K0712 · Providence Point Healthcare Residence (PA)
Surveyed 07/06/2026 · Spot-checks: monthly for 4 weeks
1. Unable to correct past non-compliance as it relates to fire drills. A Fire drill will be conducted on 3rd shift in July of 2026. A schedule has been created in advance to ensure that a fire…
View Full Plan Text
K0712 Correction Date: 07/31/2026
1. Unable to correct past non-compliance as it relates to fire drills. A Fire drill will be conducted on 3rd shift in July of
2026. A schedule has been created in advance to ensure that a fire drill will be conducted on each shift during each of the remaining two quarters in 2026 and then ongoing.
2. Fire Drills will be audited monthly X 3 months and then monthly thereafter to ensure a fire drill is held on each shift each quarter.
3. Results of audits will be reported at quarterly QA meetings.
4. EVS Director will be responsible for this plan of correction.
K0712 · Avalon Care Center (PA)
Surveyed 06/16/2026 · Spot-checks: weekly for 4 weeks
The Maintenance Department will be reeducated on meeting the required standard for fire drills by the Nursing Home Administrator. Maintenance director will review supporting documentation at…
View Full Plan Text
K0712 Correction Date: 07/16/2026
The Maintenance Department will be reeducated on meeting the required standard for fire drills by the Nursing Home Administrator. Maintenance director will review supporting documentation at least quarterly to QAPI to ensure compliance.
K0712 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: monthly for 4 weeks
The facility was in a state of non-compliance for the fire drill for the first shift in the first quarter - The Maintenance Director was re-educated on the mandate to conduct fire drills…
View Full Plan Text
K0712 Correction Date: 07/20/2026
- The facility was in a state of non-compliance for the fire drill for the first shift in the first quarter - The Maintenance Director was re-educated on the mandate to conduct fire drills quarterly on each shift under varying conditions. - The Director of Maintenance or designee will audit fire drill charts monthly. Monthly audits times 3 will continue with results reported to the QA Committee.
K0712 · Quality Life Services - New Castle (PA)
Surveyed 05/27/2026 · Spot-checks: monthly for 3 months
Revision cannot be made to prior documentation. Maintenance Director Educated on Electrical Systems requirements; required timing of fire drills. NHA or designee will complete monthly audits…
View Full Plan Text
K0712 Correction Date: 07/16/2026
Revision cannot be made to prior documentation. Maintenance Director Educated on Electrical Systems requirements; required timing of fire drills. NHA or designee will complete monthly audits monthly times 3 for 3 months. Results will be brought to Quality Assurance Performance Improvement for review.
K0712 · Luther Crest Nursing Facility (PA)
Surveyed 05/19/2026 · Spot-checks: weekly for 4 weeks
1. The second quarter, second shift fire drill for the preceding twelve - month period of 4/25/25 at 1535 was located at the facility that was completed by Fire Life Safety Solutions. 2.…
View Full Plan Text
K0712 Correction Date: 06/05/2026
1. The second quarter, second shift fire drill for the preceding twelve - month period of 4/25/25 at 1535 was located at the facility that was completed by Fire Life Safety Solutions.
2. Maintenance Director/designee will ensure all the required fire drills paperwork are maintained at the facility post each completed fire drill to ensure compliance.
K0712 · Lancaster Nursing and Rehabilitation Center (PA)
Surveyed 05/13/2026 · Spot-checks: weekly for 4 weeks
Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the…
View Full Plan Text
K0712 Correction Date: 07/02/2026
Preparation and/or execution of this plan of correction does not constitute an admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of Federal and State Law. The plan of correction represents the facility's credible allegation of compliance. K 0712 NFPA fire drills
1. Findings of failed fire drill of one per shift, per quarter cannot be retroactively corrected.
2. Maintenance director or designee will re-educate the facility maintenance team that we need to conduct fire drills one per shift, per quarter.
3. Maintenance director or designee with audit the completion of the fire drills (one per floor, per quarter) and that the documentation is placed in the life safety book. Audit will be completed quarterly and on-going basis.
4. Findings of the audit will be reported to the facility quality assurance performance improvement committee to determine the need for additional actions and or monitoring.
K0712 · Southmont of Presbyterian Seniorcare (PA)
Surveyed 05/13/2026 · Spot-checks: weekly for 4 weeks
On 5/14/26 the facility conducted a 3rd shift a fire drill at 3:00am. Maintenance Director will provide a fire drill schedule for the maintenance staff with dates and times when fire drills…
View Full Plan Text
K0712 Correction Date: 06/15/2026
On 5/14/26 the facility conducted a 3rd shift a fire drill at 3:00am. Maintenance Director will provide a fire drill schedule for the maintenance staff with dates and times when fire drills are to be conducted at various shifts and locations. Maintenance director will educate maintenance staff that fire drills must be completed as per schedule. Maintenance Director or designee will audit the fire drill logbook once a month for the next 6 months to ensure fire drills are being conducted once a month and every fire drill is being conducted on every shift per quarter and report his findings to the QA committee.
K0712 · Richland Bean Blossom Health Care Center (IN)
Surveyed 04/27/2026 · Spot-checks: monthly for 4 weeks
A maintenance records review was conducted for the completion of fire drills per NFPA standards. All residents in the facility have potential to be affected by a deficiency in this practice.…
View Full Plan Text
K0712 A maintenance records review was conducted for the completion of fire drills per NFPA standards. All residents in the facility have potential to be affected by a deficiency in this practice. Director and Maintenance Assistant. Audits for the timely completion of fire drills will be performed by the Executive Director or designee monthly x 6 months or until 100% compliance is achieved. Results of these audits will be presented to the QA committee, and any recommendations for changes or updates by the QA committee will be put into place as indicated. These systemic changes will be in place on or before 05/30/2026
K0712 · The Gardens for Memory Care at Easton (PA)
Surveyed 04/20/2026 · Spot-checks: monthly for 4 weeks
1. Failure to conduct fire drills for calendar year 2025. 2. Education on to Maintenance staff on the timeliness of fire drills. 3. NHA to audit the timeliness of the fire drills 4. Audits…
View Full Plan Text
K0712 Correction Date: 05/19/2026
K0712
1. Failure to conduct fire drills for calendar year 2025.
2. Education on to Maintenance staff on the timeliness of fire drills.
3. NHA to audit the timeliness of the fire drills
4. Audits will be submitted to QAPI monthly
5. Date of Compliance: May 19, 2026
K0712 · Hempfield Manor (PA)
Surveyed 03/10/2026 · Spot-checks: monthly for 4 weeks
On 3/10/26, the documentation provided to Surveyor revealed a fire drill was not completed for third shift in the second quarter of the required drills. Maintenance Director educated on fire…
View Full Plan Text
K0712 Correction Date: 04/14/2026
On 3/10/26, the documentation provided to Surveyor revealed a fire drill was not completed for third shift in the second quarter of the required drills. Maintenance Director educated on fire drill frequency and alternating shifts each quarter over 12 months by Nursing Home administrator. The Maintenance Director or Designee will provide a yearly schedule of fire drills including each shift per quarter. Fire drills will be audited by Maintenance Director monthly for three months, then quarterly. Results of Audits will be reviewed at quarterly QAPI meetings.
K0712 · Marywood Heights (PA)
Surveyed 03/10/2026 · Spot-checks: monthly for 4 weeks
Facility is unable to retroactively correct the deficiency. Maintenance director or designee will complete monthly audits and submit to QAPI committee to ensure fire drills are being completed…
View Full Plan Text
K0712 Correction Date: 03/31/2026
Facility is unable to retroactively correct the deficiency. Maintenance director or designee will complete monthly audits and submit to QAPI committee to ensure fire drills are being completed on all shifts per regulations.
K0712 · Edenbrook South (PA)
Surveyed 02/18/2026 · Spot-checks: monthly for 4 weeks
1. The Maintenance Department will receive education related to the expectation to vary the timing of fire drills to ensure the drills are less expected by staff. 2. Audits will be conducted…
View Full Plan Text
K0712 Correction Date: 04/07/2026
1. The Maintenance Department will receive education related to the expectation to vary the timing of fire drills to ensure the drills are less expected by staff.
2. Audits will be conducted by the Nursing Home Administrator/designee to validate that fire drills are completed at least quarterly on each shift and are held at expected and unexpected times. Audits will be conducted monthly for three months. Audit results will be submitted to the facility QAPI (Quality Assurance Performance Improvement) Committee for review. Date of compliance: April 7, 2026.
K0712 · Greenfield Healthcare and Rehabilitation Center (PA)
Surveyed 01/28/2026 · Spot-checks: monthly for 4 weeks
1. A fire drill has been held on 3rd shift at a random time, not between the hours of 5 and 6am. 2. Future fire drills will be randomized in timing. Maintenance Director will report on timing…
View Full Plan Text
K0712 Correction Date: 02/24/2026
1. A fire drill has been held on 3rd shift at a random time, not between the hours of 5 and 6am.
2. Future fire drills will be randomized in timing. Maintenance Director will report on timing of drills after the fact to administrator if they are not present during the drill.
3. Quality Assurance Committee will review fire drill timing during monthly meeting. Monitored by Administrator or Designee.
K0712 · New Eastwood Healthcare and Rehabilitation Center (PA)
Surveyed 01/22/2026 · Spot-checks: monthly for 4 weeks
1. Facility located the third shift, fourth quarter fire drill documentation after surveyor left facility. Moving forward fire drills will be conducted during various parts of the month. 2.…
View Full Plan Text
K0712 Correction Date: 02/24/2026
1. Facility located the third shift, fourth quarter fire drill documentation after surveyor left facility. Moving forward fire drills will be conducted during various parts of the month.
2. NHA or designee will educated the Director of Maintenance to sure fire drills are during various parts of the month.
3. NHA or designee to audit quarterly to ensure fire drills are not during the same week of each month.
4. NHA or Designee will report identified areas of concern through the Quality Assurance process monthly.
K0712 · Embassy of East Mountain (PA)
Surveyed 01/13/2026 · Spot-checks: weekly for 4 weeks
On 1/20/2026 the Maintenance Director established a schedule for fire drills in the facilities preventive maintenance system, TELS. This schedule ensures proper spacing / timing of drills.…
View Full Plan Text
K0712 Correction Date: 02/09/2026
On 1/20/2026 the Maintenance Director established a schedule for fire drills in the facilities preventive maintenance system, TELS. This schedule ensures proper spacing / timing of drills. Education was provided to the maintenance director on the requirement / importance of ensuring that fire drills happen at proper timing / spacing. Results of fire drills will be reviewed ongoingly at the facilities next QAPI meeting.