Pennsylvania K-353 Plan of Correction Guide
K0353 · Sprinkler System - Maintenance, Inspection, and 18-Inch Storage Clearance
Build K-353 Plan & Binder →
✓
2025–26 PA Citations: 383
✓
Common Audit Schedule: weekly for 4 weeks
✓
Checklist Source: LSC-K0353
In Pennsylvania, state surveyors recorded 383 citations for K0353 (K-353: Sprinkler System - Maintenance, Inspection, and 18-Inch Storage Clearance) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Allegheny, Philadelphia, Montgomery counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.
What Surveyors Check Onsite
- Do staff maintain at least 18 inches of vertical safety clearance below sprinkler heads in dietary, linen, and supply closets?
- Are sprinkler heads in resident rooms and corridors clean and free of paint, lint, or hanging items during maintenance inspection?
- Are quarterly flow tests and annual sprinkler inspection logs current in the facility maintenance binder?
3-Question Hallway Spot-Quiz
Review with nurses & CNAs during your 5-minute shift huddle:
- How many inches of open safety space must staff keep below sprinkler heads on top shelves of storage closets?
- Can staff ever hang privacy curtains, clothes, or wires from sprinkler piping in a resident room?
- Where does the maintenance director keep quarterly and annual sprinkler inspection records?
Approved State Plan Examples for K0353
Concordia at Rp Home (PA)
Spot-checks: weekly × 4 weeks
✓ Passed Re-Inspection
1) Mongovi Fire Service to repair faulty control valve and 2 sprinklery switches on 8/28/26. Workorder on file with NHA. 2) Escutcheon Plates replaced on office area to reported locations.…
View Full Plan Text (08/17/2026)
K0353 Correction Date: 10/01/2026
1) Mongovi Fire Service to repair faulty control valve and 2 sprinklery switches on 8/28/26. Workorder on file with NHA. 2) Escutcheon Plates replaced on office area to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 3) Escutcheon Plates replaced on 3rd Floor nears front stairwell area to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 4) Escutcheon Plates replaced on foyer to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 5) All sprinkler head audited to ensure escutcheon places to ensure located in place. 6) Wires removed from the sprinkler line near resident room upon discovery. 7) Supply room on the third floor ceiling tile will be replaced to cover conduit. work order available.
8. Penetration in the electoral equipment room applied to meet requirement. Work order on file with NHA. 9_ QAPI Committee aware of citations and updates
Graduate Post Acute (PA)
Spot-checks: monthly × 4 weeks
✓ Passed Re-Inspection
1. The required fire-pump run was completed and documented. 2. The Maintenance Director/designee audited the available fire-pump testing records for the previous 12 months. Missing…
View Full Plan Text (08/11/2026)
K0353 Correction Date: 09/23/2026
1. The required fire-pump run was completed and documented.
2. The Maintenance Director/designee audited the available fire-pump testing records for the previous 12 months. Missing documentation was identified, and the testing calendar was verified.
3. Maintenance staff were educated on the required frequency, duration, documentation, and retention of fire-pump testing records.
4. The Administrator/designee will audit fire-pump testing records monthly for three months. Missed testing or documentation will be immediately addressed. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
Asbury Health Center (PA)
Spot-checks: weekly × 4 weeks
✓ Passed Re-Inspection
The automatic sprinkler system will be fixed before POC completion date. NHA or designee will educate maintenance director on sprinkler system requirements and routine inspections. Maintenance…
View Full Plan Text (08/10/2026)
K0353 Correction Date: 09/16/2026
The automatic sprinkler system will be fixed before POC completion date. NHA or designee will educate maintenance director on sprinkler system requirements and routine inspections. Maintenance director or designee will audit the sprinkler system and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.