K0281 · Homeland Center (PA)
Surveyed 08/05/2025 · Spot-checks: weekly for 4 weeks
✓ Passed Re-Inspection
Use K0281 →
Preparation and submission of this Plan of Correction is required by State and Federal law. This plan does not constitute an admission for purposes of general liability, professional…
View Full Plan Text
K0281 Correction Date: 09/22/2025
Preparation and submission of this Plan of Correction is required by State and Federal law. This plan does not constitute an admission for purposes of general liability, professional malpractice, or any other court proceedings. Homeland Center appreciates the efforts of the state survey team to serve the best interest of Homeland Center Residents. Observation 1 corrected by replacing all light bulbs, in both fixtures, in stair tower. All emergency exits will be inspected to ensure functioning bulbs exist in each fixture, on a permanent monthly basis. Quality Assurance Performance Improvement (QAPI), Performance Improvement Plan will be created to inspect all emergency exit light fixtures, on a monthly basis, to ensure functioning bulbs exist in all stair tower fixtures. The Director of Quality Assurance Performance Improvement, or designee, will inspect all stair tower light fixtures on a permanent, monthly basis. Results of QAPI Performance Improvement Plan will be presented at weekly Clinical/QAPI meeting. Further interventions will occur if determined 100% compliance is not achieved. The Administrator, Director of Maintenance/Emergency Preparedness/Purchasing and Director of QAPI will be responsible for consistent, on-going compliance.