SA SurveyAnchor
State Guides › Pennsylvania › K-111 (K0111)

Pennsylvania K-111 Plan of Correction Guide

K0111 · Construction Deficiencies

Build K-111 Plan & Binder →
✓ 2025–26 PA Citations: 5
✓ Common Audit Schedule: monthly for 2 months
✓ Checklist Source: CMS Life Safety Code

In Pennsylvania, state surveyors recorded 5 citations for K0111 (K-111: Construction Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Pennsylvania were most active in Butler, Mercer, Erie counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and monthly for 2 months audit logs reviewed by the monthly QAPI committee.

Active PA Counties: Butler County (2) → Mercer County (1) → Erie County (1) → Chester County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0111 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-111, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0111

Alpine Valley Post Acute and Healthcare Center (PA)
Spot-checks: monthly × 2 months Approved Filing

1. The emergency exit sign was temporarily removed, and emergency exit plan was temporarily updated. 2. NHA and Maintenance Director re-educated that when there are renovations blocking a…

View Full Plan Text (09/02/2026)
K0111 Correction Date: 09/17/2026 1. The emergency exit sign was temporarily removed, and emergency exit plan was temporarily updated. 2. NHA and Maintenance Director re-educated that when there are renovations blocking a means of egress emergency exit, the sign needs to be removed, and alternative emergency paths needs to be developed. 3. Maintenance Director or designee will complete random audits monthly for 2 months and then quarterly for 12 months to exit signage is removed when renovation is blocking a means of egress. Audit findings will be reported to the monthly QAA for review and recommendations
Customize & Print 4-Sheet Revisit Binder →