Wyoming K-918 Plan of Correction Guide
K0918 · Electrical Systems - Essential Electric System Maintenance and Generator Testing
Build K-918 Plan & Binder →
✓
2025–26 WY Citations: 19
✓
Common Audit Schedule: weekly for 4 weeks
✓
Checklist Source: LSC-K0918
In Wyoming, state surveyors recorded 19 citations for K0918 (K-918: Electrical Systems - Essential Electric System Maintenance and Generator Testing) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Wyoming were most active in Fremont, Sheridan, Natrona counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.
What Surveyors Check Onsite
- Are weekly generator visual inspections (fuel, battery electrolyte/specific gravity, coolant, oil) logged every single week?
- Are monthly 30-minute dynamic load tests (>= 30% nameplate kW or exhaust temperature threshold) documented for all 12 months?
- Are transfer switch time-delay seconds (< 10 seconds to restore emergency power) recorded on every monthly test sheet?
3-Question Hallway Spot-Quiz
Review with nurses & CNAs during your 5-minute shift huddle:
- Which color electrical outlets at the nurses' station and resident rooms stay powered by the emergency generator?
- Where is the emergency generator inspection binder stored if a Life Safety surveyor asks to review the last 12 monthly load tests?
- Within how many seconds must emergency generator power come on if utility power fails?
Approved State Plan Examples for K0918
Margaret E. Moul Home (PA)
Spot-checks: monthly × 3 months
✓ Passed Re-Inspection
1. Maintenance and testing of the generator and transfer switches will be performed in accordance with NFPA 110. One year monthly conductance testing and 30 minute load testing with transfer…
View Full Plan Text (08/24/2026)
K0918 Correction Date: 09/30/2026
1. Maintenance and testing of the generator and transfer switches will be performed in accordance with NFPA
110. One year monthly conductance testing and 30 minute load testing with transfer switch was completed and will continue to be completed each month by Director of Environmental Services or designee. Facility has also added an additional line on its monthly generator testing documentation form, to now include the actual number of minutes that the emergency generator runs for during required testing.
2. The emergency generator documentation form will be maintained according to the NFPA 101 standards.
3. Director of Environmental Services or designee will audit the emergency generator documentation monthly for 3 months, and then quarterly for 3 quarters. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
Majestic Care of McCordsville (IN)
Spot-checks: weekly × 4 weeks
✓ Passed Re-Inspection
Corrective Action for the Finding: The facility reviewed the weekly exercising documentation cannot be retroactively completed. Any required generator exercising, testing, inspection,…
View Full Plan Text (08/11/2026)
K0918
Completion Date: 09/30/2026
K0918 Corrective Action for the Finding: The facility reviewed the weekly exercising documentation cannot be retroactively completed. Any required generator exercising, testing, inspection, maintenance, or documentation that was non-compliant was reviewed, along with identifying corrective steps to maintain full compliance moving forward. Identification of Other Residents/Areas Potentially affected: The facility recognizes that a deficiency involving the generator and related essential electrical system components may potentially affect all residents, staff, and visitors during a power interruption or emergency. The facility therefore reviewed its exercise and testing schedule and documentation process to ensure compliance with this mandatory requirement. Systemic Correction: Tutorial with the Maintenance Director regarding documentation for monthly generator and essential testing results, generator logs, and other applicable records will be maintained in the facility's Life Safety/ Generator records and in TELS. The Maintenance Director will provide monthly testing of the generator starting battery before 9/30/2026. The Maintenance Director will work with Generator Systems to complete the 3-year, 4-hour testing on or before 9/30/2026. Monitoring: The QAPI Committee will monitor the monthly generator battery testing X 6 months to ensure we are in compliance with monthly testing. The QAPI Committee will review the 3-year, 4-hour generator testing yearly in January to schedule Generator Systems for the 3-year, 4-hour test when needed. The ED/Designee will oversee.