K0363 · Concordia at Rp Home (PA)
Surveyed 08/17/2026 · Spot-checks: monthly for 4 weeks
1) Corridor door to resident room latches and closes upon discovery (removed enhanced barrier precaution supplies) 2) Corridor door to 309 latches and closes upon discovery (removed enhanced…
View Full Plan Text
K0363 Correction Date: 10/01/2026
1) Corridor door to resident room latches and closes upon discovery (removed enhanced barrier precaution supplies) 2) Corridor door to 309 latches and closes upon discovery (removed enhanced barrier precaution supplies) 3) resident room door was repaired with working doorknob 8/17/26. Work order on file with NHA. 4) Monitor resident doors monthly to ensure they latch and secure and with working doorknobs. 5) Staff re-educated to not store enhanced barrier precaution supplies on resident hallway door and to report when door is not in working condition. Education on file with NHA. 6) QAPI committee provided monitor and tracking
K0363 · Aventura at Pembrooke (PA)
Surveyed 07/08/2026 · Spot-checks: monthly for 4 weeks
0363: Corridor - Doors: The facility failed to maintain the positive latching of corridor doors, affecting two of seven smoke compartments within the component No residents were affected. All…
View Full Plan Text
K0363 Correction Date: 08/05/2026
0363: Corridor - Doors: The facility failed to maintain the positive latching of corridor doors, affecting two of seven smoke compartments within the component No residents were affected. All residents have the potential to be affected. The hardware was replaced to the door opening to the Employee lounge by the Director of Maintenance. A whole house audit was completed by the Director of Maintenance/designee on 17JUL2026 to ensure all door strike plates are free from obstruction and close without impairment. An audit of the facility's remaining resident corridor doors was completed on 17JUL2026 by the Director of Maintenance/designee to ensure that all doors meet the regulatory requirement for latching hardware. On 21JUL2026, NHA educated Director of Maintenance and maintenance staff on maintaining corridor doors to meet the requirement of smoke tight integrity and latch properly. The Maintenance Director/Designee will conduct monthly random audits of corridor doors to check function and integrity. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to the quarterly Quality Assurance Performance Improvement Committee for review and recommendations.
K0363 · Sanatoga Center (PA)
Surveyed 07/01/2026 · Spot-checks: monthly for 4 weeks
The corridor doors identified during Life Safety code survey were immediately adjusted to ensure proper operation. The doors were tested to verify they close completely and latch to frame, and…
View Full Plan Text
K0363 Correction Date: 08/11/2026
The corridor doors identified during Life Safety code survey were immediately adjusted to ensure proper operation. The doors were tested to verify they close completely and latch to frame, and maintain the required resistance to processing smoke. The hardware identified for replacement is in the process of installation. The Maintenance Director/designee conducted a facility wide inspection of all corridor doors to verify they close properly, positively latch, and are free of excessive gaps or damage. Any additional deficiencies identified during inspection were corrected immediately. The Maintenance director/designee will include routine inspection of all corridor doors monthly. The maintenance director was educated on Life Safety Code requirements related to corridor doors, including positive latching, self closing function, and maintaining smoke-resistant construction. Any deficiencies identified during routine inspection will be corrected promptly and documented The Maintenance Director/designee will perform and document monthly audits of corridor door compliance x 3 months to verify continued compliance. Results will be reviewed during QAPI x 3 months
K0363 · Chapel Manor (PA)
Surveyed 06/30/2026 · Spot-checks: weekly for 4 weeks
1. Room C205 and basement kitchen doors have been repaired to ensure the door properly closes and latches. 2. NHA will educate the Maintenance department to ensure all corridor doors close and…
View Full Plan Text
K0363 Correction Date: 08/12/2026
1.Room C205 and basement kitchen doors have been repaired to ensure the door properly closes and latches. 2.NHA will educate the Maintenance department to ensure all corridor doors close and latch as designed. 3.NHA/designee will complete random weekly audits x 3 weeks and monthly x 1 month to ensure that all corridor doors close and latch as designed. 4.Maintenance Director will report audit findings to the QAPI Committee x 3 months for review.
K0363 · Phoebe Allentown Health Care Center (PA)
Surveyed 06/23/2026 · Spot-checks: monthly for 4 weeks
The distance between the basement-level Dietary doors was corrected on 07/02/2026 by using approved fire rated trim. Perform monthly rounds for a quarter to make sure we are compliant and…
View Full Plan Text
K0363 Correction Date: 08/03/2026
The distance between the basement-level Dietary doors was corrected on 07/02/2026 by using approved fire rated trim. Perform monthly rounds for a quarter to make sure we are compliant and report out on our findings in our monthly QAPI meeting.
K0363 · Caring Heart Rehabilitation and Nursing Center (PA)
Surveyed 06/03/2026 · Spot-checks: weekly for 4 weeks
The first-floor Break Room corridor door hardware was adjusted to ensure automatic closing and positive latching. - The Maintenance Director was re-educated on repairing door alignment and…
View Full Plan Text
K0363 Correction Date: 07/20/2026
- The first-floor Break Room corridor door hardware was adjusted to ensure automatic closing and positive latching. - The Maintenance Director was re-educated on repairing door alignment and hardware to maintain smoke resistance barriers. - The Director of Maintenance or designee will audit break room door latching weekly x
4. Monthly audits times 3 will continue with results reported to the QA Committee.
K0363 · Advanced Health Care of Hanover (PA)
Surveyed 05/29/2026 · Spot-checks: monthly for 4 weeks
What systematic changes will be put into place to ensure that the deficiency does not recur, and how the corrective action(s) will be monitored: resident room and 117 will be repaired. All…
View Full Plan Text
K0363 Correction Date: 07/28/2026
What systematic changes will be put into place to ensure that the deficiency does not recur, and how the corrective action(s) will be monitored: resident room and 117 will be repaired. All doors were reviewed for similar smoke containment failure and will be adjusted to meet requirement. This will be completed effective 7/28/2026. What quality assurance program will be put into place, and the dates when corrective action will be completed. Monthly during fire drill training all doors will be checked for smoke containment and this will be documented in the fire drill report. The corrective action will be completed by 7/28/2026.
K0363 · Arbor Grove Village (IN)
Surveyed 05/27/2026 · Spot-checks: monthly for 4 weeks
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. Doors…
View Full Plan Text
K0363
Completion Date: 06/25/2026
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. Doors for RR#408 and RR# 206 were adjusted and device to hold doors open were removed. (See attachment J, K)
2. How other residents having Maintenance director in-serviced on 5/28/26 on corridor doors to have no impediments or obstructions preventing them from closure. Doors for RR#408 and RR # 206 were adjusted and device to hold doors open were removed(5/28/26). (See attachment)
3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur; Maintenance director or designee will use Life safety code/QAPI tool to audit door closures to ensure deficient practice does not recur.
4. How the corrective action will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place. Maintenance Director or designee will complete ongoing monitoring via QAPI program with meetings held bi-monthly and is overseen by the Executive Director. The review. The results of these audits will be reviewed by the QAPI committee, if threshold of 100% is not achieved an action plan will be revised/completed.
K0363 · Northampton Post Acute (PA)
Surveyed 05/27/2026 · Spot-checks: weekly for 4 weeks
1. The PT Gym door was made to close when released from the magnetic hold-open device on May 27, 2026. 2. Maintenance Director/Designee will conduct weekly random audits for 4 weeks to ensure…
View Full Plan Text
K0363 Correction Date: 06/12/2026
1. The PT Gym door was made to close when released from the magnetic hold-open device on May 27, 2026.
2. Maintenance Director/Designee will conduct weekly random audits for 4 weeks to ensure that all doors close without drag. Findings of the audits will be reported to the Quality Assurance Performance Improvement (QAPI) Committee for further action planning if required.
K0363 · Embassy of Scranton (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
The third-floor med charting room door was adjusted and now fully latches. The unapproved means holding open the second and third floor medication rooms doors have been removed. The…
View Full Plan Text
K0363 Correction Date: 06/30/2026
The third-floor med charting room door was adjusted and now fully latches. The unapproved means holding open the second and third floor medication rooms doors have been removed. The Maintenance Director/designee will audit medication rooms and charting room doors weekly x 4, then monthly to ensure they are not being held open by unapproved means and fully latch. These audits will be brought to the monthly QAPI committee meeting for further review and recommendations.
K0363 · Laurel Lakes Rehabilitation and Wellness Center (PA)
Surveyed 05/06/2026 · Spot-checks: monthly for 4 weeks
1. The unprotected penetrations identified above the door hardware on the Zone 1 East Side "C" Wing Clean Linen Room door and the Zone 2 "F" Wing Clean Linen Room door were repaired using…
View Full Plan Text
K0363 Correction Date: 06/25/2026
1. The unprotected penetrations identified above the door hardware on the Zone 1 East Side "C" Wing Clean Linen Room door and the Zone 2 "F" Wing Clean Linen Room door were repaired using approved materials and methods to restore the smoke-resistant integrity of the corridor doors in accordance with NFPA 101 requirements.
2. The Director of Plant Operations, or designee, conducted a facility-wide inspection of corridor doors to identify any additional penetrations, hardware deficiencies, or conditions that could compromise smoke resistance. Any additional deficiencies identified during the inspection were corrected.
3. Maintenance staff were educated regarding NFPA 101 corridor door requirements and the importance of maintaining smoke-resistant assemblies.
4. The Director of Plant Operations, or designee, will: - Perform and document monthly inspections of corridor doors for three months, then quarterly thereafter. - Review inspection findings through the facility's Quality Assurance and Performance Improvement (QAPI) process. - Ensure any identified deficiencies are corrected promptly.
K0363 · Spring Creek Rehabilitation and Nursing Center (PA)
Surveyed 05/01/2026 · Spot-checks: monthly for 4 weeks
A. The 4th floor, door to the Nursery, across from Resident resident room will be adjusted to positively latch within the door frame. b. The 2nd floor, door to the Break Room, across from…
View Full Plan Text
K0363 Correction Date: 06/03/2026
a. The 4th floor, door to the Nursery, across from Resident resident room will be adjusted to positively latch within the door frame. b. The 2nd floor, door to the Break Room, across from Resident resident room will be adjusted to positively latch within the door frame. c. 2nd floor, door to the Social Services Room, across from Resident resident room will be adjusted to positively latch within the door frame. d. 1st floor, door to the Linen Room, across from Resident resident room will be positively latch within the door frame
2. The unprotected penetration of the door, to the 3rd floor Unit Manager's Office, above the door knob was removed. The Nursing Home Administrator will educate the Maintenance Director and Maintenance team to ensure all doors are positively latched with the frame. Random monthly audits will be done by the Maintenance Director/designee to ensure all compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.
K0363 · Cedarbrook Senior Care and Rehabilitation (PA)
Surveyed 04/29/2026 · Spot-checks: monthly for 3 months
1. a) An astragal was installed at Resident resident room door to ensure smoke integrity. Facility staff will monitor the doors to ensure they maintain smoke integrity on a monthly basis for 3…
View Full Plan Text
K0363 Correction Date: 06/09/2026
1. a) An astragal was installed at Resident resident room door to ensure smoke integrity. Facility staff will monitor the doors to ensure they maintain smoke integrity on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee. b) Adjustments were made to Resident resident room door to ensure it fully closes and latches within its frame. Facility staff will monitor the doors to ensure they operate as designed to fully close and latch within its frame on a monthly basis for 3 months. Any non-compliance will be reported at the Quality Assurance Committee.
K0363 · Riverstreet Manor (PA)
Surveyed 04/27/2026 · Spot-checks: weekly for 4 weeks
All corridor opening doors will be inspected for positive latching and to ensure gaps do not exceed one eighth inch. All future work orders and inspections will be monitored through TELS work…
View Full Plan Text
K0363 Correction Date: 06/26/2026
All corridor opening doors will be inspected for positive latching and to ensure gaps do not exceed one eighth inch. All future work orders and inspections will be monitored through TELS work order system and documentation will be filed in Life Safety Binder.
K0363 · Gino J. Merli Veterans Center (PA)
Surveyed 04/21/2026 · Spot-checks: weekly for 8 weeks
Resident room door was immediately adjusted to insure proper closure. Resident room doors were inspected and adjusted. Random audits of resident room door closure will be conducted on 5 doors…
View Full Plan Text
K0363 Correction Date: 06/09/2026
resident room door was immediately adjusted to insure proper closure. Resident room doors were inspected and adjusted. Random audits of resident room door closure will be conducted on 5 doors on each nursing unit weekly for 8 weeks. Corridor doors will be inspected semi-annually for proper closure. Any doors found to be not closing properly are adjusted or replaced.