K0541 · Graduate Post Acute (PA)
Surveyed 08/11/2026 · Spot-checks: monthly for 4 weeks
1. A self-closing device was installed on the first-floor linen chute door. The door was adjusted and tested to ensure it fully self-closed and positively latched. 2. The Maintenance…
View Full Plan Text
K0541 Correction Date: 09/23/2026
1. A self-closing device was installed on the first-floor linen chute door. The door was adjusted and tested to ensure it fully self-closed and positively latched.
2. The Maintenance Director/designee inspected all linen and laundry chute doors throughout the facility. Identified deficiencies were immediately corrected.
3. Maintenance staff were educated on inspecting, testing, and maintaining linen and laundry chute doors, including self-closing and positive-latching functionality.
4. The Maintenance Director/designee will audit all linen and laundry chute doors monthly for three months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
K0541 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 07/15/2026 · Spot-checks: monthly for 4 weeks
The trash chute door on the third floor positively latches. Trash chute doors in the facility have the potential to be effected. Maintenance will be educated on maintaining Trash Chute doors…
View Full Plan Text
K0541 Correction Date: 09/01/2026
The trash chute door on the third floor positively latches. Trash chute doors in the facility have the potential to be effected. Maintenance will be educated on maintaining Trash Chute doors Random audits will be conducted by the Maintenance or designee to ensure trash Chutes are maintained Monthly x2 with reports to QAPI
K0541 · Germantown Home (PA)
Surveyed 07/01/2026 · Spot-checks: daily for 4 weeks
During annual Life Safety Survey, the ground floor linen chute access room door did not positively latch. All linen/trash room doors were checked and all others positively latched during…
View Full Plan Text
K0541 Correction Date: 08/25/2026
During annual Life Safety Survey, the ground floor linen chute access room door did not positively latch. All linen/trash room doors were checked and all others positively latched during survey. Ground floor linen room access door has been scheduled to be repaired to positively latch. Daily inspections of the ground floor linen access door will be added to the preventive maintenance inspections for one month. Weekly x 3 months to ensure continued compliance. Maintenance Director will report in QAPI monthly inspection findings for three months.
K0541 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 05/01/2026 · Spot-checks: monthly for 4 weeks
1st floor linen chute access door, within the Biohazard Storage Room will be adjusted to positively latch within the door frame. The Nursing Home Administrator will educate the Maintenance…
View Full Plan Text
K0541 Correction Date: 06/03/2026
1st floor linen chute access door, within the Biohazard Storage Room will be adjusted to positively latch within the door frame. The Nursing Home Administrator will educate the Maintenance Director and Maintenance team to ensure all doors are positively latched with the frame. Random monthly audits will be done by the Maintenance Director/designee to ensure all compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0541 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
Trash Chute damper repaired by Wesley Enhanced Living's Fire Safety vendor. Proper documentation procured stating that the damper is repaired, tested, and functioning properly. It is to be…
View Full Plan Text
K0541 Correction Date: 05/15/2026
Trash Chute damper repaired by Wesley Enhanced Living's Fire Safety vendor. Proper documentation procured stating that the damper is repaired, tested, and functioning properly. It is to be inspected bi-annually as part of their fire damper inspections. A visual inspection to be placed into TELS maintenance program to ensure that there is no physical damage or any debris is impeding its intended function. This will be reviewed during quarterly Quality Assurance committee meeting that includes the Executive Director/Nursing Home Administrator, Director of Nursing, and Director of Facility Operations.
K0541 · Liberty Pointe Rehabilitation and Healthcare Center (PA)
Surveyed 01/20/2026 · Spot-checks: monthly for 4 weeks
Bags removed from the basement trash chute door. Self-closer for the third-floor soiled linen chute door was repaired. Self-closer for the third-floor trash chute door was repaired.…
View Full Plan Text
K0541 Correction Date: 02/23/2026
Bags removed from the basement trash chute door. Self-closer for the third-floor soiled linen chute door was repaired. Self-closer for the third-floor trash chute door was repaired. Maintenance to be educated on maintaining the fire resistance of Soiled Linen and trash chutes. Maintenance to monitor monthly or until compliance is met. Findings will be brought to the QAPI committee.
K0541 · Independence Rehab and Nursing (PA)
Surveyed 11/24/2025 · Spot-checks: weekly for 4 weeks
1. The Maintenance team replaced the latching hardware on the 2nd and 3rd floor South Wing linen chutes to ensure proper functioning. 2. The Maintenance Director inspected the linen chutes on…
View Full Plan Text
K0541 Correction Date: 12/29/2025
1. The Maintenance team replaced the latching hardware on the 2nd and 3rd floor South Wing linen chutes to ensure proper functioning.
2. The Maintenance Director inspected the linen chutes on other units and verified the proper functionality.
3. On 10/2/2025 the NHA educated the maintenance team on maintaining the fire resistance rating of the linen chutes in accordance with NFPA 101 requirements.
4. The Maintenance Director/designee will conduct weekly audits for 4 weeks to verify positive latching and the proper functionality of the linen chute doors. Results of the audits will be reviewed at the QAPI meeting held monthly.
K0541 · Amoroso Healthcare and Rehabilitation Woodridge (PA)
Surveyed 10/28/2025 · Spot-checks: weekly for 4 weeks
1. NHA educated the maintenance director and the floor on 11/7/25 on the need for the laundry chute door not to be propped opened. 2. The maintenance director repaired the laundry chute door…
View Full Plan Text
K0541 Correction Date: 12/09/2025
1. NHA educated the maintenance director and the floor on 11/7/25 on the need for the laundry chute door not to be propped opened.
2. The maintenance director repaired the laundry chute door so it was not propped opened on 10/29/25.
3. The maintenance director will QA the laundry chute door weekly for 4 weeks then monthly to ensure that the door is not propped opened. Results to be reviewed by the QAPI committee.
4. Compliance by 12/9/25.
K0541 · The Gardens at West Shore (PA)
Surveyed 08/20/2025 · Spot-checks: weekly for 4 weeks
1. The 3rd floor laundry chute door closure will be repaired/replaced 2. Maintenace Director/Designee will re-educate facility staff to ensure that if they are aware of any issues will laundry…
View Full Plan Text
K0541 Correction Date: 09/23/2025
K0541
1. The 3rd floor laundry chute door closure will be repaired/replaced
2. Maintenace Director/Designee will re-educate facility staff to ensure that if they are aware of any issues will laundry chute door latches malfunctioning, it is reported to their supervisor promptly.
3. Maintenance Director /Designee will conduct an audit of laundry chute doors to ensure the closures are functioning properly quarterly. Results to QAPI.
4. Date of Compliance 9/23/25
K0541 · Cliveden Nursing and Rehabilitation Center (PA)
Surveyed 06/16/2025 · Spot-checks: monthly for 4 weeks
Both latches on the chute door were replaced. Maintenance staff reeducated on checking doors for proper closing and latching. Maintenance director or designee will complete monthly audits x3…
View Full Plan Text
K0541 Correction Date: 08/01/2025
Both latches on the chute door were replaced. Maintenance staff reeducated on checking doors for proper closing and latching. Maintenance director or designee will complete monthly audits x3 to ensure properly closes and latches.
K0541 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 04/29/2025 · Spot-checks: monthly for 4 weeks
1. a. The rated door to the chute room on the 2nd floor will be adjusted to automatically close and positively latch within the door frame. 2. b. The rated door to the chute room on the 1st…
View Full Plan Text
K0541 Correction Date: 05/28/2025
1. a. The rated door to the chute room on the 2nd floor will be adjusted to automatically close and positively latch within the door frame. 2. b. The rated door to the chute room on the 1st floor will be adjusted to automatically close and positively latch within the door frame. The Nursing Home Administrator will in-service the Maintenance Director, Maintenance team to ensure the door to the chute room will automatically close and positively latch within the frame. Floor staff will be educated to place a work order in TELS if the latch is not working properly. Random monthly audits will be done by the Maintenance Director/designee to ensure compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0541 · Juniper Village at Brookline-Rehabilitation and Skilled Care (PA)
Surveyed 04/15/2025 · Spot-checks: weekly for 4 weeks
The door chock has been removed from soiled linen room. - Maintenance Director educated laundry staff on NFPA 101 Standard rubbish shuts, incinerators, and Laundry Shutes and use of door…
View Full Plan Text
K0541 Correction Date: 06/03/2025
- The door chock has been removed from soiled linen room. - Maintenance Director educated laundry staff on NFPA 101 Standard rubbish shuts, incinerators, and Laundry Shutes and use of door chocks not permitted. - Maintenance Director will be responsible for maintaining compliance with this process.
K0541 · Lecom at Village Square, LLC (PA)
Surveyed 10/06/2026 · Spot-checks: weekly for 4 weeks
1. the facility immediately adjusted and repaired the closing mechanism, latching assembly and hinges on the second floor laundry chute door. Functional testing was conducted on 10/6/2026,…
View Full Plan Text
K0541 Correction Date: 11/20/2026
1. the facility immediately adjusted and repaired the closing mechanism, latching assembly and hinges on the second floor laundry chute door. Functional testing was conducted on 10/6/2026, confirming that the second floor cute door self closes and latches positively into its frame from any position without manual assistance, maintain the required fire-resistive vertical opening integrity. 2.The facility added weekly testing of all vertical cute access doors (testing self-closure and self-latching functions) to the facility's life safety Preventative Maintenance schedule. Housekeeping, laundry and nursing staff were instructed to immediately report any chute door that fails to self-close or latch to the maintenance department via an urgent work order. 3.work to be complete 11/20/26
4. The Administrator will review the Life Safety checklist during the next Quality Assurance and Performance Improvement meeting
K0541 · Independence Rehab and Nursing (PA)
Surveyed 09/16/2026 · Spot-checks: weekly for 4 weeks
Fire door vendor repaired 1. a)fourth floor laundry chute frame the laundry chute frame. Currently secured to shaft wall b) 3rd floor laundry chute frame fixed to include self-closing latch…
View Full Plan Text
K0541 Correction Date: 10/13/2026
Fire door vendor repaired 1. a)fourth floor laundry chute frame the laundry chute frame. Currently secured to shaft wall b) 3rd floor laundry chute frame fixed to include self-closing latch for fire door The Maintenance Director will inspect and test weekly four weeks the second and third floor laundry chute doors to ensure they close, latch and lock. The QAPI Committee will monitor the facility's ongoing compliance with door maintenance and inspection procedures to ensure that corrective actions remain effective and are consistently maintained.