Past Winning Plans
Real state-approved Plans of Correction and their spot-check schedules.
Federal CMS Precedents Shown for Alaska: CMS SOM § 7304 Plan-of-Correction rules apply nationwide. Below are verified Passed-Revisit examples you can adapt for Alaska, or view local county stats in
Alaska State Guides →
K0919 · Embassy of Scranton (PA)
Surveyed 05/26/2026 · Spot-checks: weekly for 4 weeks
Any storage kept in the basement-level electrical room was relocated to ensure a clearance of 36 inches from electrical panels. The Maintenance Director/designee will audit the basement-level…
View Full Plan Text
K0919 Correction Date: 06/30/2026
Any storage kept in the basement-level electrical room was relocated to ensure a clearance of 36 inches from electrical panels. The Maintenance Director/designee will audit the basement-level electrical room weekly x 4, then monthly to ensure that a clearance of 36 inches from the electrical panels is maintained for any storage. These audits will be brought to the monthly QAPI committee meeting for further review and recommendations.
K0919 · Pocopson Home (PA)
Surveyed 04/01/2026 · Spot-checks: weekly for 4 weeks
1. The junction box, located within the West Wing tunnel (closest to the fire alarm strobe) has been covered with a junction box cover plate. The Maintenance department staff will inspect all…
View Full Plan Text
K0919 Correction Date: 04/02/2026
1.The junction box, located within the West Wing tunnel (closest to the fire alarm strobe) has been covered with a junction box cover plate. The Maintenance department staff will inspect all electrical junction boxes for the correct installation of covers during their weekly maintenance rounds. Audit results will be reported to the Quality Improvement/Infection Control Committee Preparation and submission of this Plan of Correction is required by State and Federal law. This Plan of Correction does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding.
K0919 · Westmoreland Manor (PA)
Surveyed 05/01/2025 · Spot-checks: weekly for 4 weeks
Preparation and/or execution of this plan of correction does not constitute admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement…
View Full Plan Text
K0919 Correction Date: 05/14/2025
Preparation and/or execution of this plan of correction does not constitute admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of federal and state law. Maintenance removed the wheelchairs in the second-floor b-wing storage room that were obstructing the electrical panels on 5/1/2025. The Director of Maintenance/designee will conduct random weekly audits throughout the facility two times per week for two weeks then weekly for two weeks to ensure there are no electrical panels obstructed by wheelchairs. The results of these audits will be brought to the Quality Assurance and Performance Improvement Committee for further analysis and corrective actions.
K0919 · The Manor at St. Luke Village (PA)
Surveyed 04/01/2025 · Spot-checks: weekly for 2 weeks
1. The two junction boxes were secured at the area observed. 2. A baseline audit was completed, to ensure no other junction boxes were unsecured. 3. The Administrator educated the Director of…
View Full Plan Text
K0919 Correction Date: 04/11/2025
1. The two junction boxes were secured at the area observed.
2. A baseline audit was completed, to ensure no other junction boxes were unsecured.
3. The Administrator educated the Director of Maintenance on K0919 and the necessity of securing junction boxes as required.
4. The Director of Maintenance, or designee will randomly audit locations within the Facility to ensure junction boxes are secured, 3 times a week for two weeks, weekly for 2 weeks and monthly for two months. The results of the audits will be forwarded to QAPI committee for further review and recommendations.
5. Date of Compliance: 4/11/2025
K0919 · Edenbrook South (PA)
Surveyed 01/06/2025 · Spot-checks: weekly for 4 weeks
Cited: The electrical box was repaired on 1/10/25. Sweep: All electrical boxes in ceiling will be audited to ensure they have a cover. Education: Maintenance director will be educated by NHA…
View Full Plan Text
K0919 Correction Date: 02/10/2025
Cited: The electrical box was repaired on 1/10/25. Sweep: All electrical boxes in ceiling will be audited to ensure they have a cover. Education: Maintenance director will be educated by NHA on K0919 regulations. Audits: Maintenance Director/ designee will audit 3 electrical junction boxes weekly x4 weeks to ensure proper covering. Results will be taken through QAPI.