SA SurveyAnchor

Past Winning Plans

Real state-approved Plans of Correction and their spot-check schedules.

Browse State Guides →
Clear
K0371 · Lebanon Skilled Nursing and Rehabilitation Center (PA)
Surveyed 04/06/2026 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection Use K0371 →

1 An approved through penetration fire stop system was used to repair the penetrations by the Maintenance Director 2 Facility will maintain the rating of the smoke barrier walls. 3 Audits will…

View Full Plan Text
K0371 Correction Date: 05/26/2026 1 An approved through penetration fire stop system was used to repair the penetrations by the Maintenance Director 2 Facility will maintain the rating of the smoke barrier walls. 3 Audits will be done quarterly, or be driven by work done above the ceiling near the smoke barriers. 4 Audits will be reviewed at the Quality Assurance Performance Improvement Meetings 5 Maintenance Director will be educated on maintaining fire/smoke barriers in accordance with NFPA codes and standards
K0371 · Greenfield Healthcare and Rehabilitation Center (PA)
Surveyed 01/28/2026 · Spot-checks: monthly for 4 weeks
✓ Passed Re-Inspection Use K0371 →

1. Smoke barriers have been repaired throughout the building. Ceiling tiles have been replaced on the first floor. 2. Inspection of ceilings has been placed on a monthly TELS walkthrough by…

View Full Plan Text
K0371 Correction Date: 02/24/2026 1. Smoke barriers have been repaired throughout the building. Ceiling tiles have been replaced on the first floor. 2. Inspection of ceilings has been placed on a monthly TELS walkthrough by the maintenance department. 3. Quality Assurance Committee will receive a monthly report from maintenance on status of building inspections. Monitored by the Administrator.
K0371 · Greenfield Healthcare and Rehabilitation Center (PA)
Surveyed 01/23/2025 · Spot-checks: monthly for 4 months
✓ Passed Re-Inspection Use K0371 →

The completion of smoke barriers throughout the facility was completed February 2, 2025. The Maintenance Director was educated by the Administrator on January 24, 2025 regarding the…

View Full Plan Text
K0371 Correction Date: 02/28/2025 The completion of smoke barriers throughout the facility was completed February 2, 2025. The Maintenance Director was educated by the Administrator on January 24, 2025 regarding the requirement for the facility to have complete smoke barriers throughout the building. An audit will be completed monthly for 4 months by the Maintenance Director to ensure that the smoke barriers throughout the facility are complete and will be monitored by the Administrator. Results of the audit will be presented at the quarterly QAPI meeting and recommendations will be implemented.