2025–26 PA Citations: 32
✓
Common Audit Schedule: weekly for 4 weeks
✓
Checklist Source: CMS Life Safety Code
In Pennsylvania, state surveyors recorded 32 citations for K0914 (K-914: Gas, Vacuum, and Electrical Systems Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Montgomery, Philadelphia, Delaware counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.
What Surveyors Check Onsite
- Are physical building zones cited under K0914 inspected on every shift and logged in the maintenance binder?
- Have maintenance staff verified and documented immediate physical repair with dated work orders?
- Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?
3-Question Hallway Spot-Quiz
Review with nurses & CNAs during your 5-minute shift huddle:
- If you spot an equipment or corridor safety issue related to K-914, how do you report an urgent maintenance order?
- Where are weekly Life Safety inspection logs kept when state surveyors arrive?
- What safety check happens on your unit before ending your shift?
Approved State Plan Examples for K0914
Fairlane Gardens Nursing and Rehab at Reading (PA)
Spot-checks: weekly × 4 weeks
✓ Passed Re-Inspection
1) The annual inspection and testing of the electrical outlets in the patient care areas, in three of four smoke zones within the components has been completed. 2) Maintenance director will be…
View Full Plan Text (07/29/2026)
K0914 Correction Date: 09/15/2026
1) The annual inspection and testing of the electrical outlets in the patient care areas, in three of four smoke zones within the components has been completed. 2) Maintenance director will be educated on annual inspections and testing of the electrical outlets in the patient care areas. 3) NHA/designee will audit life safety books for required regulatory documentation semi-annually. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
Aventura at Pembrooke (PA)
Spot-checks: monthly × 4 weeks
✓ Passed Re-Inspection
0914: Electrical Systems - Maintenance and Testing: The facility failed to provide documentation verifying non-hospital grade electrical receptacles had been inspected, in seven of seven smoke…
View Full Plan Text (07/08/2026)
K0914 Correction Date: 08/05/2026
0914: Electrical Systems - Maintenance and Testing: The facility failed to provide documentation verifying non-hospital grade electrical receptacles had been inspected, in seven of seven smoke zones within the component. No residents were affected. All residents have the potential to be affected. Facility wide audit to be completed by the Maintenance Director/Designee by 05AUG2026 to ensure that all receptacles are operating properly and documented. On 21JUL2026, NHA educated the Maintenance Director on the importance of maintaining documentation per regulatory requirements. The Maintenance Director/Designee will conduct compliance audits monthly x 3 weeks then annually, to ensure that documentation for electrical receptacle inspection meet the requirement per regulation. NHA/Designee will audit quarterly Life Safety Binder with Maintenance Director to ensure compliance. Results will be submitted to quarterly to the Quality Assurance Performance Improvement Committee for review and recommendations.
Laurel Lakes Rehabilitation and Wellness Center (PA)
Spot-checks: monthly × 4 weeks
✓ Passed Re-Inspection
1. The facility completed inspection and testing of all non-hospital-grade electrical receptacles located in patient care areas in accordance with NFPA 99 requirements. Any deficient…
View Full Plan Text (05/06/2026)
K0914 Correction Date: 06/25/2026
1. The facility completed inspection and testing of all non-hospital-grade electrical receptacles located in patient care areas in accordance with NFPA 99 requirements. Any deficient receptacles identified during testing were repaired or replaced.
2. The Director of Plant Operations, or designee, conducted a facility-wide review of all patient care areas to identify non-hospital-grade receptacles requiring annual testing and documentation. All applicable receptacles were inspected and documented to ensure compliance throughout the component.
3. Maintenance staff were educated regarding NFPA 99 electrical receptacle testing and documentation requirements.
4. The Director of Plant Operations, or designee, will: - Review preventive maintenance schedules monthly to verify required inspections are current. - Audit receptacle testing documentation quarterly for completeness and compliance. - Report compliance findings through the facility's Quality Assurance and Performance Improvement (QAPI) process for a minimum of three months, then quarterly thereafter. Any identified deficiencies will be corrected immediately.