SA SurveyAnchor
State Guides › South Carolina › F-921 (F0921)

South Carolina F-921 Plan of Correction Guide

F0921 · Safe, Functional, Sanitary, and Comfortable Physical Environment

Build F-921 Plan & Binder →
✓ 2025–26 SC Citations: 6
✓ Common Audit Schedule: daily for 4 weeks
✓ Checklist Source: CMS SOM § 7304

In South Carolina, state surveyors recorded 6 citations for F0921 (F-921: Safe, Functional, Sanitary, and Comfortable Physical Environment) across recent 2025-2026 skilled nursing facility inspections. Recent citations in South Carolina were most active in Sumter, Richland, Lexington counties. To clear an onsite revisit without repeat deficiencies, Director of Nursing or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and daily for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active SC Counties: Sumter County (1) → Richland County (1) → Lexington County (1) → Horry County (1) → Greenville County (1) →

What Surveyors Check Onsite

  • Were all residents cited on Form CMS-2567 under F0921 assessed immediately with documented physician or nursing follow-up?
  • Did nursing leadership complete a house-wide review of other residents with similar care risks?
  • Were licensed nurses and CNAs educated on safe, functional, sanitary, and comfortable physical environment with signed shift attendance rosters?
  • Are daily for 4 weeks audit tool results reported to the monthly QAPI committee until full compliance is sustained?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. What immediate nursing check do you complete on shift to prevent a repeat citation under F-921?
  2. Where on the resident care plan or MAR do you verify active orders before providing care?
  3. Who conducts weekly unit spot-checks and reviews any missed items with staff right away?

Approved State Plan Examples for F0921

Harrison Terrace (IN)
Spot-checks: daily × 4 weeks ✓ Passed Re-Inspection

Resident room electrical outlet now has a cover. - resident room bathroom wall is repaired. How will you identify other residents having the potential - All residents in our facility have the…

View Full Plan Text (09/21/2026)
F0921 - Safe/Functional/Sanitary/Com fortable Environment What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice - resident room electrical outlet now has a cover. - resident room bathroom wall is repaired. How will you identify other residents having the potential - All residents in our facility have the potential to be affected by the same deficient practice. A facility wide audit has been completed for these items. - Director of Maintenance to be in-serviced on appropriate covers for electrical outlets and for appropriate bathroom wall repair processes by the Executive Director/designee by 10/19/26. What measures will be put into place or what systemic changes you will make to ensure that the deficient practice does not recur. - Director of Maintenance to be in-serviced on appropriate covers for electrical outlets and for appropriate bathroom wall repair processes by will check resident rooms for electrical outlet covers and for any needed wall repairs during daily rounds. The Director of Maintenance will be informed of repairs needed or missing outlet covers. How the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place. - The Environment QAPI Tool will be utilized by the ED/designee weekly x 4 weeks, monthly x 5 months, and quarterly thereafter for one year. Data will be submitted to the QAPI committee for follow up. If 95% a threshold is not achieved, an action plan will be developed to ensure compliance. Date of compliance:10/19/2026
Arbor Grove Village (IN)
Spot-checks: daily × 4 weeks ✓ Passed Re-Inspection

Maintenance Director/Designee will complete daily water temperature checks x 30 days, then weekly thereafter. Water temperatures will be discussed and documented during morning meeting. 4) How…

View Full Plan Text (04/24/2026)
F0921 Completion Date: 05/22/2026 F 921 It is the standard of this facility to provide a home like affected by the deficient practice? The water heater was immediately turned down on 4/20/26 with a follow up water temperature completed within normal range when rechecked. 2) How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action(s) will be taken. All residents have the potential to be affected by the alleged deficient practice. An audit of the last 30 days of water temperatures were completed. 3) What measures will be put into place or what systemic changes will be made to ensure that the deficient practice does not recur? Maintenance Director/Designee will complete daily water temperature checks x 30 days, then weekly thereafter. Water temperatures will be discussed and documented during morning meeting. 4) How the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e. what quality assurance program will be put into place? To ensure compliance the Maintenance director/Designee will complete a water management CQI audit tool weekly x 4 weeks, monthly x 6 months, then quarterly x 6 months. If a 100% threshold is not achieved, a different action plan will be developed to ensure compliance. Results will be reported to QAPI committee. 5) Completion Date: 5/22/25
Customize & Print 4-Sheet Revisit Binder →