In Pennsylvania, state surveyors recorded 41 citations for K0511 (K-511: Utilities, HVAC, and Medical Gas Equipment Compliance) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Montgomery, Philadelphia, Bucks counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active PA Counties: Montgomery County (13) → Philadelphia County (11) → Bucks County (4) → Berks County (2) → York County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0511 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-511, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0511

Centennial Healthcare and Rehabilitation Center (PA)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

Blanks were installed in the basement transformer room electrical panels. Circuit breakers have the potential to be effected. Maintenance will be educated on maintaining protection of…

View Full Plan Text (07/15/2026)
K0511 Correction Date: 09/01/2026 Blanks were installed in the basement transformer room electrical panels. Circuit breakers have the potential to be effected. Maintenance will be educated on maintaining protection of electrical equipment. Random audits will be conducted by the Maintenance or designee to ensure protection of electrical equipment is maintained Monthly x2 with reports to QAPI
Pottstown Skilled Nursing and Rehabilitation Center (PA)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

The outlet in the Housekeeping Director's office has been replaced and corrected. 1. The other outlets in question have a ground fault breaker in the panel. 2. To ensure there are no other…

View Full Plan Text (06/01/2026)
K0511 Correction Date: 07/31/2026 The outlet in the Housekeeping Director's office has been replaced and corrected. 1. The other outlets in question have a ground fault breaker in the panel. 2. To ensure there are no other areas of deficient practice, the maintenance director and staff will complete a facility audit to identify any incorrect outlets. 3. The Maintenance Director and staff have been educated on safety requirements and when to use a GFCI outlet. 4. To prevent recurrence, the facility will complete monthly outlet inspections to ensure compliance. The results will be reviewed monthly at QAPI. 5. Date of compliance is 7/31/2026
Spring Creek Rehabilitation and Nursing Center (PA)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

The 4th floor electrical panel, located across from Resident resident room, was immediately locked and secured. The Nursing Home Administrator will educate the maintenance team to ensure that…

View Full Plan Text (05/01/2026)
K0511 Correction Date: 06/03/2026 The 4th floor electrical panel, located across from Resident resident room, was immediately locked and secured. The Nursing Home Administrator will educate the maintenance team to ensure that all electrical panels are locked and secure. Random monthly audits will be done by Nursing Home Administrator/designee to ensure all electrical panels are locked and secured for compliance. Results of the audits will be reviewed/reported to the monthly QAPI committee to determine trends/compliance. QAPI committee will determine the need for continuance of audits.