Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
Federal CMS Precedents Shown for California: CMS SOM § 7304 Plan-of-Correction rules apply nationwide. Below are verified Passed-Revisit examples you can adapt for California, or view local county stats in
California State Guides →
K0920 · Markley Rehabilitation and Healthcare Center (PA)
Surveyed 07/23/2026 · Spot-checks: weekly for 4 weeks
The extension cord in resident resident room was removed. Maintenance staff conducted an audit of resident rooms, and no additional extension cords were in use. NHA/Maintenance…
View Full Plan Text
K0920 Correction Date: 08/26/2026
The extension cord in resident resident room was removed. Maintenance staff conducted an audit of resident rooms, and no additional extension cords were in use. NHA/Maintenance Director/Designee will in-service staff on the regulations regarding extension cord usage in the facility. The Maintenance Director/Designee will conduct an audit on random resident rooms once a week for 4 weeks, then once a month for 2 months to ensure that no extension cords are being used in resident rooms. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendations needed.
K0920 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
920: Electrical Equipment - Power Cords and Extens: The facility failed to monitor the use of extension cords and surge suppressors within the facility, affecting two of seven smoke…
View Full Plan Text
K0920 Correction Date: 08/05/2026
920: Electrical Equipment - Power Cords and Extens: The facility failed to monitor the use of extension cords and surge suppressors within the facility, affecting two of seven smoke compartments within the component. No residents were affected. All residents have the potential to be affected. The extension cord was removed from the interstitial space, above the suspended ceiling, behind the nurse's station by the Maintenance Director and permanent electrical outlet put in place by 05AUG2026. The surge suppressor was removed from the Dialysis room by the maintenance director on 08JUL2026. Maintenance Director/Designee completed an audit 08JUL2026 to ensure that no unauthorized surge protectors or extension cords in use. On 21JUL2026, NHA educated the Maintenance Director and maintenance team on the importance of ensuring safe usage of extension cords and surge suppressors per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits monthly x 12 months, to ensure the facility meets regulatory requirements. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to the quarterly Quality Assurance Performance Improvement Committee for review and recommendations.
K0920 · Arbor Grove Village (IN)
Surveyed 05/27/2026 · Spot-checks: monthly for 4 weeks
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by the alleged deficient practice. Medical…
View Full Plan Text
K0920
Completion Date: 06/25/2026
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by the alleged deficient practice. Medical equipment has been removed from the multi-plug adapter and plugged into the wall outlet in resident room. (See attachment L, M)
2. How other residents having All residents have the potential to be affected. Maintenance director in-serviced on 5/28/26 on electrical equipment and power cord and extension cord use.
3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur; New admission medical equipment will be inspected and plugged into the proper outlet. Maintenance director or designee will use Life safety code/QAPI tool to audit resident rooms to ensure all medical equipment is plugged into the wall outlet.
4. How the corrective action will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place. Maintenance Director or designee will complete ongoing monitoring via QAPI program with meetings held bi-monthly and is overseen by the Executive Director. The review. The results of these audits will be reviewed by the QAPI committee, if threshold of 100% is not achieved an action plan will be revised/completed.
K0920 · The Gardens at Easton (PA)
Surveyed 05/21/2026 · Spot-checks: weekly for 4 weeks
NFPA 101 Electrical Equipment- Power cords and Extensions 1. Multi outlet plug in device was removed from resident room. 2. House wide Education to all staff- multi outlet plug ins and power…
View Full Plan Text
K0920 Correction Date: 06/29/2026
K 920- NFPA 101 Electrical Equipment- Power cords and Extensions
1. Multi outlet plug in device was removed from resident room.
2. House wide Education to all staff- multi outlet plug ins and power strips are prohibited in facility and residents rooms. Remove and/or report to supervisor immediately if seen.
3. Weekly audits of all rooms to ensure no multi plug in outlets or power strips are in resident rooms x4 weeks then monthly x2 months.
4. Report findings to QAPI
K0920 · Lehigh Valley Hospital Transitional Skilled Unit (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. The extension cord observed in room 5T27 was immediately removed. Approved power sources were confirmed for all patient care equipment in the room. 2. Nursing and Facilities staff completed…
View Full Plan Text
K0920 Correction Date: 05/27/2026
1. The extension cord observed in room 5T27 was immediately removed. Approved power sources were confirmed for all patient care equipment in the room.
2. Nursing and Facilities staff completed a unitwide inspection of all patient rooms and care areas to identify and remove unauthorized extension cords or nonapproved power strips.
3. Staff education was completed for nursing and ancillary departments on proper use of power strips and prohibition of extension cords per NFPA 99 and NFPA
70. Unit leadership will reinforce expectations during routine safety rounds.
4. Monthly environmental safety rounds will include specific audits for extension cord and power strip compliance, with findings reported to the QAPI committee.
K0920 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 05/01/2026 · Spot-checks: monthly for 4 weeks
The surge suppressor, suspended from electrical wiring, at the Ground Floor Nurses' Station was secured to the wall. The Nursing Home Administrator will educate the Maintenance Director and…
View Full Plan Text
K0920 Correction Date: 06/03/2026
The surge suppressor, suspended from electrical wiring, at the Ground Floor Nurses' Station was secured to the wall. The Nursing Home Administrator will educate the Maintenance Director and Maintenance team to ensure surge protectors are not suspended and must be secured to the wall. Random monthly audits will be done by the Maintenance Director/designee to ensure all compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0920 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
1. The surge suppressor within D1 PT Rehab office was removed. Facility staff will monitor the facility throughout for surge suppressor devices on a monthly basis for 3 months. Any…
View Full Plan Text
K0920 Correction Date: 06/09/2026
1. The surge suppressor within D1 PT Rehab office was removed. Facility staff will monitor the facility throughout for surge suppressor devices on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0920 · Richland Bean Blossom Health Care Center (IN)
Surveyed 04/27/2026 · Spot-checks: monthly for 4 weeks
24 residents in one smoke compartment. A full facility audit was conducted to ensure that no additional extension cords were present with no additional findings noted. Re-education was…
View Full Plan Text
K0920 24 residents in one smoke compartment. A full facility audit was conducted to ensure that no additional extension cords were present with no additional findings noted. Re-education was provided to the Maintenance Director and Maintenance Assistant. Audits for monitoring extension cords use within the facility will be conducted by the Maintenance Director or designee monthly x 6 months or until 100% compliance is achieved. Results of these audits will be presented to the QA committee, and any recommendations for changes or updates by the QA committee will be put into place as indicated. These systemic changes will be in place on or before 05/30/2026
K0920 · Suburban Woods Health & Rehabilitation Center (PA)
Surveyed 03/25/2026 · Spot-checks: weekly for 4 weeks
1. The outlet multiplier and extension cord were removed. 2. Maintenance Director audited all office spaces to ensure none are in use 3. Staff educated that extension cords are prohibited in…
View Full Plan Text
K0920 Correction Date: 05/22/2026
1. The outlet multiplier and extension cord were removed.
2. Maintenance Director audited all office spaces to ensure none are in use
3. Staff educated that extension cords are prohibited in the facility.
4. Random audits to be completed weekly x3 and monthly x1 to ensure there are no multipliers or extension cords being used. Results will be reviewed and revised as needed during monthly QAPI.
K0920 · Wesley Enhanced Living - Doylestown (PA)
Surveyed 03/16/2026 · Spot-checks: weekly for 4 weeks
Extension cords removed from area and Housekeeping staff in serviced on prohibition of using them. Placed into TELS maintenance program for quarterly inspections. Also placed into semi-annual…
View Full Plan Text
K0920 Correction Date: 05/15/2026
Extension cords removed from area and Housekeeping staff in serviced on prohibition of using them. Placed into TELS maintenance program for quarterly inspections. Also placed into semi-annual safety surveillance rounds and reported on during Wesley Enhanced Living's safety committee meetings. Also to be reported during quarterly Quality Assurance committee that includes the Executive Director/Nursing Home Administrator, Director of Nursing, and Director of Facility Operations.
K0920 · Onyx Nursing & Rehabilitation (PA)
Surveyed 03/11/2026 · Spot-checks: weekly for 4 weeks
1. Maintenance staff removed extension cord from residence room and unplugged AC unit from power strip and plugged unit into wall outlet. 2. NHA/designee conducted audit of residence rooms to…
View Full Plan Text
K0920 Correction Date: 04/08/2026
Preparation and submission of this Plan of Correction does not constitute an admission or agreement with the facts alleged or conclusions stated in the Statement of Deficiencies. This Plan of Correction is submitted solely because it is required by Federal and State regulations.
1. Maintenance staff removed extension cord from residence room and unplugged AC unit from power strip and plugged unit into wall outlet.
2. NHA/designee conducted audit of residence rooms to ensure no, non pcree usage of power strips in Resident room. No other issues identified.
3. NHA/designee educated maintenance staff on requirements to ensure no non-PCREE equipment are plugged into power strips in patient care areas and power strips used for PCREE meet UL1363 or UL 606011.and power strips for non-PCREE when use is permitted must be certified, UL1363. And all electrical equipment are in good repair.
4. NHA/designee will audit, patient rooms, weekly X4 then monthly X2. or until substantial is attained to ensure no extension cords improperly in use. Results will be brought to QAPI for further evaluation and recommendations.
K0920 · Accela Rehab and Care Center at Somerton (PA)
Surveyed 02/24/2026 · Spot-checks: weekly for 4 weeks
Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies.…
View Full Plan Text
K0920 Correction Date: 04/21/2026
Preparation and /or execution of this plan does not constitute admission or agreement by the provider of the truths or facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed with federal and state law requirements. Identification of other residents or areas having the potential to be affected due to the nature of the deficiency: The deficient practice has the potential to affect all residents. Corrective action 1.Extension cords in laundry room and A32 were removed 2.Maintenance director or designee to re-educate maintenance staff on the importance of NFPA regulations regarding power strips 3.Maintenance director or designee to randomly audit laundry rooms and resident rooms for inappropriate usage of powers strips. Weekly X4 Monthly X3 4.Results will be reviewed at the quarterly QAPI meeting
K0920 · Bethany Village Retirement Center (PA)
Surveyed 01/06/2026 · Spot-checks: monthly for 3 months
Following discovery the relocatable power tap was promptly removed. A full building survey was undertaken and completed by January 16 to identify and remove any and all relocatable power taps.…
View Full Plan Text
K0920 Correction Date: 02/06/2026
Following discovery the relocatable power tap was promptly removed. A full building survey was undertaken and completed by January 16 to identify and remove any and all relocatable power taps. Administrator or designee will continue monthly inspections for 3 months; as well as quarterly for 1 year to identify, report, and remove any additional relocatable power taps. Instances discovered will be tracked and corrected. Facilities staff were educated on the necessity of checking for and removing any relocatable power taps when working in resident rooms and throughout the building. Results of the inspections, additional discoveries addressed, and education of staff will be included in the facility's monthly 2026 Quality Assurance and Performance Improvement (QAPI) meetings for review and approval.
K0920 · Easton Skilled Nursing and Rehabilitation Center (PA)
Surveyed 12/30/2025 · Spot-checks: weekly for 4 weeks
1. Extension cord removed from resident resident room. Education on electrical extension cords 3. Will Audit weekly x4 to ensure compliance.
View Full Plan Text
K0920 Correction Date: 01/14/2026
1. Extension cord removed from resident resident room. Education on electrical extension cords
3. Will Audit weekly x4 to ensure compliance.
K0920 · Cedar Crest Post Acute (PA)
Surveyed 12/17/2025 · Spot-checks: monthly for 4 weeks
1. Power strip removed from respiratory therapy office on 1st floor. Maintenance Director and/or designee will install hospital grade, hard wired outlet in office. 2. Monthly audit of offices…
View Full Plan Text
K0920 Correction Date: 01/15/2026
1. Power strip removed from respiratory therapy office on 1st floor. Maintenance Director and/or designee will install hospital grade, hard wired outlet in office.
2. Monthly audit of offices will be completed for unauthorized use of power strips. Identified areas of concern will be addressed. Identified trends to be reviewed during QAPI.