K0311 · Misericordia Nursing & Rehabilitation Center (PA)
Surveyed 07/13/2026 · Spot-checks: monthly for 4 weeks
1. The facility will maintain vertical openings between floors with construction and have a fire resistance of at least 2 hours. 2. The facility will repair the gap at the at the top of the…
View Full Plan Text
K0311 Correction Date: 08/03/2026
1. The facility will maintain vertical openings between floors with construction and have a fire resistance of at least 2 hours.
2. The facility will repair the gap at the at the top of the old linen chute wall located on the first-floor Soiled Utility Room, near resident room with a 2-hour rated fire stop.
3. Vertical openings will be checked monthly by maintenance staff for penetrations. If any penetrations are found, they will be sealed to maintain the proper rating.
4. Monthly inspection will be done to include findings and any follow-up action. Findings will be presented quarterly to QA Committee for further review and evaluation.
K0311 · Holy Family Manor (PA)
Surveyed 06/08/2026 · Spot-checks: weekly for 4 weeks
1. Holy Family Manor is working with architects and engineers to develop a viable structural solution to achieve the required fire resistive integrity of the smoke compartment. In accordance…
View Full Plan Text
K0311 Correction Date: 07/31/2026
1. Holy Family Manor is working with architects and engineers to develop a viable structural solution to achieve the required fire resistive integrity of the smoke compartment. In accordance with TLW already in place, the attic space would become an interstitial space of the 3rd floor and bring the building back to construction type II (222). Holy Family Manor will bring these plans to the Department of Health Plan Review prior to initiation of work. Facility requests continuation of the existing F.S.E.S. on file. The third-floor attic hatch door was immediately closed by the Maintenance Department.
2. The Maintenance Director/Designee will conduct random audits 2 times weekly to ensure all vertical openings are closed and hatch door secured to the frames. Findings will be reported during our QAPI meeting.
K0311 · The Gardens for Memory Care at Easton (PA)
Surveyed 04/20/2026 · Spot-checks: weekly for 4 weeks
1. Administrator and Maintenance Director Request the Department of Health Life Safety reaffirm and acknowledge the existing FSES.
View Full Plan Text
K0311 Correction Date: 05/19/2026
K0311
1. Administrator and Maintenance Director Request the Department of Health Life Safety reaffirm and acknowledge the existing FSES.
K0311 · Holy Family Home (PA)
Surveyed 04/06/2026 · Spot-checks: weekly for 4 weeks
1. The facility will correct the deficient penetrations by installing a UL-listed through-penetration firestop system (UL System No. C-AJ-1353), tested in accordance with UL 1479, appropriate…
View Full Plan Text
K0311 Correction Date: 05/13/2026
1.The facility will correct the deficient penetrations by installing a UL-listed through-penetration firestop system (UL System No. C-AJ-1353), tested in accordance with UL 1479, appropriate for the construction of ceiling deck slab with penetrating steel conduit. Installation was completed by the UL system design, including required backing materials and sealant depth, restoring the fire-resistance rating.
2. Maintenance staff completed an inspection of mechanical rooms to ensure vertical penetrations were sealed.
3. Penetration sealing requirements are now included in all construction, repair, and renovation work orders. Contractors must provide documentation of fire-rated materials used.
4. The Maintenance Director will review all ceiling penetration inspections and report findings to the Safety Committee.
K0311 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
The facility has corrected the deficiency. On March 24, 2026, the wire penetration in the elevator shaft was properly sealed using approved fire-rated materials to restore the integrity of the…
View Full Plan Text
K0311 Correction Date: 04/27/2026
The facility has corrected the deficiency. On March 24, 2026, the wire penetration in the elevator shaft was properly sealed using approved fire-rated materials to restore the integrity of the vertical opening enclosure. A facility-wide inspection was conducted to identify any additional penetrations. The Maintenance Director or designee will monitor compliance by including vertical enclosure inspections during routine environmental rounds. Completion date: March 24, 2026.
K0311 · Allied Services Meade Street Skilled Nursing (PA)
Surveyed 01/28/2026 · Spot-checks: weekly for 4 weeks
Facility requests PA DOH Division of Safety Inspection conduct an updated Fire Safety Evaluation System (FSES).
View Full Plan Text
K0311 Correction Date: 03/06/2026
Facility requests PA DOH Division of Safety Inspection conduct an updated Fire Safety Evaluation System (FSES).
K0311 · Sarah Reed Senior Living (PA)
Surveyed 12/09/2025 · Spot-checks: weekly for 4 weeks
1. A new laundry chute door with handle/latching mechanism will be ordered and installed to ensure the door fully latches and maintains the integrity of the vertical opening. 2. Maintenance…
View Full Plan Text
K0311 Correction Date: 01/23/2026
1. A new laundry chute door with handle/latching mechanism will be ordered and installed to ensure the door fully latches and maintains the integrity of the vertical opening.
2. Maintenance will conduct an audit of all laundry chute doors throughout the facility to ensure they latch properly and are free from damage.
3. Replacement of damaged components, including handles and latches, will occur promptly when issues are identified.
4. This will be monitored and reported at next quarterly QAPI meeting by the maintenance supervisor.
K0311 · Friendship Village of South Hills (PA)
Surveyed 09/24/2025 · Spot-checks: weekly for 4 weeks
The ceiling in the Dogwood utility room was repaired. Plant Operations will educate the Maintenance department on maintaining vertical openings. Random Audits of Utility areas will be…
View Full Plan Text
K0311 Correction Date: 10/20/2025
The ceiling in the Dogwood utility room was repaired. Plant Operations will educate the Maintenance department on maintaining vertical openings. Random Audits of Utility areas will be completed by maintenance/designee to ensure vertical openings are maintained weekly x 4 weeks, then monthly x2. Results will be reported to QAPI for review.
K0311 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 08/18/2025 · Spot-checks: monthly for 4 weeks
The Penetration inside the stairwell vestibule shaft wall was sealed with fire resistant seal with approved through penetration fire stop systems. All areas have the potential to be affected.…
View Full Plan Text
K0311 Correction Date: 10/01/2025
The Penetration inside the stairwell vestibule shaft wall was sealed with fire resistant seal with approved through penetration fire stop systems. All areas have the potential to be affected. Maintenance staff will be educated ensuring that areas are enclosed with fire resistive material Random audits will be conducted by the maintenance director or designee to ensure that areas are enclosed with fire resistive material Monthly x2 with reports to QAPI
K0311 · Delaware Valley Veterans' Home (PA)
Surveyed 07/28/2025 · Spot-checks: monthly for 4 weeks
The unsealed penetration of the ceiling assembly, in the basement, Custodial Storage/Macerator Room was returned to its original condition using concrete and steel. Education will be given to…
View Full Plan Text
K0311 Correction Date: 09/22/2025
The unsealed penetration of the ceiling assembly, in the basement, Custodial Storage/Macerator Room was returned to its original condition using concrete and steel. Education will be given to the Maintenance Department so that any penetrations in the building must be sealed with approved fire-resistant product. The Facility Maintenance Director will audit any unsealed penetrations monthly to ensure fire resistant products are used. The results of the audit will be reviewed at the Quality Assurance & Performance Improvement meetings. The Quality Assurance Committee will determine the need for additional audits/ interventions for ongoing compliance.
K0311 · The Gardens for Memory Care at Easton (PA)
Surveyed 05/21/2025 · Spot-checks: weekly for 4 weeks
Administrator and Maintenance Director Request the Department of Health Life Safety reaffirm and acknowledge the existing FSES.
View Full Plan Text
K0311 Correction Date: 06/10/2025
Administrator and Maintenance Director Request the Department of Health Life Safety reaffirm and acknowledge the existing FSES.
K0311 · Bethlehem North Skilled Nursing and Rehabilitation Center (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
1. No residents were negatively affected. The stair tower door nearest to the elevator on the 2nd floor was repaired at the time of the survey to ensure positive latching. 2. The Maintenance…
View Full Plan Text
K0311 Correction Date: 05/10/2025
1.No residents were negatively affected. The stair tower door nearest to the elevator on the 2nd floor was repaired at the time of the survey to ensure positive latching.
2. The Maintenance Director/designee will be re-educated to ensure doors properly latch. 3.Random audits of facility doors will be conducted to ensure doors properly latch 1X weekly for 4 weeks. 4.Findings of audits to be reported to QAPI for review and recommendations.
K0311 · Inglis House (PA)
Surveyed 03/25/2025 · Spot-checks: weekly for 4 weeks
1. Inglis House is requesting the Pa Division of Life Safety to update the F.S.E.S. for this facility. The Engineering Director or designee will monitor this plan. 2. On the Ground Floor, near…
View Full Plan Text
K0311 Correction Date: 05/06/2025
1.Inglis House is requesting the Pa Division of Life Safety to update the F.S.E.S. for this facility. The Engineering Director or designee will monitor this plan.
2. On the Ground Floor, near the North Stair Tower in the Elevator Mechanical Room, the rated access door to the mechanical shaft will be adjusted to latch properly. To prevent this condition from happening again a task will be added to the Annual Life Safety Building and Mechanical Room Check to " Check all Mechanical Room Access Door To Shafts for Proper Operation and Latching" The Director of Engineering Services/ designee Will Monitor This Plan
K0311 · Allied Services Meade Street Skilled Nursing (PA)
Surveyed 03/18/2025 · Spot-checks: weekly for 4 weeks
Facility requests PA DOH Division of Safety Inspection conduct an updated Fire Safety Evaluation System (FSES)
View Full Plan Text
K0311 Correction Date: 04/11/2025
Facility requests PA DOH Division of Safety Inspection conduct an updated Fire Safety Evaluation System (FSES)
K0311 · Elan Skilled Nursing and Rehab, A Jewish Senior Life Community (PA)
Surveyed 09/23/2026 · Spot-checks: weekly for 4 weeks
Elan Skilled Nursing & Rehab (facility) submits this Plan of Correction under procedures established by the Department of Health in order to comply with the Department's directive to change…
View Full Plan Text
K0311 Correction Date: 10/28/2026
Elan Skilled Nursing & Rehab (facility) submits this Plan of Correction under procedures established by the Department of Health in order to comply with the Department's directive to change conditions which the Department alleges are deficient under State and Federal regulations relating to long term care. This Plan of Correction should not be construed as either a waiver of the facility's right to appeal or an admission of past or ongoing violations of State and Federal regulatory requirements. The Facility reviewed/completed a FSES under the state and federal regulations. The Facility will request that the Division of Safety inspection to conduct a FSES. K0311 NFPA 101 Vertical Openings-Enclosures This is acceptable under the revised FRES dated 2/27/2024.