Pennsylvania K-918 Plan of Correction Guide
K0918 · Electrical Systems - Essential Electric System Maintenance and Generator Testing
Build K-918 Plan & Binder →
✓
2025–26 PA Citations: 200
✓
Common Audit Schedule: weekly for 4 weeks
✓
Checklist Source: LSC-K0918
In Pennsylvania, state surveyors recorded 200 citations for K0918 (K-918: Electrical Systems - Essential Electric System Maintenance and Generator Testing) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Montgomery, Philadelphia, Allegheny counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.
What Surveyors Check Onsite
- Are weekly generator visual inspections (fuel, battery electrolyte/specific gravity, coolant, oil) logged every single week?
- Are monthly 30-minute dynamic load tests (>= 30% nameplate kW or exhaust temperature threshold) documented for all 12 months?
- Are transfer switch time-delay seconds (< 10 seconds to restore emergency power) recorded on every monthly test sheet?
3-Question Hallway Spot-Quiz
Review with nurses & CNAs during your 5-minute shift huddle:
- Which color electrical outlets at the nurses' station and resident rooms stay powered by the emergency generator?
- Where is the emergency generator inspection binder stored if a Life Safety surveyor asks to review the last 12 monthly load tests?
- Within how many seconds must emergency generator power come on if utility power fails?
Approved State Plan Examples for K0918
Margaret E. Moul Home (PA)
Spot-checks: monthly × 3 months
✓ Passed Re-Inspection
1. Maintenance and testing of the generator and transfer switches will be performed in accordance with NFPA 110. One year monthly conductance testing and 30 minute load testing with transfer…
View Full Plan Text (08/24/2026)
K0918 Correction Date: 09/30/2026
1. Maintenance and testing of the generator and transfer switches will be performed in accordance with NFPA
110. One year monthly conductance testing and 30 minute load testing with transfer switch was completed and will continue to be completed each month by Director of Environmental Services or designee. Facility has also added an additional line on its monthly generator testing documentation form, to now include the actual number of minutes that the emergency generator runs for during required testing.
2. The emergency generator documentation form will be maintained according to the NFPA 101 standards.
3. Director of Environmental Services or designee will audit the emergency generator documentation monthly for 3 months, and then quarterly for 3 quarters. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
Graduate Post Acute (PA)
Spot-checks: monthly × 4 weeks
✓ Passed Re-Inspection
1. An appropriate battery conductance tester was obtained. The generator's maintenance-free batteries were tested, and the required conductance results were recorded in the generator…
View Full Plan Text (08/11/2026)
K0918 Correction Date: 09/23/2026
1. An appropriate battery conductance tester was obtained. The generator's maintenance-free batteries were tested, and the required conductance results were recorded in the generator maintenance records.
2. The Maintenance Director/designee reviewed the generator maintenance records. Missing battery tests and maintenance documentation were identified and corrected.
3. Maintenance staff were educated on generator battery conductance testing, required frequency, proper documentation, and record-retention requirements.
4. The Administrator/designee will audit generator maintenance records monthly for three months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
Manchester Commons of Presbyterian Seniorcare (PA)
Spot-checks: weekly × 4 weeks
✓ Passed Re-Inspection
1. The new equipment for the maintenance free battery testing was received .The four hour load tests have been scheduled with Cleveland Brothers and will be completed by 8/6/2026, as will the…
View Full Plan Text (07/22/2026)
K0918 Correction Date: 09/14/2026
1. The new equipment for the maintenance free battery testing was received .The four hour load tests have been scheduled with Cleveland Brothers and will be completed by 8/6/2026, as will the battery conductance tests. The four hour load test has been entered into Worxhub so that the work orders will generate at the required cadence to assure this is not missed in the future. The battery conductance testing has been added to the Cummings monthly report and will be completed and reported to NHA monthly.
2. The survey results will be reviewed at our weekly and quarterly quality meeting, as will dates when corrective action will be completed.