Ohio K-912 Plan of Correction Guide

K0912 · Gas, Vacuum, and Electrical Systems Deficiencies

Build K-912 Plan & Binder →
✓ 2025–26 OH Citations: 10
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Ohio, state surveyors recorded 10 citations for K0912 (K-912: Gas, Vacuum, and Electrical Systems Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Ohio were most active in Trumbull, Medina, Marion counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active OH Counties: Trumbull County (2) → Medina County (1) → Marion County (1) → Lorain County (1) → Hamilton County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0912 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-912, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0912

Twinbrook Healthcare and Rehabilitation Center (PA)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

1. The Maintenance Director or Designee will replace the emergency circuit (red) receptable located in east hall med room and the receptacle located in the west hall soiled utility room with…

View Full Plan Text (04/22/2026)
K0912 Correction Date: 05/08/2026 1. The Maintenance Director or Designee will replace the emergency circuit (red) receptable located in east hall med room and the receptacle located in the west hall soiled utility room with the appropriate ground fault circuit interrupter (GFCI) by May 1, 2026. The Regional Maintenance Director will re-educate the maintenance staff on NFPA 70 by May 1, 2026. The results will be reported to the Quality Assurance and Performance Improvement Committee for review at the next monthly meeting.
Carnegie Park Post Acute (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

The facility has corrected the deficiency. On March 10, 2026, the electrical receptacle in the clean utility room in Medbridge was repaired and a proper cover was installed. A facility-wide…

View Full Plan Text (03/10/2026)
K0912 Correction Date: 04/27/2026 The facility has corrected the deficiency. On March 10, 2026, the electrical receptacle in the clean utility room in Medbridge was repaired and a proper cover was installed. A facility-wide inspection of electrical receptacles was conducted to ensure all are properly covered and maintained. The Maintenance Director or designee will monitor compliance during routine environmental rounds. Completion date: March 10, 2026.