Surveyed 04/22/2026 · Spot-checks: monthly for 4 weeks
1. The Maintenance Director or Designee will replace the emergency circuit (red) receptable located in east hall med room and the receptacle located in the west hall soiled utility room with…
View Full Plan Text
K0912 Correction Date: 05/08/2026
1. The Maintenance Director or Designee will replace the emergency circuit (red) receptable located in east hall med room and the receptacle located in the west hall soiled utility room with the appropriate ground fault circuit interrupter (GFCI) by May 1,
2026. The Regional Maintenance Director will re-educate the maintenance staff on NFPA 70 by May 1,
2026. The results will be reported to the Quality Assurance and Performance Improvement Committee for review at the next monthly meeting.
K0912 · Carnegie Park Post Acute (PA)
Surveyed 03/10/2026 · Spot-checks: weekly for 4 weeks
The facility has corrected the deficiency. On March 10, 2026, the electrical receptacle in the clean utility room in Medbridge was repaired and a proper cover was installed. A facility-wide…
View Full Plan Text
K0912 Correction Date: 04/27/2026
The facility has corrected the deficiency. On March 10, 2026, the electrical receptacle in the clean utility room in Medbridge was repaired and a proper cover was installed. A facility-wide inspection of electrical receptacles was conducted to ensure all are properly covered and maintained. The Maintenance Director or designee will monitor compliance during routine environmental rounds. Completion date: March 10, 2026.
K0912 · Greenfield Healthcare and Rehabilitation Center (PA)
Surveyed 01/28/2026 · Spot-checks: monthly for 4 weeks
1. Ground Fault circuit interrupter (GFCI) outlets have been installed behind both water coolers. 1 on east wing, 1 on west wing. 2. Other outlets near a water source have been inspected for…
View Full Plan Text
K0912 Correction Date: 02/24/2026
1. Ground Fault circuit interrupter (GFCI) outlets have been installed behind both water coolers. 1 on east wing, 1 on west wing.
2. Other outlets near a water source have been inspected for need of a GFCI. No others were found to be missing.
3. Quality Assurance Committee will receive a report of building inspections from Maintenance during monthly meeting. Monitored by administrator.
K0912 · New Eastwood Healthcare and Rehabilitation Center (PA)
Surveyed 01/22/2026 · Spot-checks: monthly for 4 weeks
1. The facility completed receptacle testing data for both floors in resident areas. 2. NHA or designee will educated the Director of Maintenance to ensure receptacles are testing is completed…
View Full Plan Text
K0912 Correction Date: 02/24/2026
1. The facility completed receptacle testing data for both floors in resident areas.
2. NHA or designee will educated the Director of Maintenance to ensure receptacles are testing is completed yearly.
3. A monthly audit of the Life Safety binder will be conducted to ensure annual inspection is completed and available for review.
4. NHA or Designee will report identified areas of concern through the Quality Assurance process monthly.
K0912 · Midtown Oaks Health & Rehab Center (PA)
Surveyed 09/17/2025 · Spot-checks: weekly for 4 weeks
Maintenance installed GFCI outlet in the Therapy/Recreation room for the Hydrocollator. The Administrator and/or designee will re-educate Maintenance Director and Maintenance Assistant on…
View Full Plan Text
K0912 Correction Date: 10/14/2025
Maintenance installed GFCI outlet in the Therapy/Recreation room for the Hydrocollator. The Administrator and/or designee will re-educate Maintenance Director and Maintenance Assistant on K0912 specific to GFCI receptacles. Maintenance Director and/or designee will audit facility receptacles to ensure that requirements are met. Results of this audit will be reviewed at the Quality Assurance and Performance Improvement meeting.
K0912 · Lecom at Asbury Ridge DBA Saint Mary's Asbury Ridge (PA)
Surveyed 09/17/2025 · Spot-checks: weekly for 4 weeks
The main floor washing machine receptacle, the main floor laundry sink area receptacle and the main floor kitchen ice machine receptacle will all be replaced with GFCI receptacles by…
View Full Plan Text
K0912 Correction Date: 11/10/2025
The main floor washing machine receptacle, the main floor laundry sink area receptacle and the main floor kitchen ice machine receptacle will all be replaced with GFCI receptacles by 10/03/2025. The Maintenance Supervisor and or designee will complete a Quality Assurance monitor checking all receptacles in the facility to assure that the receptacles meet NFPA/Electrical systems Life safety Code. 10/31/2025 This Quality Assurance monitor will be completed annually in October; this will also be part of the Preventative Maintenace monitoring program. 10/31/2025 Any new outlet/receptacle requests will reviewed by the Maintenance Supervisor and or designee to assure all receptacles meet NFPA/Electrical systems Life Safety Code. 10/31/2025
K0912 · Embassy of Scranton (PA)
Surveyed 07/16/2025 · Spot-checks: weekly for 4 weeks
The annual electrical system inspection will be completed. The Maintenance Director/designee will maintain a complete record of required testing in a binder that will include all required…
View Full Plan Text
K0912 Correction Date: 08/26/2025
The annual electrical system inspection will be completed. The Maintenance Director/designee will maintain a complete record of required testing in a binder that will include all required testing that will be ready and available for inspection. The Administrator will audit the Life Safety Binder monthly to ensure that all required documentation is in place as required for that month. The Maintenance Director/designee will report the weekly audits to the monthly Quality Assurance/Performance Improvement committee monthly for further review and guidance.
K0912 · Manchester Commons of Presbyterian Seniorcare (PA)
Surveyed 07/15/2025 · Spot-checks: weekly for 4 weeks
What systematic changes will be put into place to ensure that the deficiency does not recur, and how the corrective action(s) will be monitored: The non- ground-fault circuit interrupters…
View Full Plan Text
K0912 Correction Date: 08/15/2025
What systematic changes will be put into place to ensure that the deficiency does not recur, and how the corrective action(s) will be monitored: The non- ground-fault circuit interrupters (GFCI) have been in place since the opening to these neighborhoods placed by the contractors. The power receptacles on Eagle Ridge, Avonia Springs, and Blue Herron were all converted to GFCI receptacles. The maintenance team will be educated on the regulation and resulting deficiency. An audit of the outlets on the five skilled nursing communities will be completed to assure no other outlets are out of compliance. What quality assurance program will be put into place, and the dates when corrective action will be completed: The findings of the audit will be shared with the Safety and the Quality Assurance Committees.
K0912 · Avalon Care Center (PA)
Surveyed 06/18/2025 · Spot-checks: weekly for 4 weeks
The electrical receptacle in question will be replaced with a GFCI receptacle. The maintenance staff will be in-serviced on Electrical System receptacles. The maintenance staff/designee will…
View Full Plan Text
K0912 Correction Date: 08/14/2025
The electrical receptacle in question will be replaced with a GFCI receptacle. The maintenance staff will be in-serviced on Electrical System receptacles. The maintenance staff/designee will audit for any receptacles within six feet of sink that are not GFCI protected. The Safety Committee will review the repair to ensure that all corrections are made.
K0912 · John J Kane Regional Center - Glen Hazel (PA)
Surveyed 06/04/2025 · Spot-checks: monthly for 4 weeks
It is the policy of the facility to comply with NFPA 101 Life Safety Code Electrical Systems Receptacles. Room G-30 outlet has been replaced with GFCI outlet. The Environmental Service Manager…
View Full Plan Text
K0912 Correction Date: 07/02/2025
It is the policy of the facility to comply with NFPA 101 Life Safety Code Electrical Systems Receptacles. Room G-30 outlet has been replaced with GFCI outlet. The Environmental Service Manager (ESM)/designee will randomly audit electrical outlets located within six feet of sinks to confirm they are protected by GFCI outlets monthly x
3. The ESM will remedy the problems identified during the audit. The results of the audit will be reviewed and evaluated by the QAPI committee.
K0912 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 04/29/2025 · Spot-checks: monthly for 4 weeks
The Maintenance Director has installed power receptacles, to be Ground Fault Interruption (GFI) protected, within six feet of a water source at the following locations. a. 1 outlet on the 3rd…
View Full Plan Text
K0912 Correction Date: 05/28/2025
The Maintenance Director has installed power receptacles, to be Ground Fault Interruption (GFI) protected, within six feet of a water source at the following locations. a. 1 outlet on the 3rd floor, Residential Laundry Room, b. 1 outlet on the 2nd floor, Residential Laundry Room, c. 1 outlet on the 1st floor, Residential Laundry Room. The Nursing Home Administrator will educate the maintenance team to ensure the installation of power receptacles to be Ground Fault Interruption (GFI) protected, within six feet of a water source. Random monthly audits will be done by Nursing Home Administrator/designee to ensure compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0912 · Chambersburg Skilled Nursing and Rehabilitation Center (PA)
Surveyed 04/16/2025 · Spot-checks: weekly for 2 months
1 and 2. Maintenance Director has updated GFI's in D hall nurses station nourishment room (1 outlet), B hall beauty shop (3 outlets), and main kitchen prep area (2 outlets). 3. Maintenance…
View Full Plan Text
K0912 Correction Date: 06/06/2025
1 and
2. Maintenance Director has updated GFI's in D hall nurses station nourishment room (1 outlet), B hall beauty shop (3 outlets), and main kitchen prep area (2 outlets).
3. Maintenance department will be educated on the standards of maintaining power receptacles to be GFI within six feet of a water source.
4. Maintenance or facility designee will audit facilities GFI receptacles weekly x2 for 2 months then quarterly throughout the year and results of the audit will be reported to the QA Committee.
K0912 · Carnegie Park Post Acute (PA)
Surveyed 04/09/2025 · Spot-checks: weekly for 4 weeks
The Maintenance Director replaced the plug with a GFI plug as required. The maintenance department will implement a building audit to ensure all appliances are properly placed into the correct…
View Full Plan Text
K0912 Correction Date: 05/17/2025
the Maintenance Director replaced the plug with a GFI plug as required. The maintenance department will implement a building audit to ensure all appliances are properly placed into the correct plug within the next two weeks.
K0912 · Jameson Nursing and Rehab Center (PA)
Surveyed 02/25/2025 · Spot-checks: weekly for 4 weeks
The electrical receptacle(s) in question were replaced with GFCI receptacles on 2/28/25. The maintenance staff will be in-serviced on Electrical System GFCI receptacles with a focus on Ice…
View Full Plan Text
K0912 Correction Date: 03/25/2025
The electrical receptacle(s) in question were replaced with GFCI receptacles on 2/28/25. The maintenance staff will be in-serviced on Electrical System GFCI receptacles with a focus on Ice Machines. The Maintenance staff/designee will audit for any receptacles within 6 feet of sink that are not GFCI protected and report any concerns to the Quality Assurance Performance improvement committee. The Safety Committee will review the repair to ensure all corrections are made.
K0912 · Nightingale Nursing and Rehab Center (PA)
Surveyed 02/20/2025 · Spot-checks: weekly for 4 weeks
Upon discovery, the facility has taken corrective action to ensure compliance with electrical safety standards. The Maintenace Direct completed a whole-house audit of receptacles one day post…
View Full Plan Text
K0912 Correction Date: 04/01/2025
Upon discovery, the facility has taken corrective action to ensure compliance with electrical safety standards. The Maintenace Direct completed a whole-house audit of receptacles one day post survey and Ground Fault Circuit Interrupter (GFCI) protection will be installed for all identified receptacles located within six feet of a water source. The Maintenance Director or designee will verify proper installation and functionality. Routine facility inspections will include checks of electrical receptacles to ensure ongoing compliance.