SA SurveyAnchor
State Guides › Ohio › K-232 (K0232)

Ohio K-232 Plan of Correction Guide

K0232 · Egress Deficiencies

Build K-232 Plan & Binder →
✓ 2025–26 OH Citations: 19
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Ohio, state surveyors recorded 19 citations for K0232 (K-232: Egress Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Ohio were most active in Hamilton, Summit, Stark counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active OH Counties: Hamilton County (3) → Summit County (2) → Stark County (2) → Franklin County (2) → Warren County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0232 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-232, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0232

Williamsport Nursing and Rehabilitation (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

We respectfully request consideration for a desk review for this plan of correction due to the low number of deficiencies cited and low scope and severity associated with this survey. Any…

View Full Plan Text (08/11/2026)
K0232 Completion Date: 08/28/2026 We respectfully request consideration for a desk review for this plan of correction due to the low number of deficiencies cited and low scope and severity associated with this survey. Any residents on the 1. a-wing (100 hall) could have been affected by this deficiency. The two benches were removed from the facility. 2. No other residents were ensure that all staff are aware of the need to keep corridors clear and free from obstructions. Maintenance supervisor, 4. or designee, will complete a weekly audit using the "corridor clearance" QAPI tool (see attachment A) to ensure that the corridor remain clear and free from obstructions.Any issues will be corrected immediately, and the audit results will be brought to the QAPI meeting ongoing for discussion and/or resolution. 5. This will be completed by 8/28/26.
Majestic Care of McCordsville (IN)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

Corrective Action for the Finding: The facility reviewed the deficiency for Aisle, Corridor or Ramp Width. The facility was found to not have the required corridor width of 48 inches serving…

View Full Plan Text (08/11/2026)
K0232 Completion Date: 09/30/2026 K232 Corrective Action for the Finding: The facility reviewed the deficiency for Aisle, Corridor or Ramp Width. The facility was found to not have the required corridor width of 48 inches serving as a means of egress. An FSEF evaluation will be conducted for the deficiency in question. Identification of Other Residents/Areas Potentially Affected: An FSES evaluation was conducted on 9/04/2026to ensure the facility receives a passing score with the aisle, corridor, and ramp width. An FSES evaluation will be conducted yearly to determine if the facility is in compliance. Monitoring: The QAPI committee will monitor monthly X 12 months the on-going implementation of current facility policy and procedures to ensure appropriate and consistent implementation, which meet the standards and quality of care needs for the facility and the residents.
Customize & Print 4-Sheet Revisit Binder →