Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
Federal CMS Precedents Shown for Colorado: CMS SOM § 7304 Plan-of-Correction rules apply nationwide. Below are verified Passed-Revisit examples you can adapt for Colorado, or view local county stats in
Colorado State Guides →
K0914 · Majestic Care of McCordsville (IN)
Surveyed 08/11/2026 · Spot-checks: monthly for 4 weeks
That failed the annual inspection be replaced with hospital grade receptacles. Identification of Other Residents/Areas Potentially Affected: All residents have the potential to be affected but…
View Full Plan Text
K0914
Completion Date: 09/30/2026
K0914 that failed the annual inspection be replaced with hospital grade receptacles. Identification of Other Residents/Areas Potentially Affected: All residents have the potential to be affected but none were identified. Receptacles identified in resident resident room and resident resident room failing retention force will be replaced with hospital grade receptacles on or before 9/30/2026. Systemic Correction: Education was provided to the Maintenance Director regarding the use of hospital grade receptacles on 8/28/2026. Monitoring: The QAPI Committee will monitor monthly X 6 months for review. The ED/Designee will oversee.
K0914 · Fairlane Gardens Nursing and Rehab at Reading (PA)
Surveyed 07/29/2026 · Spot-checks: weekly for 4 weeks
1) The annual inspection and testing of the electrical outlets in the patient care areas, in three of four smoke zones within the components has been completed. 2) Maintenance director will be…
View Full Plan Text
K0914 Correction Date: 09/15/2026
1) The annual inspection and testing of the electrical outlets in the patient care areas, in three of four smoke zones within the components has been completed. 2) Maintenance director will be educated on annual inspections and testing of the electrical outlets in the patient care areas. 3) NHA/designee will audit life safety books for required regulatory documentation semi-annually. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
K0914 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
0914: Electrical Systems - Maintenance and Testing: The facility failed to provide documentation verifying non-hospital grade electrical receptacles had been inspected, in seven of seven smoke…
View Full Plan Text
K0914 Correction Date: 08/05/2026
0914: Electrical Systems - Maintenance and Testing: The facility failed to provide documentation verifying non-hospital grade electrical receptacles had been inspected, in seven of seven smoke zones within the component. No residents were affected. All residents have the potential to be affected. Facility wide audit to be completed by the Maintenance Director/Designee by 05AUG2026 to ensure that all receptacles are operating properly and documented. On 21JUL2026, NHA educated the Maintenance Director on the importance of maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits monthly x 3 weeks then annually, to ensure that documentation for electrical receptacle inspection meet the requirement per regulation. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
K0914 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. The facility completed inspection and testing of all non-hospital-grade electrical receptacles located in patient care areas in accordance with NFPA 99 requirements. Any deficient…
View Full Plan Text
K0914 Correction Date: 06/25/2026
1. The facility completed inspection and testing of all non-hospital-grade electrical receptacles located in patient care areas in accordance with NFPA 99 requirements. Any deficient receptacles identified during testing were repaired or replaced.
2. The Director of Plant Operations, or designee, conducted a facility-wide review of all patient care areas to identify non-hospital-grade receptacles requiring annual testing and documentation. All applicable receptacles were inspected and documented to ensure compliance throughout the component.
3. Maintenance staff were educated regarding NFPA 99 electrical receptacle testing and documentation requirements.
4. The Director of Plant Operations, or designee, will: - Review preventive maintenance schedules monthly to verify required inspections are current. - Audit receptacle testing documentation quarterly for completeness and compliance. - Report compliance findings through the facility's Quality Assurance and Performance Improvement (QAPI) process for a minimum of three months, then quarterly thereafter. Any identified deficiencies will be corrected immediately.
K0914 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
The facility has corrected the deficiency. The annual tension and continuity testing of non-hospital grade electrical receptacles in patient sleeping areas was completed, and documentation has…
View Full Plan Text
K0914 Correction Date: 04/27/2026
The facility has corrected the deficiency. The annual tension and continuity testing of non-hospital grade electrical receptacles in patient sleeping areas was completed, and documentation has been maintained on-site. A tracking system has been implemented to ensure annual testing is completed timely. The Maintenance Director or designee will monitor compliance by reviewing testing records annually.
K0914 · Norriton Square Nursing and Rehabilitation Center (PA)
Surveyed 01/30/2026 · Spot-checks: weekly for 4 weeks
Maintenance director or designee will complete annual testing of electrical receptacles. NHA or designee will re-educate the maintenance director on completion of electrical receptacle…
View Full Plan Text
K0914 Correction Date: 03/08/2026
Maintenance director or designee will complete annual testing of electrical receptacles. NHA or designee will re-educate the maintenance director on completion of electrical receptacle testing. Quarterly audit of the receptacle testing will be completed by NHA or designee x
2. The results will be reviewed at the QAPI meeting x2 to ensure compliance.
K0914 · Harborview Rehabilitation and Care Center at Doylestown (PA)
Surveyed 10/20/2025 · Spot-checks: monthly for 4 weeks
1. The facility acknowledges that required electrical receptacle testing at patient bed locations had been completed; however, the documentation was maintained on an incorrect form that did…
View Full Plan Text
K0914 Correction Date: 11/26/2025
1.The facility acknowledges that required electrical receptacle testing at patient bed locations had been completed; however, the documentation was maintained on an incorrect form that did not capture all elements required by NFPA 99 (including polarity check, visual inspection, and grounding retention force). As of October 21st, 2025, the proper "Electrical Receptacle Testing Log" form has been implemented to ensure full compliance with all NFPA 99 testing requirements. 2.The Maintenance Director has reviewed all resident care areas and confirmed that receptacle testing was conducted in all required locations. Any areas missing complete documentation have been retested and recorded using the correct form. 3.The Maintenance Department has been re-educated on the proper documentation process using the approved "Electrical Receptacle Testing Log. The Maintenance Director will ensure all future testing utilizes this standardized form. 4.Maintenance Director/designee will conduct quarterly audits of receptacle testing logs to verify accuracy and compliance. Audit results will be reviewed during monthly QAPI meetings
K0914 · Hamilton Arms Center (PA)
Surveyed 09/10/2025 · Spot-checks: weekly for 4 weeks
1. Electrical receptacles will be tested within patient care areas within every 12 months. Inspection will be completed in October. 2. The testing report will be placed in the life safety…
View Full Plan Text
K0914 Correction Date: 11/03/2025
1. Electrical receptacles will be tested within patient care areas within every 12 months. Inspection will be completed in October.
2. The testing report will be placed in the life safety book.
3. Education will be provided to the maintenance department as to the 12 month requirement.
4. Results of the inspections will be reviewed and reported to the QAPI committee.
5. Date certain is 11-3-25
K0914 · Centennial Healthcare and Rehabilitation Center (PA)
Surveyed 08/18/2025 · Spot-checks: monthly for 4 weeks
Electrical receptacles were tested and include the following. A. resident rooms B. visual Inspection of physical integrity C. correct polarity of the hot and neutral connection D. Retention…
View Full Plan Text
K0914 Correction Date: 10/01/2025
Electrical receptacles were tested and include the following. A. resident rooms B. visual Inspection of physical integrity C. correct polarity of the hot and neutral connection D. Retention force of the grounding blade shall not be less than the 115g(4oz) All areas have the potential to be affected. Maintenance staff will be educated ensuring that electric receptacles are tested at bedside location. Random audits will be conducted by the maintenance director or designee Monthly x2 with reports to QAPI to ensure that electric receptacles are tested at bed side
K0914 · Pottstown Skilled Nursing and Rehabilitation Center (PA)
Surveyed 05/01/2025 · Spot-checks: weekly for 4 weeks
1. The electrical receptacles at resident bed locations are being tested for non-hospital grade receptacles which included resident care rooms, visual inspection of physical integrity, correct…
View Full Plan Text
K0914 Correction Date: 06/10/2025
1. The electrical receptacles at resident bed locations are being tested for non-hospital grade receptacles which included resident care rooms, visual inspection of physical integrity, correct polarity of the hot and neutral connections, and retention force of the grounding blade (not less than 115g)
2. The facility is completing the electrical receptacle testing within the required parameters as stated in #1. The results of the testing are being documented and will be placed in the facility Life Safety binder.
3. The Director of Maintenance has been educated on the requirements for the electrical receptacle testing to be completed at least 1 X a year with documented results and placed in the facility Life Safety binder.
4. The facility's Life Safety binder will be audited quarterly to ensure placement and availability of the facility documentation pertaining to electrical receptacle testing completion and results. Audit results will be reviewed at QAPI.
5. Date of Completion is Jun 10, 2025.
K0914 · Juniper Village at Brookline-Rehabilitation and Skilled Care (PA)
Surveyed 04/15/2025 · Spot-checks: weekly for 4 weeks
Audit of Electrical Receptables to identify yearly testing. - Nursing home administrator educated Maintenance staff on NFPA 101 Standard electrical Systems- Maintenance and testing of…
View Full Plan Text
K0914 Correction Date: 06/03/2025
- Audit of Electrical Receptables to identify yearly testing. - Nursing home administrator educated Maintenance staff on NFPA 101 Standard electrical Systems- Maintenance and testing of electrical receptacles including yearly testing. - Regular rounds of the electrical receptacles will be conducted to identify and correct any receptables that need yearling testing. - Maintenance Director will be responsible for this process
K0914 · Kadima Rehabilitation & Nursing at Washington (PA)
Surveyed 01/08/2025 · Spot-checks: weekly for 4 weeks
Based on documentation review, the facility failed to maintain electrical receptacles in patient sleeping areas in one instance. -Documentation will be implemented to ensure annual testing of…
View Full Plan Text
K0914 Correction Date: 02/04/2025
0914 -Based on documentation review, the facility failed to maintain electrical receptacles in patient sleeping areas in one instance. -Documentation will be implemented to ensure annual testing of non-hospital grade electrical receptacles (tension & continuity). -The Maintenance Director will be rein-serviced on preforming annual testing on non-hospital grade receptacles. -The Maintenance Director or designee will review and complete the annual testing to ensure the completion of the plan of corrections and report to the QA to ensure regulatory compliance.
K0914 · Hamilton Grove (IN)
Surveyed 09/14/2026 · Spot-checks: monthly for 4 weeks
The facility reviewed its receptacle testing records and updated documentation to identify each individual receptacle tested. Resident room receptacles were inspected and tested for grounding,…
View Full Plan Text
K0914
Completion Date: 10/23/2026
Plan of Correction - K0914 (Electrical Systems - Maintenance and Testing) Hamilton Grove Deficiency: Annual receptacle testing documentation did not identify and document each individual non-hospital-grade receptacle at resident bed locations as required by NFPA 99.
1. What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice? The facility reviewed its receptacle testing records and updated documentation to identify each individual receptacle tested. Resident room receptacles were inspected and tested for grounding, polarity, retention force, and physical integrity. Missing documentation was completed and any deficiencies identified were corrected. Because receptacles are used throughout resident care areas, all residents, staff, and visitors had the potential to be affected. The Maintenance Director conducted a facility-wide review of receptacle testing records and completed any missing testing or documentation.
3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur? The facility implemented a standardized receptacle testing form requiring documentation of each receptacle location, testing results, date of testing, and corrective actions taken. The Maintenance Director and maintenance staff were educated on NFPA 99 testing and documentation requirements. Records will be maintained in the Life Safety Compliance Binder. The Maintenance Director or designee will conduct monthly audits of receptacle testing documentation for six months to verify compliance. Audit results will be reviewed by the QAPI Committee monthly for six months. Any identified deficiencies will be corrected , re-education will be provided as needed, and findings will be trended to prevent recurrence.
K0914 · Majestic Care of North Vernon (IN)
Surveyed 08/11/2026 · Spot-checks: weekly for 4 weeks
Electrical outlet receptacle testing at all resident rooms was immediately completed. Any concerns noted were immediately corrected. How other residents having the potential to be affected by…
View Full Plan Text
K0914
Completion Date: 08/28/2026
POC-K0914 What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice? Electrical outlet receptacle testing at all resident rooms was immediately completed. Any concerns noted were immediately corrected. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective deficient practice. Electrical outlet receptacle testing at all resident rooms was immediately completed. Any concerns noted were immediately corrected. What measures will be put into place and what systematic changes will be made to ensure that the deficient practice does not recur? The Maintenance Director was educated regarding requirements for electrical receptacle testing and documentation. Maintenance director will audit electrical outlet receptacle testing to ensure it is done timely. How the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place? The Executive Director or maintained in accordance with requirements. Any concerns identified will be immediately corrected. Results will be submitted to QAPI for review and follow-up as needed. By what date the systematic changes for each deficiency will be completed? 8/28/2026 What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice? The required four-hour generator load test was scheduled and completed. Documentation of the completed test was obtained and maintained on site. Monthly battery conductance testing procedures were implemented and documentation forms were established to ensure compliance with requirements. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective actions(s) will be taken? identify any additional compliance concerns. Any concerns identified were immediately corrected. What measures will be put into place and what systematic changes will be made to ensure that the deficient practice does not recur? The Maintenance Director was educated regarding requirements for monthly battery conductance testing and required three-year four-hour generator load testing. Maintenance director will audit monthly battery conductance testing and three-year four-hour generator load testing to ensure it is done timely. The Executive Director or designee will conduct a weekly audit of generator maintenance records, monthly battery conductance testing documentation, monthly generator testing logs, and required generator load test documentation for six months. Any concerns identified will be immediately corrected. Results will be reviewed through the facility's QAPI process until substantial compliance is achieved. By what date the systematic changes for each deficiency will be completed? 8/28/2026