Pennsylvania K-161 Plan of Correction Guide

K0161 · Construction Deficiencies

Build K-161 Plan & Binder →
✓ 2025–26 PA Citations: 40
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Pennsylvania, state surveyors recorded 40 citations for K0161 (K-161: Construction Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Lycoming, Lackawanna, Philadelphia counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active PA Counties: Lycoming County (4) → Lackawanna County (4) → Philadelphia County (3) → Montgomery County (3) → Luzerne County (3) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0161 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-161, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0161

Margaret E. Moul Home (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. The horizontal fire door located on the 2nd floor East Hall above the drop ceiling by the Unit 3 Nursing Station is not used by facility staff or vendors, nor does it lead to an area that…

View Full Plan Text (08/24/2026)
K0161 Correction Date: 09/30/2026 1. The horizontal fire door located on the 2nd floor East Hall above the drop ceiling by the Unit 3 Nursing Station is not used by facility staff or vendors, nor does it lead to an area that has any building systems that may require maintenance or service. Therefore, it will be sealed off with 1hr fire rated sheetrock and then sealed with fire rated caulk to close it off. 2. All horizontal fire doors will be inspected to ensure they are not accessible and properly covered and sealed with 1hr fire rated sheetrock, and fire rated caulk. 3. Director of Environmental Services, or designee will audit horizontal fire doors quarterly for 3 quarters to ensure compliance. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
Graduate Post Acute (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. The expanding foam around the ceiling penetrations above the ground-floor lobby was removed. 2. The Maintenance Director/designee inspected all construction and renovation areas for…

View Full Plan Text (08/11/2026)
K0161 Correction Date: 09/23/2026 1. The expanding foam around the ceiling penetrations above the ground-floor lobby was removed. 2. The Maintenance Director/designee inspected all construction and renovation areas for unapproved foam and improperly sealed penetrations. Identified concerns were corrected. 3. Maintenance staff and contractors were educated on approved penetration-sealing materials and the prohibition against using unapproved expanding foam. 4. The Maintenance Director/designee will audit active construction areas weekly x 4 and monthly for two months. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
Pottstown Skilled Nursing and Rehabilitation Center (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. The facility would like to have an FSES completed. 2. Upon completion, the results of the FSES survey will be reviewed at QAPI. 3. Date of compliance:8/21/2026

View Full Plan Text (06/01/2026)
K0161 Correction Date: 08/21/2026 1. The facility would like to have an FSES completed. 2. Upon completion, the results of the FSES survey will be reviewed at QAPI. 3. Date of compliance:8/21/2026