or create uneven walking surfaces. Any concerns identified during the review were addressed appropriately. Measures to Prevent Recurrence The facility has reinforced procedures requiring routine inspection of all exit discharge areas, sidewalks, ramps, and exterior egress pathways to ensure they remain unobstructed, properly maintained, and compliant with NFPA 101 requirements. Maintenance staff have been educated regarding the importance of maintaining exit discharge pathways free of obstructions and surface defects that could impede evacuation during an emergency. Exit discharge pathways will be included as part of the facility's routine environmental and life safety rounds. Monitoring The Maintenance Director or designee will conduct and document monthly inspections of all exit discharge pathways, ramps, sidewalks, and exterior egress routes for a period of twelve (12) months to verify continued compliance. Any identified deficiencies will be corrected immediately. Inspection findings will be reported quarterly to the facility's Quality Assurance and Performance Improvement (QAPI) Committee for review and follow-up as necessary.