✓ 2025–26 PA Citations: 5
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Pennsylvania, state surveyors recorded 5 citations for K0929 (K-929: Gas, Vacuum, and Electrical Systems Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Mifflin, Lebanon, Lancaster counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active PA Counties: Mifflin County (1) → Lebanon County (1) → Lancaster County (1) → Cumberland County (1) → Chester County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0929 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-929, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0929

The Gardens at West Shore (PA)
Spot-checks: monthly × 12 months ✓ Passed Re-Inspection

1. The unsecured "E" tank in the Transport Storage room was removed and secured in an appropriate oxygen storage location. 2. Maintenance Director/Designee will conduct an audit of storge…

View Full Plan Text (08/20/2025)
K0929 Correction Date: 09/23/2025 K0929 1. The unsecured "E" tank in the Transport Storage room was removed and secured in an appropriate oxygen storage location. 2. Maintenance Director/Designee will conduct an audit of storge rooms to ensure unsecured "E" tanks are not present. If an unsecured "E" tank is found, it will be removed and secured in an appropriate oxygen storage location. 3. Maintenance Director/Designee will re-educate the transportation department and ensuring that unsecured "E" tanks are not stored in the transportation supply room. 4. Maintenance Director/Designee will conduct an audit of storge rooms to ensure unsecured "E" tanks are not present monthly for 12 months. Results to QAPI. 5. Date of Compliance 9/23/25
Rose City Nursing and Rehab at Lancaster (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. The oxygen cylinders that were unsecured were secured and placed appropriately in racks on 04-08-2025. 2. Maintenance Director and Director of Nursing, or designees, will educate…

View Full Plan Text (04/08/2025)
K0929 Correction Date: 04/29/2025 1. The oxygen cylinders that were unsecured were secured and placed appropriately in racks on 04-08-2025. 2. Maintenance Director and Director of Nursing, or designees, will educate maintenance and nursing staff on properly securing oxygen cylinders. Maintenance Director will audit weekly for two weeks, then monthly to ensure that oxygen cylinders are properly secured in racks. Results of audits will be submitted to monthly QAPI for review and recommendations.
Alpine Valley Post Acute and Healthcare Center (PA)
Spot-checks: monthly × 2 months Approved Filing

1. The E Tank in closet near resident room was placed in proper holder during survey. 2. NHA, Maintenance Team and Licensed nursing staff educated that the E Tanks need to be stored in…

View Full Plan Text (09/02/2026)
K0929 Correction Date: 09/17/2026 1. The E Tank in closet near resident room was placed in proper holder during survey. 2. NHA, Maintenance Team and Licensed nursing staff educated that the E Tanks need to be stored in identified holders when placed in storage. 3. Maintenance Director or designee will complete random audits monthly for 2 months and then quarterly for 12 months to ensure E Tanks are stored in identified holders when in storage. Audit findings will be reported to the monthly QAA for review and recommendations.